Download PDF - Anchor Environmental
Download PDF - Anchor Environmental
Download PDF - Anchor Environmental
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Verlorenvlei Estuary Management Plan<br />
Introduction<br />
The Terms of Reference for the development of the EMP for Verlorenvlei required that the following<br />
aspects be addressed:<br />
• Phase 1: Field visit to assess the current status and health of Verlorenvlei and preparation<br />
of a Situation Assessment;<br />
• Phase 2: Draft Estuary Management Plan - Setting the Vision, Objectives, Management<br />
Strategies and Management Action Plans for the Verlorenvlei Estuary (including an Estuary<br />
Zoning Plan) and designing a monitoring and evaluation programme.<br />
The Situation Assessment (Phase 1) was prepared based on available information and the insights<br />
developed during site visits and stakeholder workshops (CSIR, 2009b). The Situation Assessment<br />
included the following:<br />
• Legal requirements relevant to Verlorenvlei Estuary;<br />
• The biophysical environment;<br />
• Requirements stipulated in existing management strategies;<br />
• The socio-economic environment;<br />
• Conservation planning or Ramsar management strategies;<br />
• Exploitation of living resources (fishing); and<br />
• Provide detail on gaps in the knowledgebase and future research needs.<br />
This 2 nd phase provides the draft EMP for the Verlorenvlei. The plan is organized into the three main<br />
phases identified in the generic EMP framework (Figure 1), namely:<br />
• Part 1: Situation Assessment (Auditing));<br />
• Part 2: Resource Objectives & Zoning;<br />
• Part 3: Detailed Implementation Plans.<br />
Part 4 contains the roles and responsibilities of the Verlorenvlei Estuary Forum, while Part 5 contains<br />
the Appendices to this document.<br />
This Verlorenvlei EMP, including all its supporting documentation, should be viewed as a “living” document<br />
to which stakeholders are continuously contributing and refining through implementation.<br />
Important to note is that the EMP for Verlorenvlei is NOT an isolated plan! To be effective and sustainable<br />
the EMP must be embedded in overarching national, regional and local plans. For example, at the local level<br />
the Verlorenvlei EMP must be embedded in the local Integrated Development Plan (IDP) and the Spatial<br />
Development Framework (SDF).<br />
Also, this EMP is not a “new” management initiative, it merely aims to provide a structured approach<br />
through which to integrate and optimize the numerous (often sectorally-based) management initiatives<br />
already being implemented (or should be implemented) in the area under different legal mandates.<br />
3