Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />

PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT300<br />

PT322.3<br />

PT322.4<br />

PT322.5<br />

PT322.6<br />

PT322.7<br />

PT322.8<br />

a) The Contractor shall design, provide, operate and maintain for duration of<br />

tunnelling construction a temporary ventilation system, which conforms to<br />

the Health and Safety requirements. The equipment shall be adequate to<br />

maintain sufficient supply of fresh air in underground work areas.<br />

b) The design of the ventilation system shall take into account any mitigation<br />

measures the Contractor may deem necessary having regard to the<br />

potential for the migration of any gases and contaminated material into the<br />

tunnel or shafts from the contaminated materials as detailed in the Reports<br />

and Site Information at Abbey Mills to be found in Schedule 6 of the Works<br />

Information<br />

i) Mechanical ventilation systems shall not be removed without the<br />

approval of the Project Manager.<br />

ii) As a minimum, in good air quality, when the excavations are occupied<br />

by workers, the ventilation system shall be designed to deliver fresh air<br />

at a volumetric flow rate equal to 20mtrs per minute times the crosssectional<br />

area of the tunnel. A higher volumetric flow rate shall be<br />

provided if necessary<br />

iii) Power to the main ventilation system shall not be interrupted in the<br />

event of an alarm of the air monitoring system.<br />

iv) Advance of the ventilation system shall be made a regular part of the<br />

normal tunnel excavation cycle.<br />

Temporary Tunnel Lighting System<br />

The Contractor shall provide a temporary lighting system in the tunnel which<br />

conforms to the requirements of BS6164:2001“Code of practice for safety in<br />

tunnelling in the construction industry”. Lighting in the tunnel shall extend the full<br />

length of the tunnel and not be less than that required for safe working and<br />

access. An alternative source of power and emergency lighting system shall be<br />

provided to allow emergency securing operations and safe evacuation in the<br />

event of a primary power failure. An adequate number of hand lamps shall be<br />

located at key points underground.<br />

Temporary Personnel Walkway<br />

The Contractor shall provide walking access in the tunnel at all times. This shall<br />

have a firm, level, slip-resistant and continuous surface and shall be suitable for<br />

use in emergencies.<br />

Hop ups for pedestrian safety shall be provided in the tunnel at a minimum of<br />

100mtr centres.<br />

Temporary Locomotive Track<br />

The track should be properly supported and secured against displacement in the<br />

tunnel. The entire length of the track shall be examined not less than once a<br />

week and the results of this inspection shall be forwarded to the Engineer.<br />

Defects shall be recorded and remedial action will be promptly implemented<br />

when identified.<br />

Temporary Pumping<br />

Provide intermediate pumping stations and reserve pumping capacity at the any<br />

point of the tunnel as required to remove groundwater inflows and construction<br />

water.<br />

Fire Extinguishers<br />

Fire extinguishers shall be provided at a minimum every 500 metres of the<br />

running tunnels. They shall be maintained in accordance with the manufacturer’s<br />

recommendations.<br />

Thames Water Utilities Limited August 2008<br />

Page 10 of 15