Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />
PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT300<br />
d) The guidance system must be fully operational whenever the TBM is<br />
advancing.<br />
PT316<br />
PT317<br />
PT318<br />
PT318.1<br />
PT318.2<br />
PT318.3<br />
PT318.4<br />
PT318.5<br />
PT318.6<br />
PT318.7<br />
PT318.8<br />
PT319<br />
APPLICABLE CODES AND REGULATIONS<br />
The TBM and its components shall meet all applicable codes and regulations,<br />
and all requirements posed by the electric power suppliers and any other agency<br />
that has jurisdiction.<br />
TAIL SEAL GREASE INJECTION<br />
Tail Seal grease injections shall be automatic and continuous to ensure effective<br />
filling between the brushes. Injection of grease shall be in accordance with the<br />
TBM manufacturer’s written requirements, and shall be a positive distribution<br />
system to ensure even distribution of grease, details of which shall be made<br />
available to the Engineer. Tail Seal grease shall be fireproof.<br />
OTHER FEATURES<br />
Provide the TBM with probe hole and grouting drilling capability such that the<br />
probe and grout holes can be maintained a minimum of 20 metres ahead of the<br />
TBM cutterhead. The probing ports shall be fitted with suitable glands and valves<br />
to withstand the pressures envisioned.<br />
Provide method to test for the presence of hazardous or explosive gas in<br />
accordance with Health and Safety regulations requirements. <strong>Particular</strong> attention<br />
should be taken for the potential for migration of contaminated material from the<br />
Abbey Mills Site details of are given in Schedule 6 of the Works Information and<br />
the Factual Site Investigation Reports issued as part of the Contract<br />
All electrical power, control and safety systems shall have a minimum moisture<br />
ingress protection rating of NEMA 12. All cables in the tunnel shall be LSF (Low<br />
Smoke and Fume) or LSOH (Low Smoke Zero Halogen) sheathed. If the TBM<br />
has a high voltage transformer this shall have an over temperature alarm and<br />
shall include all safety devices as required by the regulatory authorities.<br />
Provide an environmental monitoring system that detects levels of potentially<br />
hazardous gases. Systems shall be arranged with adjustable limits and shall<br />
have a first level warning signal and a second level with automatic shut off of<br />
tunnelling equipment in accordance with Health and Safety Regulations<br />
requirements. Gases to be monitored shall include methane, oxygen, hydrogen<br />
sulphide, carbon dioxide and carbon monoxide and other gases, mists and<br />
fumes.<br />
The Contractor shall supply Calibration Test Certificates for gas detection<br />
system, pressure cells in excavation chamber and screw conveyor, TBM<br />
guidance system and grout pressure gauges. Certificates to be updated in<br />
accordance with the manufacturers recommendations.<br />
In order to provide a clean environment for placing of the invert segment plate,<br />
the Contractor shall take appropriate measures to keep the shield area free from<br />
water and spoil material. Pumping facilities in the shield area of the TBM shall be<br />
designed to allow sufficient space for the equipment proposed.<br />
The TBM shall be designed to withstand the full overburden pressure and<br />
anticipated hydrostatic pressures.<br />
Only TBM synthetic hydraulic oils HFDU (biodegradable, fire resistant,<br />
polyesters) shall be used. All oils must be approved by the TBM manufacturer.<br />
FIRE PREVENTION – TBM AND BACKUP<br />
The TBM shall be provided with the following minimum systems of fire prevention<br />
but not limited to:<br />
Thames Water Utilities Limited August 2008<br />