Construction and upgrading of car dealership<br />
Mercedes-Benz Hamburg subsidiary:<br />
A showcase energy project<br />
Lodestar in terms of sustainability:<br />
The new Mercedes-Benz branch<br />
office in Wandsbek<br />
The showroom in Wandsbek presents the prestige<br />
automobile in an appropriate light<br />
The Mercedes-Benz Hamburg subsidiary with its Wandsbek<br />
and Niendorf branch offices was restructured over a period of<br />
some two and a half years. Ecological optimization was a key<br />
objective. <strong>Drees</strong> & <strong>Sommer</strong> undertook project management<br />
for the general contractor Daimler Real Estate and developed<br />
an innovative energy concept: The energy and heating demands<br />
of the center in Wandsbek are met by a stationary fuel cell.<br />
A total of some €38 million was invested<br />
in the remodeling and new construction<br />
of the branch office. The existing foundations<br />
and parts of the existing building<br />
fabric were retained at both locations.<br />
The Wandsbek center’s distinctive cube<br />
was completely refurbished and its energy<br />
systems upgraded to the state of the art.<br />
The center was also equipped with a new<br />
service workshop. In the Niendorf center,<br />
the sales area was partially demolished,<br />
gutted, refurbished and extended forward<br />
to provide a new showroom.<br />
The Daimler Real Estate project managers<br />
and <strong>Drees</strong> & <strong>Sommer</strong> worked together<br />
to develop an elegant solution for temporary<br />
showrooms during the construction<br />
phase: In Wandsbek, a historic workshop<br />
was quickly converted into a showroom,<br />
with <strong>Drees</strong> & <strong>Sommer</strong> also coordinating<br />
the move with the customer. The showroom<br />
in historical surroundings was a big<br />
hit with Mercedes customers. Instead of<br />
the being demolished as planned, the<br />
hall will be retained and used in future to<br />
house used cars.<br />
The Hamburg <strong>Drees</strong> & <strong>Sommer</strong> team<br />
was responsible for project control and<br />
undertook operational tasks for Daimler<br />
Real Estate’s project leadership,<br />
including liaison with and coordination<br />
of contractors.<br />
Intensive schedule management<br />
Naturally, the showroom had to remain<br />
open to customers during renovation<br />
and construction work: This meant that<br />
the project leadership had to coordinate<br />
all work with the workshop and sales<br />
department in full operation.<br />
The deadline for the completion and<br />
official opening of the Mercedes-Benz<br />
Center was timed to coincide with the<br />
launch of the new A-Class in September<br />
<strong>2012</strong>.<br />
Intensive schedule management was<br />
required to keep to the demanding<br />
schedule. The project managers undertook<br />
a large share of the coordination<br />
on all operational requirements for the<br />
building on site with users during the<br />
planning and construction phases.<br />
64 65