Planning Committee <strong>Agenda</strong> Item 8<br />

13 April 2011 11/00126/F<br />

6.41 As the planning condition provides the option not to provide a CHP plant,<br />

<strong>and</strong> the development will still provide renewable energy that is in line with<br />

the South East Plan, this will need to be the subject of further detailed<br />

consideration.<br />

Contaminated L<strong>and</strong><br />

6.42 A desk study, site investigation report <strong>and</strong> remedial action plan for phase<br />

two of the Horley North East Sector were produced in November 2006. The<br />

site investigation report identified the presence of ground gases <strong>and</strong> material<br />

impacted by contamination in the Tanyard Farm area of the site. Details<br />

presented in the remediation action plan to address the contamination<br />

that was identified were vague <strong>and</strong> did not take into account the proposed<br />

layout of the site.<br />

6.43 In order to maintain control of works to address the contamination identified<br />

in the area of Tanyard Barn, it is necessary that future investigation <strong>and</strong>/or<br />

remediation works are agreed with the Local Planning Authority prior to<br />

such works being undertaken <strong>and</strong> development commencing in this area. A<br />

validation/closure report to record the works undertaken to ensure that the<br />

site was suitable for its proposed use will also be required prior to the<br />

development being occupied.<br />

CONDITIONS<br />

Pre-Commencement Conditions<br />

1. No development shall take place until a Construction Method Statement has<br />

been submitted to <strong>and</strong> approved in writing by the Local Planning Authority.<br />

Development shall be carried out only in accordance with the approved<br />

Construction Method Statement, which shall include details of:<br />

Highway Matters<br />

(a) Parking for vehicles of site personnel, operatives <strong>and</strong> visitors;<br />

(b) A programme of works (including measures for traffic management);<br />

(c) The provision of boundary hoarding in accordance with the details<br />

contained within the Construction Method Statement, Phase 1<br />

document prepared by Terry Ship on behalf of Barratt Wates <strong>and</strong> dated<br />

20 May 2008, Version 1;<br />

Flora <strong>and</strong> Fauna<br />

(d) Protection of existing fauna identified for retention, as detailed within<br />

the Environmental Statement;<br />

Environmental Health<br />

(e)<br />

Measures to prevent ground water contamination pollution; <strong>and</strong><br />

M:\BDS\DM\Ctreports 2010-11\Meeting 13- 13 April 2011\Agreed Reports\04.01778.RM13 - Horley NE Sector Phase 2.docx