regulatory and compliance issues and considerations
regulatory and compliance issues and considerations
regulatory and compliance issues and considerations
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Agreement/Advance Voucher;<br />
<strong>and</strong> either this item or the<br />
“advance proceeds check” has<br />
to be signed. Thus, signatures<br />
are generally required for<br />
collateral loans (which most<br />
CE loans are). Note: The<br />
MFOE Plans rely on advance<br />
proceeds checks being<br />
properly drawn <strong>and</strong> endorsed<br />
to provide a proper security<br />
interest under UCC Article 9.<br />
Query – pull a sampling of<br />
your current OE loans <strong>and</strong> see<br />
if: (1) The checks are always<br />
made payable to all owners of<br />
the collateral to be pledged;<br />
<strong>and</strong> (2) all of those persons<br />
actually endorse the advance<br />
proceeds check.<br />
laws have caught up with<br />
technology. Remote lending is<br />
very much possible; most<br />
likely simpler; <strong>and</strong> less likely to<br />
create the paper mistakes of<br />
current OE systems.<br />
Remote Lending See Above See above. Also with a CE<br />
Loan Application that provides<br />
the Application will serve for all<br />
loan requests, the CE system<br />
<strong>and</strong> technology can in fact<br />
facilitate remote lending.<br />
Internet banks use it<br />
exclusively – not OE loan<br />
forms.<br />
In Branch Closings See Above See Above<br />
Modifications<br />
“Skip-a-pay” Programs<br />
As an OE Plan (an ongoing<br />
relationship) many changes<br />
require disclosures under<br />
TILA/Z; of may need to be<br />
addressed via the Credit<br />
Union’s Periodic Statement<br />
with revised or additional<br />
disclosures.<br />
Require additional disclosures;<br />
or in most cases – are not<br />
allowed where fees are<br />
charged (as these fees affect<br />
the APR).<br />
As a CE loan, modifications<br />
generally require no<br />
disclosures. Though some<br />
simple confirmation is<br />
generally recommended.<br />
Readily Available as TILA/Z<br />
have no requirements; <strong>and</strong><br />
fees are not considered in the<br />
APR.<br />
Moving forward together to meet members' needs <strong>and</strong> to exceed expectations,<br />
Todd<br />
Copyright©1994-2010 by Credit Union Resources & Educational Services, LLC. All rights reserved.<br />
Revised February 2010<br />
44