3.1.2 Scope of Design Team input to Outline Proposals Stage (OP Stage)<br />

(a) Contribute to completion of the <strong>Project</strong> Brief and attend further briefing workshops, as<br />

required.<br />

(b) Identify a range of possible new lighting options for each building/monument/<br />

structure; to be developed in conjunction/consultation with DCC/NITB/BHP (allow for<br />

a minimum of 3 options per building/monument/structure).<br />

(c) Meet with DCC/NITB/BHP and present the lighting proposals and rational of design<br />

options. If any option is deemed unacceptable to the client team e.g. due to its<br />

similarity to other proposals, ignoring fundamental design criteria agreed at A&SP<br />

Stage, etc, the design team shall replace it with an acceptable alternative design.<br />

(d) In conjunction with <strong>Derry</strong> <strong>City</strong> <strong>Council</strong>, BHP and relevant service authorities (i.e. NIE,<br />

DRD Roads Service – Street <strong>Lighting</strong> Section, etc) define the infrastructural<br />

requirements for lighting each building/monument/structure.<br />

(e) Establish existing electricity supply capacity at each building/monument/structure,<br />

monitor current usage and establish the need for any enhanced supply to realise<br />

proposed lighting options. Organise and manage procurement of service to<br />

monitor electricity power requirements of each supply phase over a 7 day<br />

period using a data logger system which monitors and records current, voltage,<br />

power factor and maximum demand for each building/electricity supply point as<br />

appropriate. Printed reports to be available for each supply point monitored. Payment<br />

will be made on submission of a receipted paid invoice for service. Hawk Energy<br />

Monitor Model 5000 or equal and approved system should be used for monitoring<br />

purposes.<br />

(f) Review and update project programme.<br />

(g) Advise on the application of all project specific statuary/regulatory approvals and<br />

highlight any design, cost and time implications associated with obtaining all such<br />

approvals.<br />

(h) Prepare images of lighting proposals to inform DCC/NITB/BHP in making a decision<br />

on the preferred design option for each building/site.<br />

(i) Collate all design and cost input from other consultants and assist in the preparation<br />

of the Stage OP costs estimates.<br />

(j) Prepare and submit a Stage OP Report to DCC/NITB/BHP. Report in minimum A3<br />

format and to collate and integrate design development up to the ACE stage OP and<br />

any other requirements set out in this brief. The report should include:<br />

Background to the project (executive summary)<br />

Summarise <strong>Project</strong> Brief<br />

Present preliminary sketch plans/elevations at an appropriate size (A3 size minimum)<br />

and scale to clearly demonstrate the proposed lighting systems at each<br />

building/monument/structure. Drawings to be provided in hard copy and electronically<br />

(in both .pdf and AutoCAD formats)<br />