Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />
PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT200<br />
PT200<br />
PT201<br />
PT201.1<br />
PT201.2<br />
PT201.3<br />
PT202<br />
PT202.1<br />
PT202.2<br />
PT202.3<br />
PT202.4<br />
PT202.5<br />
PT202.6<br />
PT203<br />
PT203.1<br />
PT203.2<br />
SPECIFICATION FOR NEW TUNNEL BORING MACHINE AND TUNNEL<br />
CONSTRUCTION – 7200mm MINIMUM NOMINAL INTERNAL DIAMETER FOR<br />
TUNNEL BETWEEN BECKTON STW AND ABBEY MILLS PS<br />
SUMMARY<br />
The work in this Section includes, but is not limited to, providing all labour,<br />
materials, tools, equipment, and incidentals necessary to construct a 7200mm<br />
minimum nominal ID finished tunnel (including a primary and secondary lining) in<br />
accordance with the Works Information and Site Information.<br />
The work in this Section includes, but is not limited to, the following activities:<br />
• The provision of a new Tunnel Boring Machine includes, but is not limited to:<br />
design, manufacture, supply, maintain and testing of a tunnel boring machine<br />
for the express purpose of constructing TBM excavated tunnels between<br />
Beckton and Abbey Mills.<br />
• Boring Tunnel includes, but is not limited to: mining of tunnels, installation of<br />
pre-cast concrete segmental tunnel lining, temporary tunnel facilities,<br />
geotechnical monitoring, control of ground loss, settlement and heave, and<br />
removal and disposal of excavated material.<br />
• As-Built Tunnel Survey<br />
This is a performance specification. The Contractor shall be responsible for the<br />
selection and complete design of the new tunnel boring machine and tunnel<br />
construction systems. The Works Information, Site Information and GBR provides<br />
parameters and design criteria for this element of the works.<br />
REFERENCE STANDARDS<br />
UK Health and Safety Regulations including but not limited to the Construction,<br />
Health, Safety and Welfare Regulation 1996, The Confined Spaces Regulations<br />
1997 and the Approved Code of Practice H.S.E. Document L101.<br />
Joint Code of Practice for Risk Management of Tunnel Works in the UK published<br />
by the British <strong>Tunnelling</strong> Society/Association of British Insurers and the<br />
International <strong>Tunnelling</strong> Association/AITES Guidelines to <strong>Tunnelling</strong> Risk<br />
Management: ITA Working Group.<br />
BS6164: 2001 Code of Practice for Safety in <strong>Tunnelling</strong> in the Construction<br />
Industry.<br />
EFNARC (European Federation for Specialist Construction Chemicals and<br />
Concrete Systems) <strong>Specification</strong> and Guidelines for the use of Specialist<br />
Products for Soft Ground <strong>Tunnelling</strong>. This publication is located at the following<br />
internet address: http://www.efnarc.org/pdf/SGTSpec.pdf)<br />
BSEN 12336:2005 -Tunnel Machine Safety Requirements.<br />
The Groundwater Regulations 1998: “Protection of Groundwater Against Pollution<br />
Caused by Certain Substances” List One and List Two.<br />
DEFINITIONS<br />
TBM excavation: The construction of underground tunnels by mechanical means<br />
using a tunnel boring machine<br />
Segmental tunnel lining: Pre-cast concrete segments that are bolted together<br />
inside the TBM tail shield to form a gasketed, watertight tunnel lining ring. The<br />
lining shall be designed to withstand both handling loads and all ground and<br />
external hydrostatic and internal storm water loads.<br />
Thames Water Utilities Limited August 2008<br />
Page 2 of 38