Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />

PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT200<br />

g) Emissions.<br />

h) The Contractor shall arrange for the complete TBM and back up systems to<br />

be tested for electrical emissions in conformance with “The Amended<br />

Consolidated EMC Directive reference EMC89/336/EEC” and issued with CE<br />

conformance certification.<br />

PT224<br />

PT224.1<br />

PT224.2<br />

PT224.3<br />

PT224.4<br />

GUIDANCE SYSTEMS<br />

This Section provides guidance on the technical and procedural aspects of an<br />

integrated, laser-based guidance system for tunnel shields and TBMs. The<br />

Contractor shall provide a global coordinate TBM Guidance and Control System<br />

with laser theodolite. This shall be a proprietary manufactured system.<br />

Technical Aspects<br />

a) Reference should be made to Works Information for required accuracy and<br />

tolerance and other matters affecting the operation of the system.<br />

b) The tunnelling system shall be designed to maintain a clear space for the<br />

guidance system and laser beam, irrespective of shield or TBM orientation.<br />

c) The data shall be presented on displays at the underground Machine<br />

Operators position and at the offices on surface of the Contractor. Facilities to<br />

download data electronically (for further transmission) and for paper printout,<br />

independently of the current display, shall be provided.<br />

Procedural Aspects<br />

The operation of the guidance system shall be a specific feature of the<br />

Contractor’s Quality Assurance Plan. This should clearly address:<br />

a) Definition of responsibility and authority of personnel maintaining and<br />

operating the guidance system.<br />

b) Intervals between manual checking of data produced by the guidance system<br />

(lengthened intervals may be adopted as experience is gained)<br />

c) Intervals, at which survey control points are to be established, based upon<br />

tunnel geometry and guidance system characteristics.<br />

d) The guidance system shall be fully operational whenever the TBM is<br />

advancing.<br />

The guidance system shall assist in this by:<br />

i) Computing the alignment of this plane for the last lining built.<br />

ii) Computing the corrections required to achieve this plane in the next lining<br />

to be built.<br />

iii) For tapered lining rings, the guidance system shall compute the best<br />

fitting type and orientation of taper lining ring to be built next. The<br />

guidance system shall be configured to accept data from a minimum of<br />

four taper ring designs.<br />

Technical Aspects<br />

Thames Water Utilities Limited August 2008<br />

Page 18 of 38