10.04.2015 Views

ASPIRE Spring 09 - Aspire - The Concrete Bridge Magazine

ASPIRE Spring 09 - Aspire - The Concrete Bridge Magazine

ASPIRE Spring 09 - Aspire - The Concrete Bridge Magazine

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FULTON ROAD BRIDGE REPLACEMENT / Cleveland, Ohio<br />

Reinforcement in the<br />

footing on 6-ft-diameter<br />

drilled shafts. Photo:<br />

Ohio Department of<br />

Transportation.<br />

In consideration of<br />

the desire to maintain<br />

operations in the zoo<br />

at all times, it was<br />

proposed to use precast<br />

arch rib segments.<br />

Thrust blocks located within the<br />

Cleveland Metroparks zoo. Photo: Ohio<br />

Department of Transportation.<br />

Web | <strong>ASPIRE</strong>, <strong>Spring</strong> 20<strong>09</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!