WFMOS Top Level Schedule<br />
2009 2010 2011 2012 2013 2014<br />
F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D<br />
10/1 PHASE B 8/2 PHASE C 10/15 PHASE D 8/1 PH E<br />
MILESTONES 1/15<br />
SRR/Kickoff<br />
INSTRUMENT<br />
Positioner<br />
Prime Focus<br />
Instrument<br />
Fiber System<br />
LL<br />
Del Slit<br />
Blk Dsn<br />
Spectrograph 12/8<br />
SRR<br />
Detector System 11/2<br />
PDR<br />
3/2<br />
PDR<br />
3/15<br />
7/1<br />
Project PDR<br />
PDR<br />
5/17<br />
CDR<br />
7/8<br />
Dsn<br />
Rvw LL PDR<br />
4/7 6/29<br />
LL Optics<br />
Design Report<br />
Metrology System 6/25<br />
PDR CDR<br />
Spectral Cal. Unit Prelim 4/14 7/12<br />
PDR<br />
Data Reduction 7/1<br />
CDR<br />
10/28<br />
CDR<br />
3/28<br />
PDR<br />
1/28<br />
Fiber Cable A<br />
Positioner<br />
EM Sys<br />
4/11<br />
8/1<br />
Project CDR<br />
Del Slit Block<br />
7/15<br />
CDR<br />
11/10<br />
Del Fiber Sys<br />
Cable A<br />
12/29<br />
9/12<br />
Integration & TRR<br />
Del Bench<br />
6/20<br />
Instal<br />
Corrector<br />
Lens<br />
4/11 5/15 Del PFI<br />
10/5 Fiber Cable B<br />
A&G Cameras<br />
Ready for I&T<br />
PFI/Positioner Integration @ JPL 3/14<br />
CDR<br />
2/23<br />
PDR<br />
1/12<br />
Del Optics,<br />
MGSE<br />
Mech.<br />
Avail<br />
Sys 1 Parts& Electr. Sys 2 Sys 3 Assy<br />
3/29 7/15<br />
5/9<br />
Slit Block &<br />
Test Cables<br />
11/9<br />
6/5 11/6<br />
Detector Sys Del1<br />
Del2<br />
Del3<br />
11/9<br />
6/5<br />
11/6<br />
Camera Camera Camera Camera<br />
CDR<br />
1 2 3 4<br />
6/7<br />
2/14 4/26 7/10 9/19<br />
Detail Cal 4/15 Del SCU<br />
CDR<br />
4/5<br />
Ver2<br />
Recipes<br />
4/4<br />
Rec<br />
Fit<br />
Check<br />
5/6<br />
Align<br />
Test<br />
& Int<br />
PSR<br />
7/1<br />
12/12<br />
PSR/SIR<br />
7/2 Install Fiducial Illuminator Sys<br />
7/17 Install Thermal Control Sys<br />
6/25 Install Power Distribution Sys<br />
7/19 Del PFI Assembly<br />
Spectrograph<br />
Ship by Boat<br />
Ver3 Ship HW<br />
Recipes to JPL<br />
7/29<br />
11/5<br />
PDR<br />
System Software 3/31<br />
CDR<br />
6/8<br />
Del Sys SW<br />
3/13<br />
Instrument Integration@ JPL<br />
Rec Prelim<br />
Sys Software<br />
PDR CDR<br />
Cable A 5/31 7/27<br />
12/29<br />
10/4<br />
Cameras<br />
Integration @ Subaru<br />
Spectograph<br />
Arrive<br />
Ver.<br />
Control<br />
Setup Loop<br />
9/5<br />
Gemini<br />
Accept<br />
Test Ship<br />
2/19<br />
Del<br />
WFMOS<br />
Instrument<br />
7/11<br />
Operations<br />
Milestone Slack JPL Milestones Delivery Milestones subsystem CDR subsystem PDR Critical Path LL Long Lead<br />
Figure 7.3-1: Top Level Schedule<br />