07.06.2015 Views

Walled City Lighting Project, Derry ~ Londonderry - Derry City Council

Walled City Lighting Project, Derry ~ Londonderry - Derry City Council

Walled City Lighting Project, Derry ~ Londonderry - Derry City Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

____________________________________________________________________<br />

6.6 Stage 2 - Quality Assessment 70%<br />

To be completed by Lead Consultant only<br />

6.6.1 Methodology 60%<br />

Please provide a detailed methodology for the delivery of the project outlining how<br />

the team proposes to manage and carry the project forward making specific<br />

reference to the following<br />

Available Marks<br />

1) Understanding of the brief 10<br />

2) Establishing key stakeholders and consulting with same 10<br />

3) Identify key challenges of this project including, design, cost,<br />

programme, site specific issues and how you will manage them 10<br />

4) Overall project methodology 30<br />

5) Risk management 10<br />

6) Change management 10<br />

7) Cost management 10<br />

8) H&S management- design phase 10<br />

9) Proposed project programme and programme management 10<br />

10) Procurement strategy 10<br />

11) Contract administration 10<br />

12) Site Supervision 10<br />

13) H&S management- construction phase 10<br />

Total Available Marks = 150<br />

Total % Quality Score= (Total Marks/150)*70<br />

Any additional work which the Team considers necessary for the completion of the<br />

project should be highlighted within the above methodology and included within the<br />

Fee Proposal in Part 7<br />

6.6.2 Programme 10%<br />

Please provide a detailed project programme outlining the various stages in the<br />

process and key milestones for the delivery of the project, including the following<br />

minimum number of stages:<br />

1) Appraisal & Strategic Briefing<br />

2) Prequalification of Contractors<br />

3) Outline Proposals<br />

4) Detailed Proposals<br />

5) Detailed Design<br />

6) Final Design<br />

7) Production Information<br />

8) Tender Documentation<br />

9) Tender Period<br />

10) Tender Assessment<br />

11) <strong>Council</strong> Approvals*<br />

12) Contractor Mobilisation<br />

13) Production and Approval of Contractors Design Development<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!