ConstruCtion of new offiCe buildings<br />
Client<br />
Vodafone GmbH, Düsseldorf<br />
project duration<br />
October 2008 – December <strong>2012</strong><br />
architect<br />
HPP International Planungsgesellschaft mbH,<br />
Düsseldorf<br />
specific requirements was a key task.<br />
This was because the Vodafone Campus<br />
was intended not only to consolidate<br />
various locations throughout Düsseldorf,<br />
but also to introduce a new office and<br />
communication structure and to realize<br />
this architecturally. This was reflected in<br />
the user requirement to have ‚paperless<br />
office‘ and mobile working implemented<br />
throughout the entire building.<br />
one company for vodafone<br />
Interdisciplinary <strong>Drees</strong> & <strong>Sommer</strong><br />
expertise was required for the successful<br />
implementation of the project. In<br />
keeping with the motto ‚as much as<br />
necessary, as little as possible‘,<br />
technical & economic controlling showed<br />
clearly how early decisions can impact<br />
on later construction. Cost/benefitoptimized<br />
coordination of architecture<br />
and technical systems was particularly<br />
important during the investor selection<br />
phase to ensure timely conclusion of<br />
the lease agreement.<br />
In a major project with 46,000 square<br />
meters of facade cladding, 13,000 tonnes<br />
of steel construction and approx. 90,000<br />
cubic meters of concrete – sufficient to<br />
build about 900 single-family homes –<br />
it is important to ensure that all involved<br />
maintain an overview and that changes<br />
requested by the tenant are implemented<br />
as soon as possible. To achieve this,<br />
<strong>Drees</strong> & <strong>Sommer</strong> actively supported the<br />
interface between tenant and investor.<br />
This required additional services on<br />
the part of <strong>Drees</strong> & <strong>Sommer</strong>, including<br />
responsibility for the coordination of<br />
the tenant fitout in the areas of IT and<br />
telephone systems, as well as for the<br />
installation of the campus-wide media<br />
technology.<br />
it interpreter between the client and<br />
engineers<br />
During the construction phase, Vodafone<br />
IT professionals provided intensive<br />
support, because although the architecture<br />
addressed the requirements of<br />
modern telecommunications technology,<br />
intervention was often required to ensure<br />
the best-possible IT solution. As a result,<br />
the project managers undertook a comprehensive<br />
needs analysis right down<br />
to individual user level to address the<br />
different requirements of the Vodafone<br />
departments. For example, a service<br />
center requires a different IT infrastructure<br />
to administrative offices.<br />
This allowed the actual requirements<br />
for the backup power supply and the<br />
availability of the communication components<br />
to be determined with Vodafone<br />
stakeholders and incorporated into the<br />
project via the landlord.<br />
Clearly coordinated facility management<br />
is required to ensure that everything<br />
runs smoothly during commissioning.<br />
In this case, the FM strategy for the<br />
Vodafone Campus was linked to Vodafone<br />
Germany‘s portfolio strategy. In<br />
the course of the reorganization and<br />
re-tendering of all operator and FM<br />
services for all properties in Germany,<br />
<strong>Drees</strong> & <strong>Sommer</strong> managed a tendering<br />
process to find and appoint a new<br />
strategic partner for Vodafone. A<br />
customized start-up concept for the<br />
portfolio – specially tailored to the new<br />
campus – ensured that the new operator<br />
was involved in commissioning and<br />
acceptance from an early stage and<br />
was able to assume operational responsibility<br />
directly.<br />
Friendly reception: The spacious lobby<br />
welcomes visitors to the building<br />
Key project data<br />
– GFA: 85,809 m 2<br />
– Gross volume: 472,530 m 3<br />
– Project cost: € 240 million<br />
– Workplaces: 4,700<br />
drees & sommer services<br />
– Project control/tenant management<br />
– Technical & economic controlling<br />
– Facility management consulting<br />
– Tenant fitout consulting<br />
– Integration of IT/telecommunication systems<br />
– Engineering<br />
value-add achieved for client<br />
– Comprehensive tenant and interface<br />
management ensure implementation of<br />
tenant requests to investor/principal<br />
– Reduction of workload for client‘s<br />
construction department through temporary<br />
assignment of experts<br />
– User-friendly and timely building handover<br />
through participation in determination of<br />
basic design data and interface review<br />
– Tenants’ technical requirements met thanks<br />
to technical & economic controlling<br />
Modern, bright workplaces on all levels:<br />
The paperless offices are user friendly and<br />
designed for flexibility<br />