Lee Tunnel, Contract No. <strong>6LYG</strong>/<strong>A1</strong><br />

PT – <strong>Particular</strong> <strong>Tunnelling</strong> <strong>Specification</strong> - PT200<br />

PT248.12<br />

Design Loadings<br />

a) The internal lining shall be designed to resist the full internal hydrostatic<br />

pressure imposed when the tunnel and shaft systems fill to shaft roof soffit<br />

level.<br />

b) The internal lining shall be designed to resist the full external hydrostatic<br />

pressure imposed from the groundwater level as defined in the GBR.<br />

The loadings defined in a) and b) above shall be applied both simultaneously and<br />

separately.<br />

Thames Water Utilities Limited August 2008<br />