<strong>SUMMARY</strong> REPORT<br />
WIDE FIELD FIBER-FED OPTICAL<br />
MULTI-OBJECT SPECTROMETER (WFMOS)<br />
Item<br />
Use COTS<br />
CCDs instead of<br />
custom CCDs<br />
Reduce number<br />
of positioners<br />
from 2,400 to<br />
1800<br />
Reduce number<br />
of spectrographs<br />
from 3 to 2<br />
Reduce the<br />
number of<br />
metrology<br />
cameras in JPL<br />
I&T<br />
Decision<br />
Date<br />
Project start,<br />
parts order,<br />
integration<br />
Positioner<br />
CDR, parts<br />
order, start of<br />
positioner<br />
integration<br />
Spectrograph<br />
CDR<br />
Metrology<br />
CDR, JPL I&T<br />
Table 7.2-4: Descope Options<br />
Likelihood of<br />
Performance<br />
Impact<br />
Performance<br />
Impact<br />
30%<br />
reduction in<br />
wavelength<br />
coverage or<br />
resolution,<br />
depending on<br />
survey<br />
Decreased<br />
observing<br />
efficiency<br />
Decreased<br />
observing<br />
efficiency<br />
Decrease in<br />
throughput<br />
Other<br />
Subsystems<br />
Affected<br />
Cost<br />
Reduction<br />
High Spectrograph $260K<br />
High<br />
High<br />
Low<br />
Spectrograph,<br />
fibers,<br />
detectors<br />
Positioners,<br />
fibers,<br />
detectors<br />
Software,<br />
thermal system<br />
Comment<br />
$1.2M Coupled w/<br />
reducing<br />
spectographs to<br />
2. Costs only<br />
reflect reduction<br />
number of<br />
positioners.<br />
Additional savings<br />
in integration and<br />
test<br />
$2.5M Coupled w/<br />
reducing number<br />
of postioners to<br />
1800.<br />
$490K After early testing,<br />
it may be possible<br />
to go to one 4K x<br />
4K camera.<br />
Additional error in<br />
measuring<br />
postioner<br />
locations results<br />
in loss of<br />
throughput<br />
7.3 Schedule<br />
The baseline schedule is 58 months as shown in Figure 7.3-1. The baseline costs are developed<br />
against the 58-month schedule; project reserves are sufficient to cover development and<br />
build risk as well continuing workforce if schedule reserves, estimated at 5 months, are used. If<br />
the schedule reserves are used fully, the total project timeline is 63 months for a final delivery<br />
date of December 13, 2014. This schedule shows the critical path is through the fiber system.<br />
However there are two major paths leading to instrument integration; this schedule shows these<br />
two major tested subsystems delivering to the telescope within two months of each other.<br />
Some of the major milestones are:<br />
• Kickoff Meeting.<br />
• Project System Requirements Review (SRR).<br />
• Project and subsystem Preliminary Design Reviews (PDR).<br />
• Project and subsystem Critical Design Reviews (CDR).<br />
• Integration and Test Readiness Review.<br />
• Delivery of test slit blocks with fibers to the spectrograph.<br />