ConstruCtion researCH and development faCility<br />
Client<br />
NRW Construction and Properties Office,<br />
Dortmund office<br />
project duration<br />
August 2011 – October 2016<br />
architect<br />
Leon Wohlhage Wernik architects, Berlin<br />
Whether lounge, foyer or refectory: Consistent color and design concepts<br />
ensure open and varied rooms<br />
Key project data<br />
– GFA: 44,000 m 2<br />
– Gross volume: 184,000 m 3<br />
– Investment volume:<br />
Approx. € 92 million gross<br />
– Completion Stage 1: June 2014<br />
– Completion Stage 2: October 2016<br />
drees & sommer services<br />
– For the principal<br />
– Project control<br />
– User coordination<br />
– Planning reviews<br />
– Emulation<br />
– Commissioning management<br />
– For the general planner<br />
– Facade planning<br />
– Energy concept<br />
– Preliminary study for<br />
Green Building certification<br />
value-add achieved for client<br />
– Optimal project preparation through<br />
in-depth planning<br />
– Professional coordination of user<br />
requirements for the principal<br />
– Trusting cooperation and reduction of<br />
client’s workload during project realization<br />
– Transparency of project execution<br />
throughout all phases<br />
– Adherence to budget and schedule<br />
– Fast, solution-oriented holistic<br />
consulting through integration of in-house<br />
competencies<br />
detailed coordination with users<br />
Construction of the University of Health<br />
began in spring <strong>2012</strong>. <strong>Drees</strong> & <strong>Sommer</strong><br />
was commissioned by the NRW<br />
Construction and Properties Office to<br />
undertake project control. For the first<br />
stage (blocks B and C and infrastructure),<br />
the project managers are supporting<br />
the principal from the preparation of<br />
execution phase onwards and for the<br />
second stage (block A) directly from the<br />
project preparation phase onwards,<br />
and are undertaking user coordination,<br />
planning reviews, emulation and commissioning<br />
management. The general<br />
planner has also sought <strong>Drees</strong> & <strong>Sommer</strong><br />
support for facade planning and the<br />
development of an energy concept. The<br />
experts also carried out a preliminary<br />
study to establish whether the campus<br />
could be DGNB-certified.<br />
The special challenge for the entire<br />
project is, above all, the timeline: It is<br />
essential that the University of Health<br />
(first stage) can move in on schedule in<br />
time for Winter Semester 2014. As the<br />
university was only founded in autumn<br />
2009, it is still under development –<br />
with the result that the <strong>Drees</strong> & <strong>Sommer</strong><br />
team is giving priority to determining<br />
user requirements. For the second stage<br />
(block A), too, user coordination with<br />
nine individual users – including state<br />
healthcare institutes – has resulted in<br />
a considerable workload.<br />
project on schedule<br />
Despite the deadline pressure and<br />
extensive coordination with users,<br />
<strong>Drees</strong> & <strong>Sommer</strong> services ensured that<br />
planning was successfully completed.<br />
The project is on schedule within budget,<br />
and the approval phase for the second<br />
phase with subsequent preparation of execution<br />
will follow over the coming months.<br />
Shell construction<br />
work on the<br />
upper floors will also<br />
proceed apace. Optimal<br />
service delivery during the NRW<br />
healthcare campus project was a<br />
significant reason for follow-up contracts<br />
from the NRW Construction and Properties<br />
Office.<br />