Verlorenvlei Estuary Management Plan<br />

Part 4: Verlorenvlei Estuary Forum<br />

NAME ORGANISATION TEL E-MAIL<br />

Sean Ranger Ranger Consulting P.S.A 0832948776 Sean.ranger@gmail.com<br />

Francois van Heerden<br />

DWA:O/D<br />

0274822233/<br />

0828073539<br />

vheerdf@dwaf.gov.za<br />

Johan Burger CapeNature 022 9312900 jburger@capenature.co.za<br />

Adrie Steinberg CapeNature 0229312900 adrie@gcbc.co.za<br />

Paul Jones EBEDAG 0824923527<br />

paul@elandsbayguesthouse.co.z<br />

a<br />

Diteboho Ramongolo DAFF 0219489278 ditebohoR@daff.gov.za<br />

Steven Lamberth DAFF 021 402 3159 StephenL@daff.gov.za<br />

However, the importance of introducing the Verlorenvlei EMP to other management initiatives –<br />

ultimately the role of the Estuary Forum - in the area, e.g. the Annual Review of the IDP of the<br />

Cederberg Municipality, was stressed. Until such time as the Estuary Forum is officially established,<br />

workshop participants agreed that representatives of the local communities should attend the other<br />

management initiatives to ensure that the EMP and its aims are communicated from the outset.<br />

To be effective from an operational perspective, the EF also needs to establish an Executive team<br />

directly responsible for the implementation of the plan. An Executive team typically consists of:<br />

<br />

A chairperson, to be elected by the forum and to take the lead in the development and<br />

implementation of the EMP.<br />

<br />

Technical Working Groups (TWGs) or Sub-committees for each of the key issues packages<br />

identified by stakeholders (see below).<br />

Initially it was envisaged that TWGs would be established at the September 2009 Stakeholder<br />

Workshop, but stakeholders were of the opinion that participation at that workshop were not fully<br />

representative of all the local communities. Some of the authorities were also not adequately<br />

represented. It was therefore considered inappropriate to establish the EF or TWGs at this point and<br />

that this had to be done at a later stage.<br />

The following technical working groups (or liaison teams) have been proposed (Felicity Strange, pers.<br />

comm.):<br />

<br />

<br />

<br />

<br />

<br />

<br />

Agriculture liaison team (must include 2 farmers as a minimum);<br />

Enforcement liaison team, consisting of staff from municipality and relevant authorities with<br />

executive powers (ensuring law enforcement);<br />

Conservation, living resources and land use liaison team;<br />

Water quantity and quality liaison team;<br />

Enterprise and entrepreneurial liaison team; and<br />

Empowerment liaison team.<br />

A 3rd Stakeholder workshop will establishing the EF and the TWGs to ensure that responsible<br />

authorities and local communities take ownership of the EMP, a crucial element towards achieving<br />

the vision and strategic objectives of this plan, now and in future.<br />

Page 4-3