<strong>SUMMARY</strong> REPORT<br />
WIDE FIELD FIBER-FED OPTICAL<br />
MULTI-OBJECT SPECTROMETER (WFMOS)<br />
• Positioner EM completion.<br />
• Detector delivery to JPL for coating and delta doping.<br />
• Software delivery to spectrograph and positioner/PFI I&T.<br />
• Spectrograph/detector system ship to Subaru.<br />
• All final subsystem hardware deliveries to I&T.<br />
• Software and Data Pipeline delivery to Subaru.<br />
• Positioner/PFI ship to Subaru.<br />
• Completion of ATP.<br />
Successful completion of major reviews according to the standards associated with SRR,<br />
PDR, CDR, and PSR are good indicators of overall progress as well as the completion of significant<br />
tests and delivery of hardware assemblies. The detailed set of milestones along with clear<br />
definition of success will be developed further at the start of the study.<br />
Schedule tracking and management are important to this project as they are directly related to<br />
cost. Any schedule slip in one area can result in not only additional effort in that area, but holding<br />
personnel longer in other subsystems if it also impacts the final delivery date. A similar approach<br />
to the cost tracking is taken, collecting schedule status from all the partners on a monthly<br />
basis and using a single integrated project schedule to assess the trends.<br />
Options for schedule recovery are also actions that typically do not impact performance, but<br />
may increase development risk. These can be items such as increasing workforce to accelerate<br />
tasks, replacing analysis with test, eliminating lower-level tests and capturing those objectives at<br />
higher level tests, staggered deliveries, and descopes. Depending on project costs, expedite fees<br />
to vendors may be used.<br />
77