Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />
PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT300<br />
PT322.3<br />
PT322.4<br />
PT322.5<br />
PT322.6<br />
PT322.7<br />
PT322.8<br />
a) The Contractor shall design, provide, operate and maintain for duration of<br />
tunnelling construction a temporary ventilation system, which conforms to<br />
the Health and Safety requirements. The equipment shall be adequate to<br />
maintain sufficient supply of fresh air in underground work areas.<br />
b) The design of the ventilation system shall take into account any mitigation<br />
measures the Contractor may deem necessary having regard to the<br />
potential for the migration of any gases and contaminated material into the<br />
tunnel or shafts from the contaminated materials as detailed in the Reports<br />
and Site Information at Abbey Mills to be found in Schedule 6 of the Works<br />
Information<br />
i) Mechanical ventilation systems shall not be removed without the<br />
approval of the Project Manager.<br />
ii) As a minimum, in good air quality, when the excavations are occupied<br />
by workers, the ventilation system shall be designed to deliver fresh air<br />
at a volumetric flow rate equal to 20mtrs per minute times the crosssectional<br />
area of the tunnel. A higher volumetric flow rate shall be<br />
provided if necessary<br />
iii) Power to the main ventilation system shall not be interrupted in the<br />
event of an alarm of the air monitoring system.<br />
iv) Advance of the ventilation system shall be made a regular part of the<br />
normal tunnel excavation cycle.<br />
Temporary Tunnel Lighting System<br />
The Contractor shall provide a temporary lighting system in the tunnel which<br />
conforms to the requirements of BS6164:2001“Code of practice for safety in<br />
tunnelling in the construction industry”. Lighting in the tunnel shall extend the full<br />
length of the tunnel and not be less than that required for safe working and<br />
access. An alternative source of power and emergency lighting system shall be<br />
provided to allow emergency securing operations and safe evacuation in the<br />
event of a primary power failure. An adequate number of hand lamps shall be<br />
located at key points underground.<br />
Temporary Personnel Walkway<br />
The Contractor shall provide walking access in the tunnel at all times. This shall<br />
have a firm, level, slip-resistant and continuous surface and shall be suitable for<br />
use in emergencies.<br />
Hop ups for pedestrian safety shall be provided in the tunnel at a minimum of<br />
100mtr centres.<br />
Temporary Locomotive Track<br />
The track should be properly supported and secured against displacement in the<br />
tunnel. The entire length of the track shall be examined not less than once a<br />
week and the results of this inspection shall be forwarded to the Engineer.<br />
Defects shall be recorded and remedial action will be promptly implemented<br />
when identified.<br />
Temporary Pumping<br />
Provide intermediate pumping stations and reserve pumping capacity at the any<br />
point of the tunnel as required to remove groundwater inflows and construction<br />
water.<br />
Fire Extinguishers<br />
Fire extinguishers shall be provided at a minimum every 500 metres of the<br />
running tunnels. They shall be maintained in accordance with the manufacturer’s<br />
recommendations.<br />