<strong>Project</strong> <strong>Hurunui</strong> <strong>Wind</strong> <strong>Construction</strong> Effects <strong>and</strong> Management Report<br />

rehabilitation throughout the<br />

construction phase.<br />

Environmental Management<br />

Plans to control erosion <strong>and</strong><br />

treat sediment run-off.<br />

pavement may be provided. This will<br />

provide a clean running/working surface<br />

as well as minimise erosion.<br />

Turbine platforms will be rehabilitated upto<br />

the edge of basecourse hardst<strong>and</strong> areas<br />

with appropriate ground cover after<br />

construction.<br />

Sediment Run-off<br />

Discharges to the<br />

Cave <strong>and</strong> Motunau<br />

Catchment Areas<br />

Avoid where possible by<br />

redirecting works <strong>and</strong>/or<br />

discharges from sediment<br />

control structures to northern<br />

(including Tipapa) catchments<br />

assessed as having lower<br />

comparable ecological values.<br />

Ensure specific erosion <strong>and</strong><br />

sediment controls at fill site just<br />

north of Turbine D5, in particular<br />

Some potential fill areas <strong>and</strong> lay down<br />

areas will involve the removal of existing<br />

topsoil <strong>and</strong> vegetation. The measures<br />

outlined in this report will ensure that these<br />

fill sites <strong>and</strong> lay down areas are blended<br />

back into the existing environment<br />

following their rehabilitation.<br />

In the likely event that an on-site batching<br />

plant is deployed, an SEMP will be<br />

developed to outline measures to manage<br />

any dust, sediment, cement <strong>and</strong> wash<br />

water discharges. Such measures are<br />

likely to include cement storage within a<br />

silo, aggregate storage bins, a temporary<br />

concrete slab beneath the loading area<br />

<strong>and</strong> containment bunding around the<br />

plant.<br />

Appropriate substation design such as<br />

bunding <strong>and</strong> interceptor tanks will ensure,<br />

in the unlikely event of transformer oil<br />

spillage, that the risk of oil discharge is<br />

low.<br />

Sewerage <strong>and</strong> waste water from the<br />

services building will be directed to a<br />

septic tank. Flows are expected to be low.<br />

In areas where the construction works<br />

border catchments, road alignments <strong>and</strong><br />

fill sites can be adjusted to remain within<br />

catchments with lower comparable<br />

ecological values.<br />

The draft SEMP details specific measures<br />

at this area.<br />

5C-1604.02<br />

February 2011 56