6.6 Stage 2 - Quality Assessment 70%<br />
To be completed by Lead Consultant only<br />
6.6.1 Methodology 60%<br />
Please provide a detailed methodology for the delivery of the project outlining how<br />
the team proposes to manage and carry the project forward making specific<br />
reference to the following<br />
Available Marks<br />
1) Understanding of the brief 10<br />
2) Establishing key stakeholders and consulting with same 10<br />
3) Identify key challenges of this project including, design, cost,<br />
programme, site specific issues and how you will manage them 10<br />
4) Overall project methodology 30<br />
5) Risk management 10<br />
6) Change management 10<br />
7) Cost management 10<br />
8) H&S management- design phase 10<br />
9) Proposed project programme and programme management 10<br />
10) Procurement strategy 10<br />
11) Contract administration 10<br />
12) Site Supervision 10<br />
13) H&S management- construction phase 10<br />
Total Available Marks = 150<br />
Total % Quality Score= (Total Marks/150)*70<br />
Any additional work which the Team considers necessary for the completion of the<br />
project should be highlighted within the above methodology and included within the<br />
Fee Proposal in Part 7<br />
6.6.2 Programme 10%<br />
Please provide a detailed project programme outlining the various stages in the<br />
process and key milestones for the delivery of the project, including the following<br />
minimum number of stages:<br />
1) Appraisal & Strategic Briefing<br />
2) Prequalification of Contractors<br />
3) Outline Proposals<br />
4) Detailed Proposals<br />
5) Detailed Design<br />
6) Final Design<br />
7) Production Information<br />
8) Tender Documentation<br />
9) Tender Period<br />
10) Tender Assessment<br />
11) <strong>Council</strong> Approvals*<br />
12) Contractor Mobilisation<br />
13) Production and Approval of Contractors Design Development<br />