modernization of offiCe and hotel high-rise<br />
Client<br />
RFR Management GmbH, Frankfurt<br />
project duration<br />
Stage I: May <strong>2012</strong> – December 2013,<br />
with more stages to follow from January 2014<br />
architects<br />
Just Burgeff Architekten, Frankfurt<br />
Clear configurations based on a systematic<br />
design concept ensure high quality<br />
A new start in Westend<br />
thanks to holistic consulting<br />
and a ‚big picture‘ approach<br />
Key project data<br />
– Total area: 55,000 m 2<br />
– Height: 159 m, 47 above-ground levels,<br />
3 basement levels<br />
– Hotel: 588 rooms<br />
– Underground car park: 610 spaces<br />
– Net investment: € 50 million<br />
drees & sommer services<br />
– Project restructuring<br />
– Project management<br />
– Indoor climate concept<br />
– Overall technical building strategy<br />
– Asset value report<br />
– Technical & economic construction consulting<br />
– Facility management consulting<br />
value-add achieved for client<br />
– Cost optimization through strategic tender<br />
and contract award management<br />
– Technical & economic and commercial<br />
synergy effects through single-source<br />
consulting<br />
– Reduction of client workload through<br />
technical advice on individual issues<br />
while at the same time providing higherlevel<br />
support to the overall process<br />
One of the best-known office blocks in Frankfurt – WestendGate – gets a<br />
makeover. The owner decided to modernize to increase the attractiveness<br />
of the building, soon to be 40 years old. The Marriott Hotel in the same<br />
building will also undergo refurbishment. <strong>Drees</strong> & <strong>Sommer</strong> is providing<br />
an interdisciplinary team of specialists and generalists for the project.<br />
What happens to an office tower that<br />
was once the tallest building in Germany,<br />
but where 60 percent of the office space<br />
now stands empty In view of the fierce<br />
competition in the banking center, the<br />
owner, the RFR Group – which purchased<br />
WestendGate at the beginning of <strong>2012</strong> –<br />
chose to take a decisive step. The company<br />
will have the building extensively<br />
modernized, thereby increasing its<br />
attractiveness. This move is designed to<br />
win new tenants and retain existing ones.<br />
Even today, WestendGate offers office<br />
space in one of Frankfurt’s most soughtafter<br />
locations. The entrance is striking<br />
as the building is located directly<br />
opposite Festival Hall at the trade fair<br />
grounds. The environment is captivating<br />
as a result of the dynamism of the adjacent<br />
trade fair with contacts in over 150<br />
countries and the evolved structure with<br />
its mansions and Gründerzeit buildings.<br />
The 160-meter-tall building has<br />
always been a trendsetter for<br />
Frankfurt’s high-rise cityscape<br />