Construction and upgrading of car dealership<br />

Mercedes-Benz Hamburg subsidiary:<br />

A showcase energy project<br />

Lodestar in terms of sustainability:<br />

The new Mercedes-Benz branch<br />

office in Wandsbek<br />

The showroom in Wandsbek presents the prestige<br />

automobile in an appropriate light<br />

The Mercedes-Benz Hamburg subsidiary with its Wandsbek<br />

and Niendorf branch offices was restructured over a period of<br />

some two and a half years. Ecological optimization was a key<br />

objective. <strong>Drees</strong> & <strong>Sommer</strong> undertook project management<br />

for the general contractor Daimler Real Estate and developed<br />

an innovative energy concept: The energy and heating demands<br />

of the center in Wandsbek are met by a stationary fuel cell.<br />

A total of some €38 million was invested<br />

in the remodeling and new construction<br />

of the branch office. The existing foundations<br />

and parts of the existing building<br />

fabric were retained at both locations.<br />

The Wandsbek center’s distinctive cube<br />

was completely refurbished and its energy<br />

systems upgraded to the state of the art.<br />

The center was also equipped with a new<br />

service workshop. In the Niendorf center,<br />

the sales area was partially demolished,<br />

gutted, refurbished and extended forward<br />

to provide a new showroom.<br />

The Daimler Real Estate project managers<br />

and <strong>Drees</strong> & <strong>Sommer</strong> worked together<br />

to develop an elegant solution for temporary<br />

showrooms during the construction<br />

phase: In Wandsbek, a historic workshop<br />

was quickly converted into a showroom,<br />

with <strong>Drees</strong> & <strong>Sommer</strong> also coordinating<br />

the move with the customer. The showroom<br />

in historical surroundings was a big<br />

hit with Mercedes customers. Instead of<br />

the being demolished as planned, the<br />

hall will be retained and used in future to<br />

house used cars.<br />

The Hamburg <strong>Drees</strong> & <strong>Sommer</strong> team<br />

was responsible for project control and<br />

undertook operational tasks for Daimler<br />

Real Estate’s project leadership,<br />

including liaison with and coordination<br />

of contractors.<br />

Intensive schedule management<br />

Naturally, the showroom had to remain<br />

open to customers during renovation<br />

and construction work: This meant that<br />

the project leadership had to coordinate<br />

all work with the workshop and sales<br />

department in full operation.<br />

The deadline for the completion and<br />

official opening of the Mercedes-Benz<br />

Center was timed to coincide with the<br />

launch of the new A-Class in September<br />

<strong>2012</strong>.<br />

Intensive schedule management was<br />

required to keep to the demanding<br />

schedule. The project managers undertook<br />

a large share of the coordination<br />

on all operational requirements for the<br />

building on site with users during the<br />

planning and construction phases.<br />