Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />
PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT200<br />
PT239.5<br />
PT239.6<br />
PT239.7<br />
PT240<br />
PT240.1<br />
a) Primary grout shall be injected by positive displacement. Consideration shall<br />
be given to providing a ring main system with the incorporation of approved<br />
retarders and accelerators to control the setting of the grout. The grout pump<br />
system shall incorporate a safety pressure by-pass arrangement, with means<br />
of reading the grout pressure at the point of injection.<br />
b) Primary Grouting shall commence in a manner such the cavity is completely<br />
filled with grout and all excess air and water is displaced and the grout is<br />
retained under pressure until the first set takes place.<br />
Records<br />
Records at each stage of the grouting process shall be kept, to include quantity<br />
and pressure applied at each injection point. These records shall be submitted to<br />
the Project Manager daily.<br />
Grout Performance<br />
The minimum compressive strength requirement of all grouts as measured from<br />
testing cubes shall be:-1.5N/mm² at 24 hours and have an initial set within 10<br />
seconds with Marsh Flows between 45 and 60 seconds at a base temperature of<br />
20°C.<br />
Testing<br />
Three sample cubes of the grout shall be taken daily to an approved testing<br />
facility to verify the minimum strength requirement. The results of these tests shall<br />
be forwarded to the Project Manager.<br />
Tests shown in Table below to be carried out on the grout.<br />
item <strong>Specification</strong> Test method<br />
Frequency<br />
On<br />
ground<br />
Bleeding Less<br />
3%(1hour)<br />
Bleeding test Every<br />
day<br />
Consistency 8 to 11 sec Flow test Every<br />
day<br />
Gel time 5 to 12 sec Mix test Every<br />
day<br />
1 hour Compressive Every<br />
test with 4cm month<br />
24 hour 1.5 N/mm 2 cube sample Every<br />
day<br />
7 day Every<br />
month<br />
28 day<br />
Every<br />
month<br />
In<br />
each<br />
tunnel<br />
Every<br />
week<br />
Every<br />
week<br />
Every<br />
week<br />
Every<br />
month<br />
Every<br />
week<br />
Every<br />
month<br />
Every<br />
month<br />
INSTALLATION, MONITORING AND CONTROL FOR SEGMENTAL LINING<br />
Installation of Tunnel Lining<br />
Remark<br />
Solution<br />
-A<br />
Solution<br />
-A<br />
A+B<br />
Referen<br />
ce only<br />
Referen<br />
ce only<br />
Referen<br />
ce only<br />
a) Construct rings to correct line and level, in true circular form to preserve the<br />
circularity of the tunnel.<br />
b) Select combinations of tapered segment rings to provide specific tunnel<br />
geometry, and for making corrections as necessary during construction.<br />
c) Inspect concrete segments and gaskets before transport into the tunnel nd<br />
the building of the segments in the tailskin. No damaged segments are to be<br />
taken in to the tunnel and prior to build.<br />
Thames Water Utilities Limited August 2008<br />
Page 30 of 38