ADDENDUM NO. 1 - STV Group, Inc.
ADDENDUM NO. 1 - STV Group, Inc.
ADDENDUM NO. 1 - STV Group, Inc.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PRICE PROPOSAL – ENVELOPE 1<br />
TOTAL<br />
PRICE:__________________________________________________________________<br />
(In Words)<br />
$___________________________________________________________<br />
(In Figures)<br />
D. WORK COST BREAKDOWN<br />
The attached Work Cost Breakdown Form shall be filled out and submitted by the Contractor.<br />
The Total must equal the Total Price, under Section C.3. of this Price Proposal Submission.<br />
FAILURE TO COMPLETE THE WORK COST BREAKDOWN MAY RESULT IN<br />
DISQUALIFICATION OF THE BID.<br />
E. ALLOWANCE FOR FIRE ALARM SYSTEM COMPLIANCE WORK<br />
The Total Price shall include an allowance of $25,000.00 for work performed by the Electrical<br />
Contractor directly related to correction of non9compliance issues for the existing Fire Alarm System in<br />
the Queens College Science Building. All costs associated with the Fire Alarm System Allowance work<br />
to be verified.<br />
67