Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />

PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT300<br />

d) The guidance system must be fully operational whenever the TBM is<br />

advancing.<br />

PT316<br />

PT317<br />

PT318<br />

PT318.1<br />

PT318.2<br />

PT318.3<br />

PT318.4<br />

PT318.5<br />

PT318.6<br />

PT318.7<br />

PT318.8<br />

PT319<br />

APPLICABLE CODES AND REGULATIONS<br />

The TBM and its components shall meet all applicable codes and regulations,<br />

and all requirements posed by the electric power suppliers and any other agency<br />

that has jurisdiction.<br />

TAIL SEAL GREASE INJECTION<br />

Tail Seal grease injections shall be automatic and continuous to ensure effective<br />

filling between the brushes. Injection of grease shall be in accordance with the<br />

TBM manufacturer’s written requirements, and shall be a positive distribution<br />

system to ensure even distribution of grease, details of which shall be made<br />

available to the Engineer. Tail Seal grease shall be fireproof.<br />

OTHER FEATURES<br />

Provide the TBM with probe hole and grouting drilling capability such that the<br />

probe and grout holes can be maintained a minimum of 20 metres ahead of the<br />

TBM cutterhead. The probing ports shall be fitted with suitable glands and valves<br />

to withstand the pressures envisioned.<br />

Provide method to test for the presence of hazardous or explosive gas in<br />

accordance with Health and Safety regulations requirements. <strong>Particular</strong> attention<br />

should be taken for the potential for migration of contaminated material from the<br />

Abbey Mills Site details of are given in Schedule 6 of the Works Information and<br />

the Factual Site Investigation Reports issued as part of the Contract<br />

All electrical power, control and safety systems shall have a minimum moisture<br />

ingress protection rating of NEMA 12. All cables in the tunnel shall be LSF (Low<br />

Smoke and Fume) or LSOH (Low Smoke Zero Halogen) sheathed. If the TBM<br />

has a high voltage transformer this shall have an over temperature alarm and<br />

shall include all safety devices as required by the regulatory authorities.<br />

Provide an environmental monitoring system that detects levels of potentially<br />

hazardous gases. Systems shall be arranged with adjustable limits and shall<br />

have a first level warning signal and a second level with automatic shut off of<br />

tunnelling equipment in accordance with Health and Safety Regulations<br />

requirements. Gases to be monitored shall include methane, oxygen, hydrogen<br />

sulphide, carbon dioxide and carbon monoxide and other gases, mists and<br />

fumes.<br />

The Contractor shall supply Calibration Test Certificates for gas detection<br />

system, pressure cells in excavation chamber and screw conveyor, TBM<br />

guidance system and grout pressure gauges. Certificates to be updated in<br />

accordance with the manufacturers recommendations.<br />

In order to provide a clean environment for placing of the invert segment plate,<br />

the Contractor shall take appropriate measures to keep the shield area free from<br />

water and spoil material. Pumping facilities in the shield area of the TBM shall be<br />

designed to allow sufficient space for the equipment proposed.<br />

The TBM shall be designed to withstand the full overburden pressure and<br />

anticipated hydrostatic pressures.<br />

Only TBM synthetic hydraulic oils HFDU (biodegradable, fire resistant,<br />

polyesters) shall be used. All oils must be approved by the TBM manufacturer.<br />

FIRE PREVENTION – TBM AND BACKUP<br />

The TBM shall be provided with the following minimum systems of fire prevention<br />

but not limited to:<br />

Thames Water Utilities Limited August 2008<br />

Page 8 of 15