ATTACHMENT <strong>NO</strong>. 13 DWG. M101.00(091312) 2 ND FLOOR MECHANICAL DEMOLITION <strong>STV</strong> Construction, <strong>Inc</strong>. Addendum No. 1 (092012) CITYWCUCF010904GC/MECH/EL/PL
1 2 3 4 5 DEMOLITION GENERAL <strong>NO</strong>TES <strong>STV</strong> D 1 1. COORDINATE ALL DEMOLITION WORK AND ANY NECESSARY SYSTEM SHUTDOWNS WITH THE GENERAL CONTRACTOR AND OWNER. 2. ALL EQUIPMENT AND DEVICES <strong>NO</strong>T INDCATED TO BE DEMOLISHED ARE EXISTING TO REMAIN. 3. ALL OPENINGS CREATED AS A RESULT OF THE DEMOLITION WORK SHALL BE FILLED&IN TO MATCH EXISTING CONSTRUCTION BY MECHANICAL CONTRACTOR. 4. ALL WORK ON THIS DRAWING BY MECHANICAL CONTRACTOR, UNLESS OTHERWISE <strong>NO</strong>TED. 5. DEMOLISH ALL PNEUMATIC TUBING, MECHANICAL CONTROL PANELS AND ASSOCIATED CONTROL DEVICES WITHIN B237, B241, B243, B245, B211, B203, D231, D231A. <strong>STV</strong> INC. 225 PARK AVE. SOUTH NEW YORK, NY 10003 www.stvinc.com CONSULTANTS ENVIRONMENTAL MATRIX NEW WORLD 120 EAGLE ROCK AVENUE SUITE 207 EAST HA<strong>NO</strong>VER, NJ. 07936 t 973&240&1800 C 7 6 300 CFM CORRIDOR C001 20x5 LAB B237 LAB B241 13ø 14ø 13ø 14ø 250 CFM (TYP FOR 6) 250 CFM (TYP FOR 6) 5 24X14 UP, 24X12 DN (ETR) 18X16 UP (ETR) 1"ø LPC 1 1/4"ø LPS 12ø 2&1/2" LPS UP, 3" LPS DN (ETR) 3 1&1/2" LPC UP, DN (ETR) 1"ø LPC 1 1/4"ø LPS 3 18X18 UP (ETR) 4 18ø 18x24 16ø 16ø 12ø 1400 CFM 40x18 40x18 1500 CFM 3 3 18x24 3 16x10 120 CFM PHYSICS B215 3 PREP RM. 7ø 125 CFM B211 575 CFM 14ø 10ø OFFICE B209 10ø 16x10 2 CORRIDOR C003 14Ø RETURN AIR DUCT (ETR) 10Ø TRANSFER DUCT (ETR) 1 2 18X18 TRANSFER DUCT 3 24X36 UP, 24X20 DN (ETR) H' H SUPPLY AIR VAV AND DUCTWORK (ETR) 2 18X18 TRANSFER DUCT 1 4 20X22 UP, 20X18 DN (ETR) 13Ø RETURN DUCT (ETR) 13Ø TRANSFER DUCT (ETR) I J' J K D233 5 4 BIOLOGY LAB D231 300 CFM 30x6 3 CORRIDOR C002 350 CFM (TYP FOR 4) P Q 1 2 3 4 DEMOLITION KEY <strong>NO</strong>TES AIRFLOWS SHOWN IN SPACES (OUTSIDE OF THE PROJECT AREA) ARE EXISTING QUANTITIES OBTAINED FROM AS&BUILT DOCUMENTS. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL TAKE AIRFLOW MEASUREMENTS AT EACH INDICATED LOCATION AND PREPARE A REPORT FOR THE ENGINEER'S REVIEW BEFORE AND AFTER CONSTRUCTION. DEMOLISH TRANSFER DUCT AND ASSOCIATED GRILLES. FILL AND PATCH WALL TO MATCH EXISTING. PROVIDE TEMPORARY CAP FOR DUCTWORK AND/OR PIPING AT DISCONNECTION POINT TO PREVENT LEAKAGE FROM SYSTEM AND TO PROTECT DUCTWORK AND PIPING THAT IS EXISTING TO REMAIN CUT AND CAP EXISTING TRANSFER DUCT ON CORRIDOR SIDE OF LAB PREP ROOM WALL. FILL AND PATCH WALL TO MATCH EXISTING. COST ESTIMATING DACK CONSULTING SOLUTIONS 2 WILLIAM STREET SUITE 202 WHITE PLAINS, NY. 10601 t 914&686&7102 SEALS B A 7' 300 CFM 20x5 LAB B243 LAB B245 250 CFM (TYP FOR 6) 14ø 14ø 1 1/4"ø LPS 6" LPS UP, 8" LPS DN (ETR) 4" LPC UP, DN (ETR) 250 CFM (TYP FOR 6) 13ø 13ø 1"ø LPC 18X20 UP, 18X10 DN (ETR) 3 3 3 3 1"ø LPC 1 1/4"ø LPS 12ø 18ø 18x24 16ø 16ø 1200 CFM 40x18 40x18 1200 CFM 2ND FL. AREA B & DEMO PLAN 1/8" = 1'&0" 12ø 8ø 18x24 12ø 3 OFFICE B207 PREP RM. 12ø 450 CFM 720 CFM B203 7ø 120 CFM 28X36 UP, 20X36 DN (ETR) SUPPLY AIR VAV AND DUCTWORK (ETR) 16ø 390 CFM OFFICE B201 120 CFM 14X14 UP, 14X12 DN (ETR) 12ø 12ø 16x10 RETURN AIR DUCT AND REGISTER (ETR) 1 2 18X18 TRANSFER DUCT 2 L M M' N EXISTING MECHANICAL CONNECTIONS TO EXISTING FUME HOOD TO BE REMOVED BY MECHANICAL CONTRACTOR 2 30X6 TRANSFER DUCT 30X6 TRANSFER DUCT 2 18X18 TRANSFER DUCT 1 3 4 13Ø TRANSFER DUCT (ETR) O O' P' P EXISTING MECHANICAL CONNECTIONS TO EXISTING FUME HOOD TO BE REMOVED BY MECHANICAL CONTRACTOR 3 12ø 16X18 UP, DN (ETR) 30X25 UP (ETR) 20ø 14ø 34x16 40x10 17ø 12ø 3 3 D223 14ø 34x16 PREP RM D231A 1 1/4"ø LPS 1"ø LPC 3 R S T 2&1/2" LPS UP, 3" LPS DN (ETR) 1&1/2" LPC UP, DN (ETR) 10X32 UP, 10X22 DN (ETR) 20X44 UP, 20X20 DN (ETR) 2ND FL. AREA D & DEMO PLAN 1 2 3 4 5 1/8" = 1'&0" 1 E A C D KEY PLAN B PROJECT IDENTIFICATION CONVERSION OF LABORATORIES SCIENCE BUILDING QUEENS COLLEGE 66&60 Kissena Boulevard Flushing NY. 11367 1 9&13&12 <strong>ADDENDUM</strong> #1 MARK DATE DESCRIPTION PROJECT <strong>NO</strong>.: PROJ. MGR: DRAWN BY: CHECKED BY: DESIGN MGR: ISSUE BLOCK PAUL USURIELLO JOHN NADON SANDRA BENJAMIN SHEET TITLE 2ND FLOOR MECHANICAL & DEMOLITION M&101.00 43 of 65 2115419 FRANK TIER<strong>NO</strong> 9/12/2012 11:25:03 AM