<strong>SUMMARY</strong> REPORT<br />

WIDE FIELD FIBER-FED OPTICAL<br />

MULTI-OBJECT SPECTROMETER (WFMOS)<br />

Item<br />

Use COTS<br />

CCDs instead of<br />

custom CCDs<br />

Reduce number<br />

of positioners<br />

from 2,400 to<br />

1800<br />

Reduce number<br />

of spectrographs<br />

from 3 to 2<br />

Reduce the<br />

number of<br />

metrology<br />

cameras in JPL<br />

I&T<br />

Decision<br />

Date<br />

Project start,<br />

parts order,<br />

integration<br />

Positioner<br />

CDR, parts<br />

order, start of<br />

positioner<br />

integration<br />

Spectrograph<br />

CDR<br />

Metrology<br />

CDR, JPL I&T<br />

Table 7.2-4: Descope Options<br />

Likelihood of<br />

Performance<br />

Impact<br />

Performance<br />

Impact<br />

30%<br />

reduction in<br />

wavelength<br />

coverage or<br />

resolution,<br />

depending on<br />

survey<br />

Decreased<br />

observing<br />

efficiency<br />

Decreased<br />

observing<br />

efficiency<br />

Decrease in<br />

throughput<br />

Other<br />

Subsystems<br />

Affected<br />

Cost<br />

Reduction<br />

High Spectrograph $260K<br />

High<br />

High<br />

Low<br />

Spectrograph,<br />

fibers,<br />

detectors<br />

Positioners,<br />

fibers,<br />

detectors<br />

Software,<br />

thermal system<br />

Comment<br />

$1.2M Coupled w/<br />

reducing<br />

spectographs to<br />

2. Costs only<br />

reflect reduction<br />

number of<br />

positioners.<br />

Additional savings<br />

in integration and<br />

test<br />

$2.5M Coupled w/<br />

reducing number<br />

of postioners to<br />

1800.<br />

$490K After early testing,<br />

it may be possible<br />

to go to one 4K x<br />

4K camera.<br />

Additional error in<br />

measuring<br />

postioner<br />

locations results<br />

in loss of<br />

throughput<br />

7.3 Schedule<br />

The baseline schedule is 58 months as shown in Figure 7.3-1. The baseline costs are developed<br />

against the 58-month schedule; project reserves are sufficient to cover development and<br />

build risk as well continuing workforce if schedule reserves, estimated at 5 months, are used. If<br />

the schedule reserves are used fully, the total project timeline is 63 months for a final delivery<br />

date of December 13, 2014. This schedule shows the critical path is through the fiber system.<br />

However there are two major paths leading to instrument integration; this schedule shows these<br />

two major tested subsystems delivering to the telescope within two months of each other.<br />

Some of the major milestones are:<br />

• Kickoff Meeting.<br />

• Project System Requirements Review (SRR).<br />

• Project and subsystem Preliminary Design Reviews (PDR).<br />

• Project and subsystem Critical Design Reviews (CDR).<br />

• Integration and Test Readiness Review.<br />

• Delivery of test slit blocks with fibers to the spectrograph.<br />