08.01.2015 Views

Download PDF - Anchor Environmental

Download PDF - Anchor Environmental

Download PDF - Anchor Environmental

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Verlorenvlei Estuary Management Plan<br />

Part 3: Detailed Implementation Plans<br />

ACTION 4.2: Develop and implement protocol for reed management in Verlorenvlei (addressing excessive<br />

growth, harvesting (e.g. for thatching) and burning)<br />

Related Strategic<br />

Objective/s<br />

Relevant legislation<br />

Responsible agent<br />

Estimated Budget<br />

Timeframe<br />

Priority<br />

Ecological health of ecosystem is improved<br />

Further degradation (negative trajectory) of Verlorenvlei ecosystem is halted<br />

Water Act (No 36 of 1998)<br />

Conservation of Agricultural Resources Act (No 43 of 1983)<br />

Department of Water Affairs<br />

Department of Agriculture, Forestry and Fisheries<br />

R 10 million<br />

Initiate within next 5 years, then ongoing<br />

High<br />

ACTION 4.3: Manage and control salt marsh grazing in Verlorenvlei<br />

Related Strategic<br />

Objective/s<br />

Relevant legislation<br />

Responsible agent<br />

Estimated Budget <br />

Timeframe<br />

On going<br />

Priority<br />

High/medium/low<br />

Ecological health of ecosystem is improved<br />

Further degradation (negative trajectory) of Verlorenvlei ecosystem is halted<br />

Water Act (No 36 of 1998)<br />

Conservation of Agricultural Resources Act (No 43 of 1983)<br />

Department of Water Affairs<br />

Department of Agriculture, Forestry and Fisheries<br />

3.4.3 Detailed Management Action Plans for Priority Actions<br />

Once the priority actions have been identified, the appointed Technical Working Groups (or liaison<br />

teams) will be required to prepare detailed management action plans for these actions. A template<br />

for the preparation of MAPs is as follows:<br />

ACTION ……<br />

Requirements stipulated in policy<br />

and legislation<br />

Available methods, protocols and<br />

best practice-guides<br />

Operational Specifications/<br />

Links to EZP<br />

Detailed work plan<br />

Scheduling<br />

Responsibilities<br />

Monitoring plan<br />

Human Resource Plan<br />

Financial Resource Plan<br />

………………………<br />

3.4.4 Monitoring Plans<br />

Give some indication of the type of monitoring to be included within this sector<br />

Page 3-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!