Construction of new research & development center in China<br />
The organic design elements<br />
in the entrance hall represent<br />
the link between nature and<br />
technology<br />
Planted walls in the communal areas create a healthy climate<br />
International team ensures positive<br />
project communication<br />
Early February 2013 saw the opening<br />
ceremony for the Audi China Building.<br />
<strong>Drees</strong> & <strong>Sommer</strong>‘s role involved the<br />
replanning of the 25,000 square meter<br />
shell and facade and completion of<br />
construction. This included sensitive<br />
changes to the building shell, a complete<br />
redesign of the building services equipment<br />
and the fitout including furnishings<br />
and equipment. The German-Chinese<br />
composition of <strong>Drees</strong> & <strong>Sommer</strong> team<br />
was decisive for the success of project<br />
control.<br />
This allowed both the quality standards<br />
expected by Audi and the project‘s<br />
internal processes to be met while at<br />
the same time ensuring successful<br />
communication between Chinese<br />
planners, construction companies<br />
and the building owners.<br />
High-quality buildings for the premium<br />
marque<br />
In keeping with the standards applied<br />
to its own products, Audi set the bar<br />
high for its R&D Center. The realization of<br />
user requirements and quality standards<br />
within the prescribed planning and<br />
construction period of less than one<br />
year was a major challenge. Quality<br />
control of planning and construction<br />
was a key focus for the project managers.<br />
Due to the lower depth of planning in<br />
China and – in some cases – lower<br />
quality standards, the German-Chinese<br />
team had to make special efforts to<br />
ensure the success of the project.<br />