Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />
PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT200<br />
g) Emissions.<br />
h) The Contractor shall arrange for the complete TBM and back up systems to<br />
be tested for electrical emissions in conformance with “The Amended<br />
Consolidated EMC Directive reference EMC89/336/EEC” and issued with CE<br />
conformance certification.<br />
PT224<br />
PT224.1<br />
PT224.2<br />
PT224.3<br />
PT224.4<br />
GUIDANCE SYSTEMS<br />
This Section provides guidance on the technical and procedural aspects of an<br />
integrated, laser-based guidance system for tunnel shields and TBMs. The<br />
Contractor shall provide a global coordinate TBM Guidance and Control System<br />
with laser theodolite. This shall be a proprietary manufactured system.<br />
Technical Aspects<br />
a) Reference should be made to Works Information for required accuracy and<br />
tolerance and other matters affecting the operation of the system.<br />
b) The tunnelling system shall be designed to maintain a clear space for the<br />
guidance system and laser beam, irrespective of shield or TBM orientation.<br />
c) The data shall be presented on displays at the underground Machine<br />
Operators position and at the offices on surface of the Contractor. Facilities to<br />
download data electronically (for further transmission) and for paper printout,<br />
independently of the current display, shall be provided.<br />
Procedural Aspects<br />
The operation of the guidance system shall be a specific feature of the<br />
Contractor’s Quality Assurance Plan. This should clearly address:<br />
a) Definition of responsibility and authority of personnel maintaining and<br />
operating the guidance system.<br />
b) Intervals between manual checking of data produced by the guidance system<br />
(lengthened intervals may be adopted as experience is gained)<br />
c) Intervals, at which survey control points are to be established, based upon<br />
tunnel geometry and guidance system characteristics.<br />
d) The guidance system shall be fully operational whenever the TBM is<br />
advancing.<br />
The guidance system shall assist in this by:<br />
i) Computing the alignment of this plane for the last lining built.<br />
ii) Computing the corrections required to achieve this plane in the next lining<br />
to be built.<br />
iii) For tapered lining rings, the guidance system shall compute the best<br />
fitting type and orientation of taper lining ring to be built next. The<br />
guidance system shall be configured to accept data from a minimum of<br />
four taper ring designs.<br />
Technical Aspects<br />
Thames Water Utilities Limited August 2008<br />
Page 18 of 38