Download PDF - Anchor Environmental
Download PDF - Anchor Environmental
Download PDF - Anchor Environmental
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Verlorenvlei Estuary Management Plan<br />
Part 3: Detailed Implementation Plans<br />
ACTION 4.2: Develop and implement protocol for reed management in Verlorenvlei (addressing excessive<br />
growth, harvesting (e.g. for thatching) and burning)<br />
Related Strategic<br />
Objective/s<br />
Relevant legislation<br />
Responsible agent<br />
Estimated Budget<br />
Timeframe<br />
Priority<br />
Ecological health of ecosystem is improved<br />
Further degradation (negative trajectory) of Verlorenvlei ecosystem is halted<br />
Water Act (No 36 of 1998)<br />
Conservation of Agricultural Resources Act (No 43 of 1983)<br />
Department of Water Affairs<br />
Department of Agriculture, Forestry and Fisheries<br />
R 10 million<br />
Initiate within next 5 years, then ongoing<br />
High<br />
ACTION 4.3: Manage and control salt marsh grazing in Verlorenvlei<br />
Related Strategic<br />
Objective/s<br />
Relevant legislation<br />
Responsible agent<br />
Estimated Budget <br />
Timeframe<br />
On going<br />
Priority<br />
High/medium/low<br />
Ecological health of ecosystem is improved<br />
Further degradation (negative trajectory) of Verlorenvlei ecosystem is halted<br />
Water Act (No 36 of 1998)<br />
Conservation of Agricultural Resources Act (No 43 of 1983)<br />
Department of Water Affairs<br />
Department of Agriculture, Forestry and Fisheries<br />
3.4.3 Detailed Management Action Plans for Priority Actions<br />
Once the priority actions have been identified, the appointed Technical Working Groups (or liaison<br />
teams) will be required to prepare detailed management action plans for these actions. A template<br />
for the preparation of MAPs is as follows:<br />
ACTION ……<br />
Requirements stipulated in policy<br />
and legislation<br />
Available methods, protocols and<br />
best practice-guides<br />
Operational Specifications/<br />
Links to EZP<br />
Detailed work plan<br />
Scheduling<br />
Responsibilities<br />
Monitoring plan<br />
Human Resource Plan<br />
Financial Resource Plan<br />
………………………<br />
3.4.4 Monitoring Plans<br />
Give some indication of the type of monitoring to be included within this sector<br />
Page 3-5