One of three identical Schmidt<br />

Spectrographs offering flexible spectral<br />

resolution and wavelength coverage<br />

Detectors with high quantum efficiency in the blue and<br />

red range<br />

Each of the 3 Spectrographs<br />

Detectors<br />

Collimator f-ratio<br />

f/2.12<br />

Detectors / spectrograph 2<br />

Camera f-ratio<br />

f/1.07<br />

Minimum beam size<br />

~300 mm diameter<br />

Fiber pitch at slit<br />

230 µm, center-center<br />

Projected fiber size at detector<br />

54 µm diameter<br />

SRE* width at detector 54.0 µm<br />

Projected fiber pitch 116.25 µm<br />

* SRE – Spectral Resolution Element<br />

Detector format<br />

Pixel size 16 µm<br />

Red optimization<br />

Blue optimization<br />

AR coating<br />

93 mm x 46.5 mm<br />

5760 x 2880 pixels<br />

450 µm thick fully<br />

depleted p-channel<br />

Delta-doped<br />

custom dual layer<br />

TiO2/SiO2<br />

MANAGEMENT<br />

Development of this ground breaking instrument with an international team is accomplished with a<br />

management strategy developed from a history of delivering complex science instruments.<br />

Partner Responsibility Cost $K<br />

JPL<br />

Mgmnt, Sys Eng.,<br />

Positioner, PFI, A&G,<br />

I&T 27,237<br />

Cambridge Spectrograph 10,383<br />

PSU Positioner Software 563<br />

Caltech Detector System 2,578<br />

LNA Fiber System 3,550<br />

UK-ATC<br />

System Software, Data<br />

Reduction 4,355<br />

UCL Metrology System 1,639<br />

2009 2010 2011 2012 2013 2014<br />

Kickoff<br />

PHASE B PHASE C PHASE D E<br />

1/15<br />

Positioner/ PFI<br />

Fiber System<br />

Project<br />

7/1 PDR<br />

Detector/<br />

Spectrograph System<br />

System Software<br />

Positioner<br />

EM Sys<br />

8/1 Project<br />

CDR<br />

9/12<br />

Integration & TRR<br />

Del Bench<br />

12/12<br />

PSR/SIR<br />

Fiber Cable A<br />

Cable B Rec PFI Del PFI Assembly<br />

to I&T<br />

MGSE Detector<br />

Avail Sys 1 Det 2 Det 3 PSR<br />

Spectrograph<br />

Del Prelim<br />

Sys Software<br />

Ver2<br />

Recipes<br />

Ver3<br />

Recipes<br />

Del Sys SW<br />

Subaru Elements 8,000<br />

Baseline Total 58,305<br />

Reserves 10,222<br />

Instrument<br />

Integration@ JPL<br />

Cable A Cameras Ship<br />

Spectograph<br />

Arrive<br />

Integration @ Subaru<br />

Del<br />

WFMOS<br />

7/11<br />

Total w/ Reserves 68,527