ConstruCtion of new offiCe buildings<br />

Client<br />

Vodafone GmbH, Düsseldorf<br />

project duration<br />

October 2008 – December <strong>2012</strong><br />

architect<br />

HPP International Planungsgesellschaft mbH,<br />

Düsseldorf<br />

specific requirements was a key task.<br />

This was because the Vodafone Campus<br />

was intended not only to consolidate<br />

various locations throughout Düsseldorf,<br />

but also to introduce a new office and<br />

communication structure and to realize<br />

this architecturally. This was reflected in<br />

the user requirement to have ‚paperless<br />

office‘ and mobile working implemented<br />

throughout the entire building.<br />

one company for vodafone<br />

Interdisciplinary <strong>Drees</strong> & <strong>Sommer</strong><br />

expertise was required for the successful<br />

implementation of the project. In<br />

keeping with the motto ‚as much as<br />

necessary, as little as possible‘,<br />

technical & economic controlling showed<br />

clearly how early decisions can impact<br />

on later construction. Cost/benefitoptimized<br />

coordination of architecture<br />

and technical systems was particularly<br />

important during the investor selection<br />

phase to ensure timely conclusion of<br />

the lease agreement.<br />

In a major project with 46,000 square<br />

meters of facade cladding, 13,000 tonnes<br />

of steel construction and approx. 90,000<br />

cubic meters of concrete – sufficient to<br />

build about 900 single-family homes –<br />

it is important to ensure that all involved<br />

maintain an overview and that changes<br />

requested by the tenant are implemented<br />

as soon as possible. To achieve this,<br />

<strong>Drees</strong> & <strong>Sommer</strong> actively supported the<br />

interface between tenant and investor.<br />

This required additional services on<br />

the part of <strong>Drees</strong> & <strong>Sommer</strong>, including<br />

responsibility for the coordination of<br />

the tenant fitout in the areas of IT and<br />

telephone systems, as well as for the<br />

installation of the campus-wide media<br />

technology.<br />

it interpreter between the client and<br />

engineers<br />

During the construction phase, Vodafone<br />

IT professionals provided intensive<br />

support, because although the architecture<br />

addressed the requirements of<br />

modern telecommunications technology,<br />

intervention was often required to ensure<br />

the best-possible IT solution. As a result,<br />

the project managers undertook a comprehensive<br />

needs analysis right down<br />

to individual user level to address the<br />

different requirements of the Vodafone<br />

departments. For example, a service<br />

center requires a different IT infrastructure<br />

to administrative offices.<br />

This allowed the actual requirements<br />

for the backup power supply and the<br />

availability of the communication components<br />

to be determined with Vodafone<br />

stakeholders and incorporated into the<br />

project via the landlord.<br />

Clearly coordinated facility management<br />

is required to ensure that everything<br />

runs smoothly during commissioning.<br />

In this case, the FM strategy for the<br />

Vodafone Campus was linked to Vodafone<br />

Germany‘s portfolio strategy. In<br />

the course of the reorganization and<br />

re-tendering of all operator and FM<br />

services for all properties in Germany,<br />

<strong>Drees</strong> & <strong>Sommer</strong> managed a tendering<br />

process to find and appoint a new<br />

strategic partner for Vodafone. A<br />

customized start-up concept for the<br />

portfolio – specially tailored to the new<br />

campus – ensured that the new operator<br />

was involved in commissioning and<br />

acceptance from an early stage and<br />

was able to assume operational responsibility<br />

directly.<br />

Friendly reception: The spacious lobby<br />

welcomes visitors to the building<br />

Key project data<br />

– GFA: 85,809 m 2<br />

– Gross volume: 472,530 m 3<br />

– Project cost: € 240 million<br />

– Workplaces: 4,700<br />

drees & sommer services<br />

– Project control/tenant management<br />

– Technical & economic controlling<br />

– Facility management consulting<br />

– Tenant fitout consulting<br />

– Integration of IT/telecommunication systems<br />

– Engineering<br />

value-add achieved for client<br />

– Comprehensive tenant and interface<br />

management ensure implementation of<br />

tenant requests to investor/principal<br />

– Reduction of workload for client‘s<br />

construction department through temporary<br />

assignment of experts<br />

– User-friendly and timely building handover<br />

through participation in determination of<br />

basic design data and interface review<br />

– Tenants’ technical requirements met thanks<br />

to technical & economic controlling<br />

Modern, bright workplaces on all levels:<br />

The paperless offices are user friendly and<br />

designed for flexibility<br />