Download PDF - Anchor Environmental
Download PDF - Anchor Environmental
Download PDF - Anchor Environmental
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Verlorenvlei Estuary Management Plan<br />
Part 3: Detailed Implementation Plans<br />
Estimated Budget -<br />
Timeframe<br />
1 year<br />
Priority<br />
High<br />
ACTION 7.3: Increase environmental law enforcement and compliance capacity with respect to water<br />
quantity (abstractions)<br />
Related Strategic<br />
Objective/s<br />
Further degradation (negative trajectory) of Verlorenvlei ecosystem is halted<br />
Ecological health of ecosystem is improved<br />
Relevant legislation National Water Act (No 36 of 1998)<br />
Responsible agent Department of Water Affairs<br />
Estimated Budget -<br />
Timeframe<br />
1 year<br />
Priority<br />
High<br />
ACTION 7.4: Increase environmental law enforcement and compliance with respect to infra-structure<br />
development and land-use<br />
Related Strategic<br />
Objective/s<br />
Relevant legislation<br />
Responsible agent<br />
Estimated Budget R300 000<br />
Timeframe<br />
1 – 2 years<br />
Priority<br />
High<br />
Further degradation (negative trajectory) of Verlorenvlei ecosystem is halted<br />
Ecological health of ecosystem is improved<br />
Local Government: Municipal Systems Act (No 32 of 2000)<br />
National <strong>Environmental</strong> Management: Integrated Coastal Management Act (No 24 of<br />
2008)<br />
Conservation of Agricultural Resources Act (No 43 of 1983)<br />
Municipality<br />
Department of Environment Affairs/CapeNature<br />
Department of Agriculture, Forestry and Fisheries<br />
ACTION 3.5: Develop a safety and security plan for the Verlorenvlei area (e.g. “Buurtwag”)<br />
Related Strategic<br />
Objective/s<br />
The community (farmers, fishers, residents, commercial concerns, NGOs, authorities,<br />
etc) functions in an integrated, cooperative manner through a trusting and fully<br />
representative Estuary Forum<br />
Relevant legislation<br />
Responsible agent South African Police and community<br />
Estimated Budget -<br />
Timeframe<br />
1 – 2 years<br />
Priority<br />
High<br />
3.7.3 Detailed Management Action Plans for Priority Actions<br />
Once the priority actions have been identified, the appointed Technical Working Groups (or liaison<br />
teams) will be required to prepare detailed management action plans for these actions. A template<br />
for the preparation of MAPs is as follows:<br />
ACTION ……<br />
Requirements stipulated in policy<br />
and legislation<br />
Available methods, protocols and<br />
best practice-guides<br />
Operational Specifications/<br />
Links to EZP<br />
………………………<br />
Page 3-2