07.06.2015 Views

Walled City Lighting Project, Derry ~ Londonderry - Derry City Council

Walled City Lighting Project, Derry ~ Londonderry - Derry City Council

Walled City Lighting Project, Derry ~ Londonderry - Derry City Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

____________________________________________________________________<br />

Employment History:<br />

Experience in:<br />

Marks<br />

1. The <strong>Project</strong> Management of the design and implementation of lighting<br />

schemes to illuminate the exterior of historic and listed buildings/monuments/<br />

structures of similar scale and variety required for this project.<br />

30<br />

2. The <strong>Project</strong> Management of „Design & Build‟ projects, with particular reference<br />

to lighting schemes to illuminate the exterior of historic and listed<br />

buildings/monuments/structures of similar scale and variety required for this<br />

project.<br />

20<br />

2. Working with NIEA and Planning Service and other regulatory/statutory bodies<br />

in developing and getting approval of schemes for the exterior lighting of<br />

buildings/monuments/structures of similar scale and variety required for this<br />

project.<br />

20<br />

3. Working with Specialist <strong>Lighting</strong> Designers on similar projects. 10<br />

4. The preparation and implementation of <strong>Project</strong> Quality Plans for similar<br />

projects.<br />

10<br />

5. The preparation and implementation of Risk and Performance Management<br />

Strategies.<br />

10<br />

7. Using the NEC 3 suite of contracts including their use in Design & Build<br />

projects<br />

20<br />

8. Acting as Client Advisor on „Design & Build‟ projects, with particular reference<br />

to lighting schemes to illuminate the exterior of historic buildings/monuments<br />

/structures.<br />

20<br />

8. Working with proposed project team members on similar projects, please<br />

provide a matrix to illustrate your response demonstrating which disciplines have<br />

worked together on which projects.<br />

20<br />

9. The Lead Consultant must outline their ability to provide an ongoing interface<br />

with the <strong>Derry</strong> <strong>City</strong> <strong>Council</strong> and Build Heritage Partnership at a local level and<br />

outline the management of the project on a day to day basis, including the<br />

construction phase of the works. How will they respond to short notice requests<br />

for construction information, site inspections, coordinating/approving site lighting<br />

trails/mock ups and attendance at technical meetings. Clarify staff resource<br />

commitment to site during construction phase of works.<br />

20<br />

38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!