(c) Update master programme as necessary<br />

(d) Update cost plan<br />

3.1.6 Scope of design team input to Tender Documentation and Tender Action<br />

Stage (TD & TA Stage)<br />

(a) Develop quality criteria for tender assessment in conjunction with DCC/NITB.<br />

(b) Set clear and unambiguous instruction in tender documentation regarding proposals<br />

for sub-contracting any element of the works and on the selection of lighting<br />

equipment.<br />

(c) Ensure that tender documentation complies fully with the „Public Contract<br />

Regulations‟ and the criteria/process for assessing equivalence is clearly set out in<br />

document.<br />

(d) Produce and issue a comprehensive set of tender documents, including CDM Regs<br />

information, including full Works Information package as required under NEC<br />

conditions of contract.<br />

(e) Assist with compilation of tender advertisements.<br />

(f) Update master programme as necessary<br />

(g) Present final pre-tender cost plan<br />

(h) Organise and participate in the assessment and checking of tender returns in<br />

conjunction with DCC/NITB/CPD.<br />

(i) Assess and check the design element of the preferred tenderer‟s design,<br />

specification, methodology, etc to ensure that it complies with all aspects of the<br />

tender documentation, client team‟s requirements and instructions and any<br />

obligations set out in the planning permission.<br />

(j) Organise and participate in clarification interviews with tenderers if required.<br />

(k) Prepare detailed tender report and make recommendation for contractor selection.<br />

3.1.7 Scope of design team input to Mobilisation, Construction and<br />

Completion Stage (TD & TA Stage)<br />

(a) Compile two sets of formal contract documents for signing by client team and<br />

successful tenderer.<br />

(b) Examine and approve any shop/working drawings or other construction information<br />

produced by the Contractor or sub-contractors.<br />

17