(10) Drawing A>111.00 shall be replaced with Attachment No. 6: Revised Drawing A>111.00 dated 9>13>12<br />
(11) Drawing A>112.00 shall be replaced with Attachment No. 7: Revised Drawing A>112.00 dated 9>13>12<br />
(12) Drawing A>404.00 shall be replaced with Attachment No. 8: Revised Drawing A>404.00 dated 9>13>12<br />
(13) Drawing A>406.00 shall be replaced with Attachment No. 9: Revised Drawing A>406.00 dated 9>13>12<br />
(14) Drawing FP>001.00 shall be replaced with Attachment No.10: Revised Drawing FP>001.00 dated 9>13>12<br />
(15) Drawing FP>101.00 shall be replaced with Attachment No.11: Revised Drawing FP>101.00 dated 9>13>12<br />
(16) Drawing P>001.00 shall be replaced with Attachment No.12: Revised Drawing P>001.00 dated 9>13>12<br />
(17) Drawing M>101.00 shall be replaced with Attachment No.13: Revised Drawing M>101.00 dated 9>13>12<br />
(18) Drawing E>001.00 shall be replaced with Attachment No.14: Revised Drawing E>001.00 dated 9>13>12<br />
(19) Drawing E>100.00 shall be replaced with Attachment No.15: Revised Drawing E>100.00 dated 9>13>12<br />
(20) Drawing E>110.00 shall be replaced with Attachment No.16: Revised Drawing E>110.00 dated 9>13>12<br />
(21) Drawing E>130.00 shall be replaced with Attachment No.17: Revised Drawing E>130.00 dated 9>13>12<br />
(22) Drawing E>500.00 shall be replaced with Attachment No.18: Revised Drawing E>500.00 dated 9>13>12<br />
(23) Drawing E>600.00 shall be replaced with Attachment No.19: Revised Drawing E>600.00 dated 9>13>12<br />
(24) Drawing FA>001.00 shall be replaced with Attachment No.20: Revised Drawing FA>001.00 dated 9>13>12<br />
Bidder Questions and Reponses<br />
Question (1): Regarding M/WBE Requirements – Do we choose who we are giving the work? Do we give the<br />
% of work to either MBE or WBE, or is it mandatory to give 20% to both MBE and WBE?<br />
Answer (1): Refer to Section III, Article 2 of the Instructions to Bidders for information regarding<br />
participation by Minority>Owned and Women>Owned Business Enterprises. The Bidder is<br />
required to meet the requirements for participation by New York State Certified Minority>Owned<br />
Business Enterprises (MBE) at 12.00% of the total contract value, and Women>Owned Business<br />
Enterprises (WBE) at 8.00% of the total contract value. Additional information regarding<br />
M/WBE participation can be found in Appendix 2 of the Instructions to Bidders, with a link to the<br />
directory of New York State Certified MWBEs (http://www.esd.ny.gov/mwbe.html). Bidders are<br />
required to select proposed subcontractors for participation in the MWBE program associated<br />
with this project.<br />
Question (2): Drawing G001.00 states to maintain negative air pressure during construction. Is this for the<br />
entire duration of project?<br />
Answer (2):<br />
The GC is required to maintain negative air pressure for the entire duration of the project,<br />
through Substantial Completion.<br />
Question (3): Is there a specific on or off campus location where <strong>STV</strong> trailer can be located?<br />
Answer (3):<br />
There is no space available on campus for the <strong>STV</strong> office trailer. Contractor is required to locate<br />
trailer off campus in close proximity to the project site.<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (09>20>12) Page 2 of 6<br />
CITYW>CUCF>01>09>04>GC/MECH/EL/PL