<strong>ADDENDUM</strong> <strong>NO</strong>. 1<br />

September 20, 2012<br />

QUEENS COLLEGE CONVERSION OF LABORATORIES<br />

CONTRACT <strong>NO</strong>. CITYWCUCF010904GC – General Construction<br />

CONTRACT <strong>NO</strong>. CITYWCUCF010904MECH – Mechanical<br />

CONTRACT <strong>NO</strong>. CITYWCUCF010904EL Electrical<br />

CONTRACT <strong>NO</strong>. CITYWCUCF010904PL Plumbing<br />

This Addendum is being issued for the purpose of amending the subject Request for Bids (RFBs) as below and<br />

is hereby made part of said RFBs to the same extent as though it were originally included therein. This<br />

Addendum makes the following changes and clarifications to the bid documents:<br />

Changes to Bid Documents<br />

(1) Project Manual Table of Contents<br />

a. Volume 1 of 2 – Change “Envelope #3 – Low Bidders’ Additional Information Forms” to<br />

“Envelope #2 – Low Bidders’ Additional Information Forms”<br />

(2) Section II, Article 5.4 of the Instructions to Bidders – Prevailing Wage Rate/ Craft Training Program<br />

a. Replace Article 5.4 in its entirety with the following: “If an apprentice is employed on the<br />

project, they must be registered under a bona fide New York State Department of Labor<br />

Apprenticeship Program in accordance with New York State Labor Law 220.3.”<br />

(3) Section 01 11 16 – Summary of Work<br />

a. Page 011116>2 Item E – Add sentence: “In the event of a jurisdictional work issue for a prime<br />

contractor or subcontractor to a prime contractor, the other three prime contractors will be<br />

responsible for providing all labor as necessary to maintain labor harmony.”<br />

(4) Project Milestone Schedule<br />

a. Change Construction Phase Duration from “170 ccd” to “165 ccd”<br />

(5) Price Proposal for Electrical Contract<br />

a. Price Proposal for Electrical Contract shall be replaced with Attachment No. 1: Revised Price<br />

Proposal for Electrical Contract<br />

(6) Section 01 11 17 of the General Requirements shall be replaced with Attachment No. 2: Revised Section<br />

01 11 17 – Drawing List<br />

(7) Drawing G>001.00 shall be replaced with Attachment No. 3: Revised Drawing G>001.00 dated 9>13>12<br />

(8) Drawing A>100.00 shall be replaced with Attachment No. 4: Revised Drawing A>100.00 dated 9>13>12<br />

(9) Drawing A>110.00 shall be replaced with Attachment No. 5: Revised Drawing A>110.00 dated 9>13>12<br />

Page 1 of 6


(10) Drawing A>111.00 shall be replaced with Attachment No. 6: Revised Drawing A>111.00 dated 9>13>12<br />

(11) Drawing A>112.00 shall be replaced with Attachment No. 7: Revised Drawing A>112.00 dated 9>13>12<br />

(12) Drawing A>404.00 shall be replaced with Attachment No. 8: Revised Drawing A>404.00 dated 9>13>12<br />

(13) Drawing A>406.00 shall be replaced with Attachment No. 9: Revised Drawing A>406.00 dated 9>13>12<br />

(14) Drawing FP>001.00 shall be replaced with Attachment No.10: Revised Drawing FP>001.00 dated 9>13>12<br />

(15) Drawing FP>101.00 shall be replaced with Attachment No.11: Revised Drawing FP>101.00 dated 9>13>12<br />

(16) Drawing P>001.00 shall be replaced with Attachment No.12: Revised Drawing P>001.00 dated 9>13>12<br />

(17) Drawing M>101.00 shall be replaced with Attachment No.13: Revised Drawing M>101.00 dated 9>13>12<br />

(18) Drawing E>001.00 shall be replaced with Attachment No.14: Revised Drawing E>001.00 dated 9>13>12<br />

(19) Drawing E>100.00 shall be replaced with Attachment No.15: Revised Drawing E>100.00 dated 9>13>12<br />

(20) Drawing E>110.00 shall be replaced with Attachment No.16: Revised Drawing E>110.00 dated 9>13>12<br />

(21) Drawing E>130.00 shall be replaced with Attachment No.17: Revised Drawing E>130.00 dated 9>13>12<br />

(22) Drawing E>500.00 shall be replaced with Attachment No.18: Revised Drawing E>500.00 dated 9>13>12<br />

(23) Drawing E>600.00 shall be replaced with Attachment No.19: Revised Drawing E>600.00 dated 9>13>12<br />

(24) Drawing FA>001.00 shall be replaced with Attachment No.20: Revised Drawing FA>001.00 dated 9>13>12<br />

Bidder Questions and Reponses<br />

Question (1): Regarding M/WBE Requirements – Do we choose who we are giving the work? Do we give the<br />

% of work to either MBE or WBE, or is it mandatory to give 20% to both MBE and WBE?<br />

Answer (1): Refer to Section III, Article 2 of the Instructions to Bidders for information regarding<br />

participation by Minority>Owned and Women>Owned Business Enterprises. The Bidder is<br />

required to meet the requirements for participation by New York State Certified Minority>Owned<br />

Business Enterprises (MBE) at 12.00% of the total contract value, and Women>Owned Business<br />

Enterprises (WBE) at 8.00% of the total contract value. Additional information regarding<br />

M/WBE participation can be found in Appendix 2 of the Instructions to Bidders, with a link to the<br />

directory of New York State Certified MWBEs (http://www.esd.ny.gov/mwbe.html). Bidders are<br />

required to select proposed subcontractors for participation in the MWBE program associated<br />

with this project.<br />

Question (2): Drawing G001.00 states to maintain negative air pressure during construction. Is this for the<br />

entire duration of project?<br />

Answer (2):<br />

The GC is required to maintain negative air pressure for the entire duration of the project,<br />

through Substantial Completion.<br />

Question (3): Is there a specific on or off campus location where <strong>STV</strong> trailer can be located?<br />

Answer (3):<br />

There is no space available on campus for the <strong>STV</strong> office trailer. Contractor is required to locate<br />

trailer off campus in close proximity to the project site.<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (09>20>12) Page 2 of 6<br />

CITYW>CUCF>01>09>04>GC/MECH/EL/PL


Question (4): Drawing A100.00 – Demo note #3 states to discard and or salvage existing equipment. For<br />

bidding purposes can you specify which pieces get discarded and which pieces get salvaged?<br />

Answer (4):<br />

Equipment to be salvaged will be identified prior to start of demolition. Contractor to include<br />

cost of removal and disposal and/or removal and salvage as part of Total Bid Price. Salvage<br />

includes removal and turn>over to college at a storage location on the Queens College campus as<br />

designated by the college.<br />

Question (5): Drawing A100.00 – Demo note #4 states to remove VCT floor and base. Is this at all rooms that<br />

have existing VCT and base?<br />

Answer (5):<br />

The existing VCT and base, including mastic and adhesive, in all labs and prep rooms within the<br />

scope of work for this project shall be removed (Rooms B237, B241, B243, B245, B203, B211,<br />

D231, and D231A).<br />

Question (6): Is shot blasting of floors required prior to resinous flooring application? And does it have to be<br />

done after hours?<br />

Answer (6):<br />

Shot blasting is required for the preparation of concrete substrates to receive resinous flooring.<br />

See Section 096723 of the Contract Specifications for further details regarding the installation of<br />

resinous flooring. Preparation work and application of resinous flooring shall be performed after<br />

normal work hours. There is no additional compensation for after hours work. See Section<br />

011116 of the Contract General Conditions for further details regarding work restrictions.<br />

Question (7): Drawing A100.00 Note 10 states to remove existing blackboards. Please provide quantity.<br />

Answer (7):<br />

Drawing A100.00 Note 10 has been revised to include removal of all existing blackboards and<br />

whiteboards. Quantity to be verified in field by Contractor.<br />

Question (8): Drawing A110.00/ P601.00 – Which prime provides emergency shower/eyewash?<br />

Answer (8):<br />

The Plumbing Contractor shall furnish and install the combination emergency shower eye/ face<br />

wash units and the deck mounted hand held emergency eye/ face wash units. See Dwg. P>501.00<br />

and Specification Section 224500 (Emergency Plumbing Fixtures) for further information.<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Note the following regarding Laboratory Fixtures:<br />

• Plumbing Contractor furnishes and installs Weldbilt Double Compartment Scullery Sink and<br />

associated faucet (Spec Section 224300>2.03) in Rm D231. All epoxy resin sinks (Spec<br />

Section 123553>2.08) are furnished and installed by General Contractor. Associated faucets<br />

for epoxy resin sinks are furnished by General Contractor and installed by Plumbing<br />

Contractor. Air, vacuum and gas turrets are furnished by General Contractor and installed by<br />

Plumbing Contractor.<br />

• Electrical pedestals housing for laboratory casework shall be furnished by General<br />

Contractor and installed by Electrical Contractor.<br />

Addendum No. 1 (09>20>12) Page 3 of 6<br />

CITYW>CUCF>01>09>04>GC/MECH/EL/PL


• The installation contractor is responsible for accepting delivery and storage of material<br />

furnished by other contractor(s), in accordance with the requirements of the contract. The<br />

installation contractor must furnish and install all ancillary components to provide complete<br />

installation for proper operation of equipment and material.<br />

Question (9): Who furnishes and installs smart boards?<br />

Answer (9):<br />

Smart boards shall be furnished and installed by the Electrical Contractor. See Specialty<br />

Equipment Schedule on Drawings A>401.00, A>402.00, A>403.00, A>404.00, and A>407.00.<br />

Question (10): Spec Section 013529 Note 11 – Does GC provide watchmen service?<br />

Answer (10): The General Contractor shall provide security services for the <strong>STV</strong> Construction Field Office<br />

and Equipment. The General Contractor is also responsible for the security of the work site and<br />

to provide suitable site protection to prevent unauthorized entry onto the site, until final<br />

acceptance by CUNY, in accordance with contract requirements.<br />

Question (11): Spec Section 015100>2E – Where can we place temp toilets?<br />

Answer (11): Queens College will provide an area on campus outside the Science Building for the General<br />

Contractor to locate temporary toilets.<br />

Question (12): Spec Sect 05100>3H – Is temp fence required?<br />

Answer (12): Temporary fencing is not required.<br />

Question (13): Spec Sect 011116>11 2.2 a>1 calls for temp barricades. Please provide locations where these<br />

barricades are to be constructed.<br />

Answer (13): Temporary construction barricades are required in the corridors adjacent to the entrances of the<br />

laboratories within the scope of work for this project. General Contractor shall comply with<br />

Section 011116 of the General Requirements for design of the temporary construction barricade.<br />

Question (14): Spec Sect 011116>9 1.9 – Note 9 calls for masonite protection of floors. Can this protection be<br />

left in place or must it be picked up and reinstalled on daily basis?<br />

Answer (14): The General Contractor is permitted to leave protection in place as long as it is maintained on a<br />

daily basis, presents no tripping hazard, and does not obstruct doors or create any type of access<br />

issues, in accordance with the contract General Requirements.<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (09>20>12) Page 4 of 6<br />

CITYW>CUCF>01>09>04>GC/MECH/EL/PL


Question (15): Is the existing fire alarm system approved by the fire department?<br />

Answer (15): An allowance of $25,000.00 has been included in the Revised Electrical Price Proposal for work<br />

performed by the Electrical Contractor directly related to correction of non>compliance issues for<br />

the existing Fire Alarm System in the Queens College Science Building. All costs to be verified.<br />

Question (16): Who will be responsible to file the application for plan examination for the additional panel and<br />

devices related to the fire alarm system?<br />

Answer (16): <strong>STV</strong> has filed the application for plan examination for the additional fire alarm panel and<br />

devices.<br />

Question (17): Who is responsible for the design of the new fire alarm system?<br />

Answer (17): <strong>STV</strong> has developed the design of the new fire alarm system as specified in the Contract<br />

Documents.<br />

Question (18): If the fire department requires additional coverage, who will be responsible for the additional<br />

cost?<br />

Answer (18): FDNY requirement for additional coverage exceeding the contract design documents shall be<br />

processed as a change order to the electrical base contract.<br />

Question (19): Drawing FA>001.00 General Note #12 reads “Electrical Contractor shall verify operation of<br />

existing fire alarm pull stations throughout the building for possible replacement.” Can you<br />

please provide count of how many pull stations are in the building?<br />

Answer (19): Attachment No. 21 – Fire Alarm System Pull Station Code Card is included in this Addendum<br />

for your use in determining the existing pull stations throughout the Queens College Science<br />

Building.<br />

Question (20): Who is responsible for the replacement of any non>functioning pull stations?<br />

Answer (20): The Electrical Contractor is responsible for replacement of any non>functioning pull stations,<br />

under the Allowance for work performed by the Electrical Contractor directly related to<br />

correction of non>compliance issues for the existing Fire Alarm System.<br />

Question (21): Drawing E>600.00 note regarding the existing distribution panel reads “…Replace existing<br />

overcurrent device(s) previously serving removed panel(s) with new compatible 200A, 3P + N<br />

overcurrent device (typical).” Who is responsible to verify that existing overcurrent devices<br />

service only the mentioned panels?<br />

Answer (21): The Electrical Contractor is responsible to verify that existing overcurrent devices service only<br />

the mentioned panels, as part of base contract work.<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (09>20>12) Page 5 of 6<br />

CITYW>CUCF>01>09>04>GC/MECH/EL/PL


Question (22): In the event that the overcurrent devices service additional load not within the working space,<br />

who is responsible for the temporary power to the additional load?<br />

Answer (22): The Electrical Contractor is responsible for the temporary power to the additional load. The<br />

contractor’s cost to provide temporary power to the additional load will be processed as a change<br />

order for extra work.<br />

Question (23): Since we were not able to see the distribution panels, can you please provide existing distribution<br />

panel manufacturer and model number also the type of breaker required.<br />

Answer (23): Attachment No. 22 – Nameplate Data for Existing Distribution Panels and Attachment No. 23 –<br />

Nameplate Data for Existing Panelboard Units are included in this Addendum for your use.<br />

Question (24): Please provide approximate distance between existing distribution panels and new panels located<br />

inside the labs.<br />

Answer (24): Attachment No. 24 – CUNY QC SB 1 st Floor Directory, Attachment No. 25 – CUNY QC SB 2 nd<br />

Floor Directory, and Attachment No. 26 – CUNY QC SB 3 rd Floor Directory are included in this<br />

Addendum for your use in determining the distance between existing distribution panels and new<br />

panels located inside labs. Locations of existing distribution panels are indicated in Part Power<br />

Riser Diagram – New, on Drawing E>600.00.<br />

By signing in the space provided below, the Proposer acknowledges receipt of this Addendum. This<br />

Addendum must be signed by the Proposer and submitted with the Proposal.<br />

________________________<br />

Name of Proposer<br />

________________________ ____________________ ____________________________ ____________<br />

Name of Authorized Proposer Title Signature Date<br />

Representative<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (09>20>12) Page 6 of 6<br />

CITYW>CUCF>01>09>04>GC/MECH/EL/PL


ATTACHMENT <strong>NO</strong>. 1<br />

REVISED PRICE PROPOSAL FOR ELECTRICAL<br />

CONTRACT<br />

CITYWCUCF010904EL<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


PRICE PROPOSAL – ENVELOPE 1<br />

PRICE PROPOSAL SUBMISSION<br />

for<br />

LUMP SUM BID<br />

to<br />

<strong>STV</strong> CONSTRUCTION, INC.<br />

for the following:<br />

Contract Number:<br />

CITYWCUCF010904EL<br />

Contract Name/ Description: Science Building – 2 nd Floor Conversion of Laboratories –<br />

Electrical Contractor<br />

College:<br />

Borough:<br />

Queens College__________________________________<br />

Queens_________________________________________<br />

Bid<br />

of<br />

______________________________________________________________________________<br />

(Bidder’s Name) (Bidder’s Federal I.D. #)<br />

a corporation organized and existing under the laws of the State of<br />

or a limited liability company organized and existing under the laws of the State of<br />

or a partnership or joint venture consisting of<br />

A. Price Proposal Submission:<br />

The Bidder shall complete and execute this Price Proposal Form and enclose it in a sealed and<br />

clearly marked and properly identified envelope with all other required bid documents.<br />

The bidder must submit its sealed Price Proposal to <strong>STV</strong> Construction, <strong>Inc</strong>. in accordance with<br />

the terms listed in the Instruction to Bidders or modified by Addendum. See Instructions to<br />

Bidders and all Contract documents.<br />

65


PRICE PROPOSAL – ENVELOPE 1<br />

B. Time is of the essence for completion of the project in this package.<br />

C. Price<br />

1. The undersigned, as Bidder, declares:<br />

• That this Price Proposal is made, without collusion with any other person, firm or<br />

corporation;<br />

• That the bidder has carefully examined the form of the Project Manual, Advertisement /<br />

Request for Bids, Contract / Form of Contract, Instructions to Bidders, Addenda,<br />

Specifications, Plans and all other Contract Documents;<br />

• That the Bidder has carefully examined the locations, conditions and classes of material<br />

for the proposed work; and<br />

• That the bidder agrees that it will provide all necessary machinery, tools, apparatus and<br />

other means of construction and will do all work and furnish all the materials called for<br />

in the Contract Documents in the manner therein prescribed.<br />

2. In submitting this Price Proposal, the Bidder agrees:<br />

• That <strong>STV</strong> Construction, <strong>Inc</strong>., and/or CUNY and/or CUCF has the right to reject this<br />

Price Proposal in accordance with the Instructions to Bidders.<br />

• To hold this Price Proposal open for a period of one9hundred9twenty (120) calendar<br />

days from the date of the public opening and reading of the Price Proposals, unless this<br />

time period is extended by mutual agreement of the Bidder and <strong>STV</strong> Construction, <strong>Inc</strong>.<br />

• To accomplish the work at the price bid, in accordance with the Contract Documents.<br />

3. Total Price:<br />

Total amount for the furnishing of all labor, materials, services, and equipment required in<br />

conjunction with and properly incidental to all work, in conformance with all Contract<br />

Documents.<br />

In case of a discrepancy between the amount shown in words and the amount shown in<br />

figures, the amount shown in words shall govern.<br />

THE PUBLIC OPENING AND READING OF PRICE IS FOR INFORMATIONAL<br />

PURPOSES ONLY AND IS <strong>NO</strong>T TO BE CONSTRUED AS AN ACCEPTANCE OR<br />

REJECTION OF ANY BID SUBMITTED.<br />

66


PRICE PROPOSAL – ENVELOPE 1<br />

TOTAL<br />

PRICE:__________________________________________________________________<br />

(In Words)<br />

$___________________________________________________________<br />

(In Figures)<br />

D. WORK COST BREAKDOWN<br />

The attached Work Cost Breakdown Form shall be filled out and submitted by the Contractor.<br />

The Total must equal the Total Price, under Section C.3. of this Price Proposal Submission.<br />

FAILURE TO COMPLETE THE WORK COST BREAKDOWN MAY RESULT IN<br />

DISQUALIFICATION OF THE BID.<br />

E. ALLOWANCE FOR FIRE ALARM SYSTEM COMPLIANCE WORK<br />

The Total Price shall include an allowance of $25,000.00 for work performed by the Electrical<br />

Contractor directly related to correction of non9compliance issues for the existing Fire Alarm System in<br />

the Queens College Science Building. All costs associated with the Fire Alarm System Allowance work<br />

to be verified.<br />

67


PRICE PROPOSAL – ENVELOPE 1<br />

QUEENS COLLEGE SCIENCE BUILDING – 2 ND FLOOR CONVERSION OF LABORATORIES<br />

CONTRACT <strong>NO</strong>. CITYWCUCF010904EL<br />

FORM OF PROPOSAL – WORK COST BREAKDOWN<br />

This form shall be filled out and submitted by the Contractor. The Total must equal the Total Price,<br />

under Section C.3.<br />

FAILURE TO COMPLETE THE WORK COST BREAKDOWN MAY RESULT IN<br />

DISQUALIFICATION OF THE BID.<br />

BIDDER: ____________________________________________________________________<br />

DATE: ______________________________________________________________________<br />

ITEM<br />

# DIVISION DESCRIPTION TOTAL COST<br />

1 01 Supervision/ Management $<br />

2 01 Permits $<br />

3 01 Insurance $<br />

4 01 Bonds $<br />

5 01 Safety $<br />

6 01 Cutting & Patching $<br />

7 01 Misc. General Requirements $<br />

8 02 Selective Demolition $<br />

9 07<br />

Thermal and Moisture Protection<br />

(Firestopping)<br />

$<br />

10 10 Specialties (Visual Display Units) $<br />

11 26 Roughing $<br />

12 26 Power Panels $<br />

13 26 Power Receptacles & Circuitry $<br />

14 26 Lighting & Circuitry $<br />

15 27 Tele5Data Communications $<br />

16 28 Access Control $<br />

17 28 Fire Alarm System $<br />

18 28<br />

Allowance 5 Correction of Non5<br />

Compliance Issues for Existing Fire<br />

Alarm System (All Costs to be<br />

Verified) $ 25,000.00<br />

Overhead & Profit (15%) $<br />

TOTAL (Must Equal Total Price) $<br />

68


PRICE PROPOSAL – ENVELOPE 1<br />

F. UNIT PRICES<br />

The Contractor shall provide the following Unit Prices which include, but are not limited to all<br />

necessary labor, material, taxes, supervision, insurance, equipment, tools, layout, freight,<br />

trucking, engineering, overhead, and profit, etc. in order to provide for a complete installation.<br />

The Unit Prices shall be used for added and deleted work in accordance with the Contract<br />

Documents. The Unit Prices shall be held for the duration of the Contract.<br />

Steel Pipe Sleeves up to 2"<br />

Firestopping<br />

Raceway<br />

Armored Cable<br />

Occupancy Sensor 9 Wall mounted<br />

_________ /Each<br />

_________/location<br />

_________/lf<br />

_________ /lf<br />

_________/Each<br />

Occupancy Sensor 9 Ceiling Mounted<br />

Power Pack for Occupancy Sensor<br />

Panel Board 9 flush mounted<br />

Thermal Magnetic Circuit Breaker<br />

GFCI Circuit Breaker<br />

Duplex Receptacle<br />

Quad Receptacles<br />

Duplex Receptacles 9 GFCI<br />

Quad Receptacles 9 GFCI<br />

Receptacle for Lab Equipment<br />

Toggle Switch<br />

Raceway 9 Wall type<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

69


PRICE PROPOSAL – ENVELOPE 1<br />

Dimmer Switch<br />

LED Exit Sign w/ Emergency Battery<br />

SS Cable Tray<br />

Power Strip<br />

Optical Fiber Cable<br />

Junction Box<br />

EMT Conduit 3/4"<br />

EMT Conduit 1/2"<br />

_________/Each<br />

_________/Each<br />

_________/lf<br />

_________/lf<br />

_________/lf<br />

_________/Each<br />

_________/lf<br />

_________/lf<br />

#10 Wire _________/lf<br />

#12 wire _________/lf<br />

Replacement of Existing<br />

Fire Alarm Pull Station<br />

(testing included in base bid)<br />

_________/Each<br />

G. CERTIFICATION<br />

The bidder hereby certifies to the best of its knowledge and belief and under penalty of<br />

perjury under the laws of the United States and the State of New York:<br />

1. That all information provided herein is accurate and truthful.<br />

2. That the bid has been executed with full authority to do so; that the bidder has not directly<br />

or indirectly entered into any agreement, participated in any collusion, or otherwise taken<br />

any action in restraint of free, competitive bidding in connection with these projects; and<br />

that all statements contained in this bid and in this certification are true and correct and<br />

made with full knowledge that <strong>STV</strong> Construction, <strong>Inc</strong>., CUNY and CUCF rely upon the<br />

truth of the statements contained in this bid and in the statements contained in this<br />

certification in awarding the contract for the projects.<br />

3. That neither the bidder nor its principals:<br />

A. are currently debarred, suspended, proposed for debarment, declared ineligible,<br />

or voluntarily excluded from bidding or contracting by any agency of<br />

government including but not limited to federal, state, regional, county or local<br />

government agency, in this or any other state including any department,<br />

70


PRICE PROPOSAL – ENVELOPE 1<br />

division, commission, authority, office, branch, section and political subdivision<br />

or other governmental or quasi9governmental entity;<br />

B. have, within a three9year period preceding this bid, been convicted or had a civil<br />

judgment rendered against them for commission of fraud or a criminal offense<br />

in connection with obtaining, attempting to obtain or performing a public<br />

federal, state or local contract ; violation of federal or state antitrust statutes or<br />

commission of embezzlement, theft, forgery, bribery, falsification or destruction<br />

of records, making false statements, or receiving stolen property;<br />

C. are currently indicted for or otherwise criminally or civilly charged by a<br />

governmental entity (federal, state or local) with commission of any of the<br />

offenses enumerated in paragraph (B) of this certification; and<br />

D. have, within a three9year period preceding this bid, had one or more public<br />

contracts (federal, state or local) terminated for cause or default.<br />

4. The Bidder has, or will subcontract to firms having, current, valid contractor or trade<br />

licenses and permits required under applicable New York State and New York City laws<br />

for any trade or specialty area in which the firm seeks to perform work.<br />

5. During the term of construction of the projects that comprise this package, the contractor<br />

will have in place a suitable quality control and quality assurance program and an<br />

appropriate safety and health plan.<br />

6. The amount of the Price Proposal and the value of the Bidder’s outstanding incomplete<br />

contracts does not exceed the firm’s existing aggregate rating limit.<br />

7. The undersigned understands and agrees with the terms and conditions contained within the<br />

Form of Contract and Instructions to Bidders 1, Section III, Article 6: Times for<br />

Completion and Article 7: Liquidated Damages.<br />

MILESTONE<br />

TASK<br />

LIQUIDATED DAMAGE<br />

AMOUNT<br />

I.<br />

GC CONTRACT<br />

● Asbestos Abatement Complete<br />

$500.00 Per Calendar Day<br />

II.<br />

III.<br />

ALL PRIME CONTRACTS<br />

● Demolition Complete<br />

MECH/ EL/ PL CONTRACTS<br />

● Roughing Complete<br />

$500.00 Per Calendar Day<br />

$500.00 Per Calendar Day<br />

71


PRICE PROPOSAL – ENVELOPE 1<br />

MILESTONE<br />

TASK<br />

LIQUIDATED DAMAGE<br />

AMOUNT<br />

GC CONTRACT<br />

$500.00 Per Calendar Day<br />

IV.<br />

● Completion of GWB Installation<br />

V. ALL PRIME CONTRACTS<br />

$2,500.00 Per Calendar Day<br />

● Substantial Completion and NYC DOB Letter of Completion<br />

8. Where the bidder is unable to certify to any of the statements in this certification, the bidder<br />

shall explain below.<br />

____________________________________________________________________________<br />

____________________________________________________________________________<br />

____________________________________________________________________________<br />

____________________________________________________________________________<br />

_______________________________________________________________________<br />

____________________________________________________________________________<br />

____________________________________________________________________________<br />

____________________________________________________________________________<br />

____________________________________________________________________________<br />

_______________________________________________________________________<br />

____________________________________________________________________________<br />

__________________________________________________________________________<br />

72


PRICE PROPOSAL – ENVELOPE 1<br />

IN WITNESS WHEREOF, the bidder has caused this instrument to be signed, attested to<br />

and sealed.<br />

Bidder:<br />

(Legal Firm Name)<br />

By:<br />

(Signature)<br />

(Printed or Typed Name)<br />

Title: ______________________________________<br />

Address:_____________________________________<br />

_________________________________<br />

E9mail Address_________________<br />

Telephone No. _______<br />

Fax No. ____________<br />

Date:<br />

Witness: ___________________________________________<br />

Printed or Typed Name: _______________________________<br />

Date:_______________________________________________<br />

END OF PRICE PROPOSAL<br />

73


ATTACHMENT <strong>NO</strong>. 2<br />

GENERAL REQUIREMENTS – SECTION 01 11 17<br />

DRAWING LIST<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


GENERAL REQUIREMENTS – 01 11 17<br />

SECTION 01 11 17<br />

Drawing List<br />

QUEENS COLLEGE CONVERSION OF LABORATORIES<br />

Project Location: 6660 Kissena Blvd, Flushing, NY 11367<br />

Science Building: 2 nd Floor<br />

LIST OF DRAWINGS:<br />

Drawing Revision Date<br />

GENERAL DRAWINGS:<br />

G000.00 COVER SHEET 062512<br />

G001.00 GENERAL <strong>NO</strong>TES, SYMBOLS, AND BLDG CODES 091312<br />

ARCHITECTURAL DRAWINGS:<br />

A 001.00 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS 062512<br />

A 002.00 AREAS OF WORK PLAN 062512<br />

A100.00 SECOND FLOOR DEMOLITION PLANS 091312<br />

A110.00 CONSTRUCTION PLAN ROOMS B237, B241, B211 091312<br />

A111.00 CONSTRUCTION PLAN ROOMS B243, B245, B203 091312<br />

A112.00 CONSTRUCTION PLAN ROOMS D231, D231A 091312<br />

A210.00 REFLECTED CEILING PLAN ROOMS B237, B241, B211 062512<br />

A211.00 REFLECTED CEILING PLAN ROOMS B243, B245, B203 062512<br />

A212.00 REFLECTED CEILING PLAN ROOMS D231, D231A 062512<br />

A301.00 LADDER AND CEILING DETAILS 062512<br />

A302.00 PARTITION TYPES 062512<br />

A401.00 ENLARGED PLAN & ELEVATIONS LAB B237 062512<br />

A402.00 ENLARGED PLAN & ELEVATIONS LAB B241 062512<br />

A403.00 ENLARGED PLAN & ELEVATIONS LAB B243 062512<br />

A404.00 ENLARGED PLAN & ELEVATIONS LAB B245 091312<br />

A405.00 ENLARGED PLAN & ELEVATIONS PREP RM. B203 062512<br />

A406.00 ENLARGED PLAN & ELEVATIONS PREP RM. B211 091312<br />

A407.00 ENLARGED PLAN & ELEVATIONS LAB D231 062512<br />

A408.00 ENLARGED PLAN & ELEVATIONS ROOM D231A 062512<br />

A601.00 DOOR SCHEDULE & DOOR DETAILS 062512<br />

A701.00 FINISH PLANS AND SCHEDULES 062512<br />

HAZMAT ABATEMENT DRAWINGS:<br />

H001.00 SECOND FLOOR ABATEMENT PLANS 062512<br />

FIRE PROTECTION DRAWINGS:<br />

FP001.00 SPRINKLER <strong>NO</strong>TES, SYMBOLS, AND ABBREVIATIONS 091312<br />

FP100.00 FIRE PROTECTION BASEMENT FLOOR PLAN 062512<br />

FP101.00 SECOND FLOOR PLAN FIRE PROTECTION 091312<br />

FP400.00 FIRE PROTECTION RISER DIAGRAM 062512<br />

0111171


GENERAL REQUIREMENTS – 01 11 17<br />

FP500.00 DETAIL SHEET 062512<br />

PLUMBING DRAWINGS:<br />

P001.00 PLUMBING <strong>NO</strong>TES, SYMBOLS, AND ABBREVIATIONS 091312<br />

P100.00 2ND FLOOR PLUMBING DEMOLITION PLAN 1 OF 2 062512<br />

P101.00 2ND FLOOR PLUMBING DEMOLITION PLAN 2 OF 2 062512<br />

P102.00 2ND FLOOR PLUMBING PART PLAN 1 OF 3 062512<br />

P103.00 2ND FLOOR PLUMBING PART PLAN 2 OF 3 062512<br />

P104.00 2ND FLOOR PLUMBING PART PLAN 3 OF 3 062512<br />

P401.00 PLUMBING DOMESTIC WATER & LAB WASTE RISER DIAGRAMS 062512<br />

P402.00 PLUMBING COMPRESSED AIR, VACUUM, & GAS RISER DIAGRAMS 062512<br />

P500.00 PLUMBING DETAILS 1 OF 2 062512<br />

P501.00 PLUMBING DETAILS 2 OF 2 062512<br />

P601.00 PLUMBING SCHEDULE SHEET 062512<br />

MECHANICAL DRAWINGS:<br />

EN001.00 ENERGY CODE COMPLIANCE 062512<br />

M001.00 MECHANICAL LEGEND, ABBREVIATIONS, AND <strong>NO</strong>TES 062512<br />

M101.00 2 ND FLOOR MECHANICAL DEMOLITION 091312<br />

M102.00 2 ND FLOOR MECHANICAL – NEW WORK SHEET 1 062512<br />

M103.00 2 ND FLOOR MECHANICAL – NEW WORK SHEET 2 062512<br />

M104.00 2 ND FLOOR MECHANICAL – NEW WORK SHEET 3 062512<br />

M105.00 ROOF PART PLANS AND DETAILS 062512<br />

M401.00 AIR RISER DIAGRAMS 062512<br />

M402.00 LABORATORY CONTROLS DIAGRAM 062512<br />

M501.00 MECHANICAL DETAILS – 1 062512<br />

M502.00 MECHANICAL DETAILS – 2 062512<br />

M503.00 MECHANICAL DETAILS – 3 062512<br />

M601.00 MECHANICAL SCHEDULES 062512<br />

ELECTRICAL DRAWINGS:<br />

E001.00 ELECTRICAL SYMBOLS LIST, ABBREVIATIONS, AND <strong>NO</strong>TES 091312<br />

E100.00 2ND FLOOR LIGHTING PART PLANS DEMO 091312<br />

E110.00 2 ND FLOOR POWER & LOW VOLTAGE PART PLANS DEMO 091312<br />

E120.00 2 ND FLOOR LIGHTING PART PLANS 062512<br />

E130.00 2 ND FLOOR POWER & LOW VOLTAGE PART PLANS 091312<br />

E500.00 DETAILS 091312<br />

E600.00 ELECTRICAL RISER DIAGRAMS 091312<br />

E601.00 ELECTRICAL PANEL SCHEDULES 062512<br />

E602.00 ELECTRICAL PANEL SCHEDULES 062512<br />

FIRE ALARM SYSTEM DRAWINGS:<br />

FA001.00 SYMBOL LIST, GENERAL <strong>NO</strong>TES & RISER DIAGRAM 091312<br />

FA100.00 CELLAR FIRE ALARM PLAN 062512<br />

FA101.00 2 ND FLOOR FIRE ALARM PLAN 062512<br />

END OF DRAWING LIST<br />

0111172


ATTACHMENT <strong>NO</strong>. 3<br />

DWG. G001.00 (091312)<br />

GENERAL <strong>NO</strong>TES, SYMBOLS & BLDG. CODES<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

GENERAL <strong>NO</strong>TES<br />

APPLICABLE BUILDING CODES<br />

<strong>STV</strong><br />

D<br />

THE FOLLOWING <strong>NO</strong>TES SHALL APPLY THROUGHOUT. EXCEPTIONS ARE SPECIFICALLY <strong>NO</strong>TED ON EACH DRAWING.<br />

1. EACH CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE AS REQUIRED TO VERIFY THE DRAWINGS<br />

AND TO PERFORM THIS WORK AS PER CONTRACT DOCUMENTS. ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE SURVEY SHALL<br />

BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IMMEDIATELY. <strong>NO</strong> WORK SHALL PROCEED UNTIL THE DISCREPANCY HAS BEEN<br />

RESOLVED.<br />

2.DRAWINGS ARE <strong>NO</strong>T TO BE SCALED. USE DIMENSIONS ONLY. ALL DIMENSIONS ON THE DRAWINGS MUST BE VERIFIED AT THE SITE BY<br />

EACH CONTRACTOR BEFORE ORDERING ANY MATERIAL OR PERFORMING ANY WORK. ANY DISCREPANCIES IN THE DRAWINGS AND<br />

SPECIFICATIONS SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY. <strong>NO</strong> CHANGE TO THE DRAWINGS OR SPECIFICATIONS IS<br />

PERMITTED WITHOUT WRITTEN CONSENT OF THE ARCHITECT.<br />

3. THE CONTRACTOR SHALL, UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, SECURE AND PAY FOR ALL REQUIRED<br />

CONSTRUCTION PERMIT(S), FEES, LICENSE AND INSPECTIONS NECESSARY TO EXECUTE THE WORK IN FULL COMPLIANCE WITH ALL NYC<br />

APPLICABLE CODES AND REGULATIONS AND WITH THE CONTRACT DOCUMENTS.<br />

4. COORDINATION OF ALL WORK UNDER THIS CONTRACT SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED BY THE CONTRACT<br />

DOCUMENTS TO ENSURE THE QUALITY AND TIMELY COMPLETION OF THE WORK/PROJECT.<br />

5. EACH CONTRACTOR SHALL PERFORM ALL CUTTING AND PATCHING REQUIRED TO COMPLETE THE WORK OR TO MAKE ITS PARTS FIT<br />

TOGETHER PROPERLY WITHOUT COMPROMISING THE QUALITY OF THE WORK.<br />

THE FOLLOWING <strong>NO</strong>TES SHALL APPLY THROUGHOUT:<br />

1. WORK SHALL BE EXECUTED IN FULL COMPLIANCE WITH THE APPLICABLE PROVISIONS OF ALL LAWS, BYLAWS, STATUTES,<br />

ORDINANCES, CODES, RULES, REGULATIONS AND LAWFUL ORDERS OF PUBLIC AUTHORITIES BEARING ON THE PERFORMANCE AND<br />

EXECUTION OF THE WORK.<br />

2. THE WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING CODES AND STANDARDS.<br />

A. 2008 NEW YORK CITY BUILDING CODE.<br />

B. 2008 NEW YORK CITY FUEL GAS CODE.<br />

C. 2008 NEW YORK CITY MECHANICAL CODE.<br />

D. NEW YORK CITY PLUMBING CODE.<br />

E. NATIONAL FIRE PROTECTION ASSOCIATION (N.F.P.A. 72).<br />

F<br />

2011 NEW YORK CITY ELECTRICAL CODE<br />

G. UNDERWRITER LABORATORIES (UL DESIGN).<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

6. ALL EXISTING FIRE RATED CONDITIONS DISTURBED BY THE WORK SHALL BE RESTORED TO MATCH THE ORIGINAL FIRE RATED<br />

CONDITIONS.<br />

H. FEDERAL STATE / LOCAL AUTHORITIES HAVING JURISDICTION.<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

7. THE GC SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST<br />

DAMAGE, BREAKAGE,COLLAPSE, DISTORTIONS, AND OFF ALIGNMENTS ACCORDING TO ALL APPLICABLE CODES AND STANDARDS AND<br />

PER BEST PRACTICES OF THE INDUSTRY. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR SHORING AND BRACING WITH<br />

CALCULATIONS SIGNED AND SEALED BY NEW YORK PROFESSIONAL ENGINEER.<br />

SPECIAL INSPECTIONS<br />

t 9146867102<br />

8. DURING CONSTRUCTION, TEMPORARY BAFFLES, PARTITIONS, ENCLOSURES, TO SEAL OPENINGS TO PREVENT DUST AND DIRT FROM<br />

FILTERING INTO OCCUPIED AREAS ARE TO BE PROVIDED BY THE GC.<br />

THE FOLLOWING SPECIAL INSPECTIONS REQUIRED IN ACCORDANCE WITH SECTION 27132 AND THE APPLICABLE<br />

SECTIONS OF THE BUILDING CODE ARE LISTED IN THE FOLLOWING TABLES:<br />

C<br />

9. THE CONTRACTOR SHALL KEEP THE WORK SITE FREE FROM DEBRIS AND ACCUMULATED REFUSE AND SHALL HAVE SOLE<br />

RESPONSIBILITY FOR PROTECTING ALL AREAS FROM ENTRY BY UNAUTHORIZED PARTIES. THE SITE SHALL BE LEFT BROOM CLEAN AT<br />

THE END OF EACH WORKING DAY.<br />

10. GENERAL CONTRACTOR SHALL COORDINATE THE INSTALLATION OF PLUMBING FIXTURES PRIOR TO THE CONSTRUCTION OF<br />

PARTITIONS BEHIND SUCH FIXTURES.<br />

11. ALL VERTICAL AND HORIZONTAL SHAFTS SHALL HAVE A MINIMUM FIRE RATING OF 2HOURS UNLESS REQUIRED OTHERWISE BY<br />

CODE.<br />

SPECIAL INSPECTION<br />

CODE SECTION<br />

FIRE ALARM BC 907 . BC 1704.13<br />

FIRE STOP, DRAFTSHOP, AND FIREBLOCK SYSTEM BC 1704.25<br />

MECHANICAL SYSTEMS BC 1704.15<br />

SPRINKLER SYSTEMS BC 1704.21<br />

1<br />

12. ALL LINTELS GREATER THAN 4'0" SHALL BE STRUCTURALLY SUPPORTED.<br />

ENERGY CODE COMPLIANCE INSPECTIONS BC 109.3.5<br />

13. ALL ELECTRICAL & MECHANICAL INDICATIONS ON ARCHITECTURAL DRAWINGS ARE FOR LOCATION PURPOSES ONLY.<br />

FIRE RESISTANCE RATED CONSTRUCTION BC 109.3.4<br />

14. THE GENERAL CONTRACTOR SHALL EXTEND ALL WALL FINISHES A MINIMUM OF 6" ABOVE SUSPENDED OR FURRED CEILINGS.<br />

15. ALL WORK SHALL BE INSTALLED SO THAT ALL PARTS THAT REQUIRE ACCESS ARE READILY ACCESSIBLE FOR INSPECTION,<br />

OPERATION, MAINTENANCE AND REPAIR.<br />

FINAL 28116.2.4.2, BC 109.5<br />

DIRECTIVE 14 OF 1975 AND 1 RCNY 10110<br />

ENERGY CODE PROGRESS INSPECTIONS<br />

16. EACH CONTRACTOR SHALL MAINTAIN FREE AND U<strong>NO</strong>BSTRUCTED ACCESS FROM ALL FLOORS AND ADJACENT SPACES INTO THE<br />

EXISTING FIRE STAIRS TO OUTSIDE OF THE BUILDING AT ALL TIMES.<br />

17. THE GENERAL CONTRACTOR SHALL PROVIDE BARRICADES AROUND WORK AREAS AS REQUIRED TO PREVENT STAFF, STUDENTS<br />

AND OTHER UNAUTHORIZED PERSONS FROM ENTERING THEREIN.<br />

HVAC AND SERVICE WATER HEATING EQUIPMENT<br />

HVAC AND SERVICE WATER HEATING SYSTEM CONTROLS<br />

DUCT PLENUM AND PIPING INSULATION AND SEALING<br />

(IB3) (IIB3)<br />

(IB4), (IIB4)<br />

(IB5) (IIB5)<br />

SEALS<br />

18. WHERE MANUFACTURERS NAMES AND PRODUCT NUMBERS ARE INDICATED ON THE DRAWINGS IT SHALL BE CONSTRUED TO MEAN<br />

THE ESTABLISHING OF QUALITY AND PERFORMANCE STANDARDS OF SUCH ITEMS. ALL OTHER PRODUCTS MUST BE SUBMITTED TO THE<br />

ARCHITECT FOR APPROVAL BEFORE THEY SHALL BE DEEMED EQUAL.<br />

INTERIOR LIGHTING POWER<br />

LIGHTING CONTROLS<br />

(IIC3)<br />

(IIC5)<br />

19. DIMENSIONS ON PLANS ARE INDICATED FROM SURFACE TO SURFACE BETWEEN WALLS, PARTITIONS AND OTHER ITEMS EXCLUSIVE<br />

OF FINISHES.<br />

20. EACH CONTRACTOR SHALL PATCH AND REPAIR ALL FLOORS, WALLS, CEILINGS, ETC. IN SPACES WHETHER IN SCOPE OR <strong>NO</strong>T THAT<br />

HAVE BEEN DAMAGED OR EXPOSED DUE TO WORK, REMOVALS OR TEMPORARY STORAGE AND FINISH THEM TO MATCH ADJOINING<br />

SURFACES.<br />

EXIT SIGNS<br />

MAINTENANCE INFORMATION<br />

(IIC6)<br />

(ID1),(IID1)<br />

OWNER WILL HIRE THE SPECIAL INSPECTION AGENCY OR ENGINEER AND ARCHITECT TO PERFORM THE SPECIAL<br />

INSPECTIONS.<br />

21. IF ANY UTILITIES OR SERVICES ARE INTERRUPTED DURING THE EXECUTION OF THE CONTRACT, IT IS THE RESPONSIBILITY OF EACH<br />

CONTRACTOR TO REROUTE AND/OR PROVIDE TEMPORARY SERVICE SO AS <strong>NO</strong>T TO DISRUPT ANY SERVICE TO THE BUILDING.<br />

EACH CONTRACTOR MUST <strong>NO</strong>TIFY THE CONSTRUCTION MANAGER TO ARRANGE THE SPECIAL INSPECTIONS AT LEAST<br />

SEVENTY TWO (72) HOURS PRIOR TO THE NEED FOR THE INSPECTION.<br />

B<br />

22. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ALL METHODS AND MEANS OF CONSTRUCTION AND PROVIDE ALL SAFEGUARDS<br />

TO INSURE SAFETY TO THE PUBLIC FOR THE DURATION OF THIS RE<strong>NO</strong>VATION PROJECT.<br />

23. WHERE EXISTING DOOR FRAMES ARE TO BE REPLACED, REMOVE PORTION OF EXISTING WALL IN ORDER TO REMOVE AND REINSTALL<br />

NEW DOOR FRAME AND JAMB ANCHOR, PATCH AND MATCH EXISTING WALL CONSTRUCTION AND FINISHES.<br />

SUMMARY OF WORK<br />

24. THE GENERAL CONTRACTOR SHALL REMOVE, PROTECT AND STORE ALL FURNITURE, HARDWARE, EQUIPMENTS AS DIRECTED BY THE<br />

OWNER.<br />

25. EACH CONTRACTOR SHALL MAINTAIN <strong>NO</strong>ISE CONTROL AT THE JOB SITE. CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH<br />

THE COLLEGE SCHEDULE AND ACTIVITIES.<br />

CONVERSION OF FIVE (5) LABORATORIES AND (3) PREP ROOMS<br />

The project consists of plans and specifications to convert five existing physics and astronomy laboratories into biology teaching laboratories at Queens<br />

College Science Building Rooms B237, B241, B243, B245, & D231. Renovation of three existing prep rooms is also included in the scope of work. The labs<br />

occupy approximately 4,321 sf and approximately 766 sf of prep space, broken down as follows:<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

26. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING / COVERING ALL EXISTING WINDOW UNITS FROM DUST/ DIRT AND<br />

CLEAN TO CURRENT WORKING CONDITIONS AS FOUND.<br />

27. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH COLLEGE FACILITIES REQUIREMENTS WHEN NEED ARISES TO DISCONNECT AND<br />

OR RELOCATE FIRE ALARM STROBES. THE EC SHALL PROVIDE CONTI<strong>NO</strong>US FIRE WATCH IF REQUIRED WHEN WORK IS EXECUTED ON THE<br />

FIRE ALARM SYSTEM.<br />

Lab Space<br />

B237 897sf<br />

B241 897sf<br />

B243 897sf<br />

B245 886sf<br />

D231 744sf<br />

QUEENS COLLEGE<br />

6660 Kissena Boulevard<br />

Flushing NY. 11367<br />

28. ALL HOT WORK ( WELDING, BRAZING, ETC) WILL REQUIRE COORDINATION, WRITTEN APPROVAL AND SIGN OFFS FROM COLLEGE<br />

PUBLIC SAFETY TO DEACTIVATE SMOKE DETECTORS WHILE WORKING AND <strong>NO</strong>TIFICATION WHEN COMPLETED ON A DAILY BASIS.<br />

29. AFTER ASBESTOS ABATEMENT PROCEDURES ARE COMPLETED, GENERAL CONTRACTOR TO REPLACE SEALANTS, INSULATION OR<br />

ANY OTHER ABATED MATERIAL WITH <strong>NO</strong>NASBESTOS MATERIAL IN ORDER TO ASSURE SYSTEMS ARE RESTORED TO GOOD WORKING<br />

CONDITION.<br />

30. WHERE EXISTING WALLS ARE TO BE PATCHED OR NEW FINISH AND BASE OF WALL ARE TO MATCH EXISTING ADJACENT FINISHES, DO<br />

SO FOR THE ENTIRE LENGHT OF THE WALL OR REFER TO FINISH SCHEDULE.<br />

31. GC TO OBSERVE QUEENS COLLEGE ACCEPTED PROCEDURES FOR WASTEOUT, INCLUDING EARLY DAY SERVICE BY CARTING<br />

COMPANY, QUICK REMOVAL OF MINI CONTAINERS FROM PEDESTRIAN AREAS, ETC.<br />

32. GENERAL CONTRACTOR TO MAINTAIN THE WORK AREAS UNDER NEGATIVE AIR PRESSURE TO MINIMIZE THE PROPAGATION OF DUST<br />

AND ODORS TO OCCUPIED AREAS OF THE BUILDING. RETURN AIR GRILLES LEADING TO BUILDING HVAC SYSTEMS ARE TO BE COVERED<br />

DURING WORK PERIODS AND WHEN MATERIALS ARE OFFGASSING.<br />

Lab Prep Space<br />

B211 357sf<br />

B203 357sf<br />

D231A 52sf<br />

Work required for this project will be performed under four (4) separate contracts:<br />

A. Contract No. CITYWCUCF010904GC: General Construction Work GC<br />

B. Contract No. CITYWCUCF010904MECH: Mechanical/ HVAC Work MECH<br />

C. Contract No. CITYWCUCF010904EL: Electrical Work EC<br />

D. Contract No. CITYWCUCF010904PL: Plumbing & Fire Protection Work PC<br />

E. Each Trade Contractor shall be responsible for performing the work items specified or shown in the Specifications and accompanying drawings<br />

issued as a part of its Contract, and shall coordinate its work with that of the other Contractors.<br />

F. Each Trade Contractor and their subcontractors are required to cooperate with the Owner, the Owner’s representatives, and other Contractors<br />

in regard to scheduling, storage, deliveries, and construction.<br />

1 91312 <strong>ADDENDUM</strong> # 1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

No. 2115419<br />

PAUL USURIELLO<br />

HECTOR ANDRADE<br />

JAMES HEMMERLY<br />

SANDRA BENJAMIN<br />

A<br />

1 2 3 4 5<br />

SHEET TITLE<br />

GENERAL<br />

<strong>NO</strong>TES,<br />

SYMBOLS &<br />

BLDG. CODES<br />

G001.00<br />

2<br />

of 65<br />

9/10/2012 2:15:52 PM


ATTACHMENT <strong>NO</strong>. 4<br />

DWG. A100.00(091312)<br />

SECOND FLOOR DEMOLITION PLANS<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

DEMOLITION <strong>NO</strong>TES<br />

<strong>STV</strong><br />

D<br />

7'<br />

7<br />

6<br />

5 4 3 2<br />

1. COORDINATE ALL REMOVAL WORK WITH NEW CONSTRUCTION.<br />

2. SEE MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION AND ASBESTOS ABATEMENT DWGS. FOR<br />

ADDITIONAL DEMOLITION INFORMATION.<br />

3. CONTRACTOR SHALL DISPOSE ALL EXISTING FURNITURE / EQUIPMENT AND SHALL COORDINATE WITH<br />

THE CONSTRUCTION MANAGER TO DETERMINE AS DIRECTED BY THE OWNER TO SALVAGED SPECIFIC<br />

FURNITURE/EQUIPMENT AND TURN THEM OVER TO OWNERTO BE STORED AT LOCATION DESIGNATED BY OWNER.<br />

4. REMOVE EXISTING VCT FLOORING AND WALL BASE INCLUDING MASTICS AND ADHESIVES IN ALL ROOMS IN SCOPE OF<br />

WORK, AND EITHER SHOT BLAST OR DIAMOND GRIND ALL FLOORS TO RECEIVE NEW EPOXY FLOORING.<br />

5. ALL EXISTING <strong>NO</strong>NFIXED LAB EQUIPMENT SHALL BE REMOVED BY QUEENS COLLEGE FACILITIES DEPARTMENT.<br />

9. REMOVE EXISTING ACOUSTICAL SUSPENDED CEILING AND ITS SUPPORTS IN ROOMS B211 & D231A<br />

10. ALL EXISTING BLACK BOARDS AND WHITE BOARDS TO BE REMOVED.<br />

1<br />

1<br />

1<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

11. GENERAL CONTRACTOR TO COORDINATE WITH ELECTRICAL CONTRACTOR FOR PROPER DISPOSAL<br />

OF ALL LIGHTING FIXTURES AND FLOURESCENT BULBS AND MECHANICAL CONTRACTOR FOR PROPER DISPOSAL<br />

OF THERMOSTATS SCHEDULED TO BE REMOVED. GENERAL CONSTRACTOR TO PROPERLY DISPOSE OF UNIVERSAL<br />

WASTE AND FLOURESCENT BULBS AS SPECIFIED IN SECTION 132860 OF THE CONTRACT SPECIFICATIONS.<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

PHYSICS LAB<br />

G'<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

D235<br />

31'3 1/2"<br />

H'<br />

DEMOLITION KEY <strong>NO</strong>TES<br />

C<br />

Room<br />

B215<br />

H<br />

1<br />

2<br />

EXISTING LAB BENCHES TO BE REMOVED.<br />

EXISTING DOORS AND FRAMES TO BE REMOVED<br />

3<br />

I<br />

3<br />

4<br />

EXISTING SINKS AND CABINETS TO BE REMOVED<br />

EXISTING FURNITURE AND EQUIPMENT TO BE REMOVED SERVICE CONNECTIONS TO BE REMOVED BY<br />

MECH, EC AND PC.<br />

1<br />

2<br />

1<br />

Biology Lab<br />

B237<br />

4<br />

2<br />

4<br />

5<br />

EXISTING SMARTBOARD TO BE REMOVED AND ALL ASSOCIATED MOUNTING FRAME AND HARDWARE.<br />

DEMOLITION KEY <strong>NO</strong>TES ARE TYPICAL FOR ALL LABS AND PREPARATION ROOMS.<br />

J<br />

B<br />

A<br />

2<br />

Corridor<br />

C001<br />

2<br />

2<br />

5'8" TYP.<br />

1<br />

1<br />

13'4" TYP.<br />

Biology Lab<br />

B241<br />

Biology Lab<br />

B243<br />

Biology Lab<br />

B245<br />

30'8 3/4"<br />

Corridor<br />

C002<br />

1<br />

4<br />

4<br />

3<br />

1<br />

3<br />

2<br />

2<br />

3<br />

2<br />

Prep. Room<br />

B211 4<br />

5<br />

Office<br />

B209<br />

Office<br />

B207<br />

4<br />

Prep. Room<br />

B203<br />

4<br />

1<br />

4<br />

Office<br />

B201<br />

Corridor<br />

C003<br />

K<br />

L<br />

M<br />

M'<br />

N<br />

O<br />

O'<br />

P<br />

Room<br />

D233<br />

Inst. Storage<br />

D233A<br />

5 4 3<br />

Corridor<br />

C002<br />

Biology Lab<br />

2<br />

D231<br />

4<br />

4<br />

4<br />

2'6" TYP.<br />

15'0" TYP.<br />

2<br />

Prep. Room<br />

Pipe Space<br />

D231A<br />

D227<br />

LAB<br />

D223<br />

Q<br />

R<br />

S<br />

T<br />

E<br />

A<br />

C<br />

B<br />

PROJECT IDENTIFICATION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

SEALS<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6660 Kissena Boulevard<br />

Flushing NY. 11367<br />

1 91312 <strong>ADDENDUM</strong> # 1<br />

MARK DATE DESCRIPTION<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

HECTOR ANDRADE<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

No. 2115419<br />

JAMES HEMMERLY<br />

1<br />

SECOND FL. DEMOLITION PLAN "AREA B"<br />

Q<br />

2<br />

SECOND FL. DEMOLITION PLAN "AREA D"<br />

D<br />

SECOND FLOOR<br />

DEMOLITION<br />

PLANS<br />

A100.00 1/8" = 1'0"<br />

0 4' 8' 16'<br />

A100.00 1/8" = 1'0"<br />

0 4' 8' 16'<br />

1 2 3 4 5<br />

KEY PLAN<br />

A100.00<br />

5<br />

of 65<br />

9/13/2012 2:17:32 PM


ATTACHMENT <strong>NO</strong>. 5<br />

DWG. A110.00(091312)<br />

CONSTRUCTION PLAN ROOMS B237, B241, & B211<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

6<br />

5 4 3 2<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

3'0"<br />

PHYSICS LAB<br />

D235<br />

34'0" EPOXY COUNTERTOP TYP.<br />

1'6"<br />

6'3" +/<br />

1<br />

8'0"<br />

Room<br />

B215<br />

H'<br />

H<br />

CONSTRUCTION <strong>NO</strong>TES<br />

1. REFER TO SHEET G001 FOR GENERAL ARCHITECTURAL <strong>NO</strong>TES.<br />

2. FOR DOOR SCHEDULE,DOOR TYPES AND DETAILS SEE DRAWINGS A601<br />

3. FOR FINISH SCHEDULE SEE DRAWING A701.<br />

4. FOR CASEWORK / EQUIPMENT SEE A400'S SERIES DRAWINGS.<br />

5. ALL DIMENSIONS ARE <strong>NO</strong>MINAL AND TO BE FIELD VERIFIED BY CONTRACTOR.<br />

6. AFTER REMOVAL OF EXIST. DUCTS, PIPES, CONDUITS WHICH PENETRATED EXIST.<br />

WALLS AND FLOOR SLABS, CONTRACTOR TO INFILL OPENINGS TO MATCH EXIST.<br />

MATERIAL AND FIRE RATING. "REFER TO SECTION 017329 OF THE GENERAL<br />

CONDITIONS FOR CUTTING AND PATCHING REQUIREMENTS"<br />

1<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

12'0" TYP.<br />

5'0" 5'0" 5'0"<br />

2<br />

4<br />

I<br />

7. FOR PARTITION TYPES SEE DRAWING A302<br />

8. EXISTING FLOOR SLAB TO BE PATCHED, REPAIRED, LEVELED AND PREPARED TO<br />

RECEIVED NEW FINISHES<br />

9. PATCH ALL HOLES AND OTHER UNPROTECTED OPENINGS IN EXISTING RATED<br />

SHAFTS. NEW PATCHES TO MATCH EXISTING FIRERATING OF ASSEMBLY.<br />

C<br />

B<br />

Corridor<br />

C001<br />

21'10" 21'9 1/4"<br />

5<br />

2<br />

5<br />

2'2"<br />

2'2"<br />

1'6"<br />

2'0"<br />

1'6" MIN.<br />

6'3 1/4"<br />

Biology Lab<br />

B237<br />

8'6"<br />

7'6"<br />

8'0"<br />

Biology Lab<br />

B241<br />

3<br />

4 A401.00<br />

2<br />

5<br />

6'2"<br />

2<br />

3'0" 5'0" 5'0" 5'0" 7'2 1/2" +/<br />

1'6" MIN.<br />

6<br />

12'6"<br />

4'0" TYP.<br />

7<br />

34'0"<br />

7'5 3/4"<br />

4'0" TYP.<br />

5 1<br />

7<br />

2'0"<br />

2<br />

5 A402.00<br />

3<br />

4<br />

8'0"<br />

3'8"<br />

3'7" +/<br />

2<br />

4<br />

1<br />

3'8 1/4"<br />

5'0"<br />

1'11 3/4"<br />

4<br />

3<br />

6"<br />

8'0"<br />

2'4"<br />

2 4<br />

3<br />

6 1/4"<br />

8'2"<br />

8'0"<br />

A406.00 6<br />

5<br />

1<br />

Prep. Room<br />

B211<br />

4'0" 3'11" 2'0"<br />

2<br />

A406.00 4<br />

3<br />

Office<br />

B209<br />

8'0"<br />

2'10"<br />

Corridor<br />

C003<br />

J<br />

K<br />

L<br />

1<br />

2<br />

3<br />

CONSTRUCTION KEY <strong>NO</strong>TES<br />

NEW SINK. SEE PLUMBING DRAWINGS.<br />

4 NEW EMERGENCY EYEWASH. SEE PLUMBING DRAWINGS.<br />

5<br />

NEW ADA SINK. SEE PLUMBING DRAWINGS.<br />

EMERGENCY SHOWER / EYEWASH WITH RECESSED MIXING VALVE, SEE PLUMBING DWGS.<br />

PATCH PORTIONS OF EXISTING WALLS & FLOORS AS REQUIRED AND FINISH<br />

TO MATCH EXISTING ADJACENT<br />

6 HIGH EFFICIENCY FUME HOOD, SEE MECH, PLUMB DRWGS.<br />

7 SMART BOARD, SEE ELECTRICAL DRWGS.<br />

8<br />

CUT NEW OPENING FOR HOLLOW METAL FRAME; PROVIDE SQUARE AND TRUE FRAMED<br />

OPENING; PATCH AND REPAIR WALL AS REQUIRED TO ALIGN WITH ADJACENT WALL<br />

SURFACES.<br />

SEALS<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6660 Kissena Boulevard<br />

Flushing NY. 11367<br />

Biology Lab<br />

B243<br />

SEE DWG. A111<br />

Office<br />

B207<br />

1 91312 <strong>ADDENDUM</strong> # 1<br />

MARK DATE DESCRIPTION<br />

ISSUE BLOCK<br />

A<br />

1<br />

CONSTRUCTION PLANS ROOMS B237, B241, B211<br />

A110.00 1/4" = 1'0"<br />

0 2' 4' 8'<br />

1 2 3 4 5<br />

A<br />

E C<br />

D<br />

KEY PLAN<br />

B<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

PAUL USURIELLO<br />

HECTOR ANDRADE<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

CONSTRUCTION<br />

PLAN ROOMS<br />

B237, B241 &<br />

B211<br />

A110.00<br />

6<br />

of 65<br />

No. 2115419<br />

JAMES HEMMERLY<br />

<strong>STV</strong> INC.<br />

9/10/2012 2:13:45 PM


ATTACHMENT <strong>NO</strong>. 6<br />

DWG. A111.00(091312)<br />

CONSTRUCTION PLAN ROOMS B243, B245, & B203<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

6<br />

5 4 3 2<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

Office<br />

B209<br />

CONSTRUCTION <strong>NO</strong>TES<br />

1. REFER TO SHEET G001 FOR GENERAL ARCHITECTURAL <strong>NO</strong>TES.<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

1'6"<br />

SEE DWG. A110<br />

1<br />

2'0"<br />

8'0"<br />

Office<br />

L<br />

2. FOR DOOR SCHEDULE,DOOR TYPES AND DETAILS SEE DRAWINGS A601<br />

3. FOR FINISH SCHEDULE SEE DRAWING A701.<br />

4. FOR CASEWORK / EQUIPMENT SEE A400'S SERIES DRAWINGS.<br />

5. ALL DIMENSIONS ARE <strong>NO</strong>MINAL AND TO BE FIELD VERIFIED BY CONTRACTOR.<br />

6. AFTER REMOVAL OF EXIST. DUCTS, PIPES, CONDUITS WHICH PENETRATED EXIST.<br />

WALLS AND FLOOR SLABS, CONTRACTOR TO INFILL OPENINGS TO MATCH EXIST.<br />

MATERIAL AND FIRE RATING. "REFER TO SECTION 017329 OF THE GENERAL<br />

CONDITIONS FOR CUTTING AND PATCHING REQUIREMENTS"<br />

7. FOR PARTITION TYPES SEE DRAWING A302<br />

1<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

B207<br />

8. EXISTING FLOOR SLAB TO BE PATCHED, REPAIRED, LEVELED AND PREPARED TO<br />

RECEIVED NEW FINISHES<br />

9. PATCH ALL HOLES AND OTHER UNPROTECTED OPENINGS IN EXISTING RATED<br />

SHAFTS. NEW PATCHES TO MATCH EXISTING FIRERATING OF ASSEMBLY.<br />

C<br />

21'9 3/4"<br />

5<br />

3'0" 5'0" 5'0" 5'0"<br />

9'2" +/<br />

2 4<br />

7"<br />

Corridor<br />

C003<br />

M<br />

M'<br />

CONSTRUCTION KEY <strong>NO</strong>TES<br />

B<br />

Corridor<br />

C001<br />

22'0 1/2"<br />

2<br />

1'10"<br />

2<br />

5<br />

7<br />

1'6" MIN.<br />

4<br />

12'0" TYP.<br />

4'0"<br />

12'6"<br />

6'4"<br />

Biology Lab<br />

B243<br />

2<br />

5 A403.00<br />

3<br />

4<br />

7'6"<br />

8'0"<br />

5'0" 5'0" 5'0"<br />

7<br />

3'8"<br />

6'3" +/<br />

1<br />

4'4"<br />

1<br />

3<br />

1<br />

1<br />

2<br />

1<br />

6"<br />

1'9"<br />

4<br />

2<br />

A405.00 6<br />

3<br />

5<br />

2<br />

A405.00<br />

4<br />

Prep. Room<br />

3<br />

B203<br />

5'3" 8'2"<br />

8'5"<br />

4'0" 3'8" 2'0"<br />

8'0"<br />

N<br />

O<br />

O'<br />

1<br />

2<br />

3<br />

NEW SINK. SEE PLUMBING DRAWINGS.<br />

4 NEW EMERGENCY EYEWASH. SEE PLUMBING DRAWINGS.<br />

5<br />

NEW ADA SINK. SEE PLUMBING DRAWINGS.<br />

EMERGENCY SHOWER / EYEWASH WITH RECESSED MIXING VALVE, SEE PLUMBING DWGS.<br />

PATCH PORTIONS OF EXISTING WALLS & FLOORS AS REQUIRED AND FINISH<br />

TO MATCH EXISTING ADJACENT<br />

6 HIGH EFFICIENCY FUME HOOD, SEE MECH, PLUMB DRWGS.<br />

7 SMART BOARD, SEE ELECTRICAL DRWGS.<br />

8<br />

CUT NEW OPENING FOR HOLLOW METAL FRAME; PROVIDE SQUARE AND TRUE FRAMED<br />

OPENING; PATCH AND REPAIR WALL AS REQUIRED TO ALIGN WITH ADJACENT WALL<br />

SURFACES.<br />

SEALS<br />

PROJECT IDENTIFICATION<br />

3'0"<br />

3'0"<br />

4'0" TYP.<br />

1'10"<br />

8'6"<br />

Biology Lab<br />

B245<br />

7'6"<br />

2<br />

5 A404.00<br />

3<br />

4<br />

4'0" 4'4 3/4"<br />

3'8"<br />

2 4<br />

8'0"<br />

Office<br />

B201<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6660 Kissena Boulevard<br />

Flushing NY. 11367<br />

7<br />

8<br />

2'0"<br />

P<br />

A<br />

1<br />

A111.00<br />

8<br />

5<br />

Corridor<br />

C002<br />

CONSTRUCTION PLANS ROOMS B243, B245, B203<br />

1/4" = 1'0"<br />

0 2' 4' 8'<br />

1 2 3 4 5<br />

A<br />

E C<br />

D<br />

KEY PLAN<br />

B<br />

1 91312 <strong>ADDENDUM</strong> # 1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

HECTOR ANDRADE<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

CONSTRUCTION<br />

PLAN ROOMS<br />

B243, B245 &<br />

B203<br />

A111.00<br />

7<br />

of 65<br />

No. 2115419<br />

JAMES HEMMERLY<br />

9/10/2012 2:13:46 PM


ATTACHMENT <strong>NO</strong>. 7<br />

DWG. A112.00(091312)<br />

CONSTRUCTION PLAN ROOMS D231 & D231A<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

5 4 3<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

P<br />

CONSTRUCTION <strong>NO</strong>TES<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

Corridor<br />

C002<br />

1. REFER TO SHEET G001 FOR GENERAL ARCHITECTURAL <strong>NO</strong>TES.<br />

2. FOR DOOR SCHEDULE,DOOR TYPES AND DETAILS SEE DRAWINGS A601<br />

3. FOR FINISH SCHEDULE SEE DRAWING A701.<br />

4. FOR CASEWORK / EQUIPMENT SEE A400'S SERIES DRAWINGS.<br />

5. ALL DIMENSIONS ARE <strong>NO</strong>MINAL AND TO BE FIELD VERIFIED BY CONTRACTOR.<br />

1<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

C<br />

2'7"<br />

2'0"<br />

9<br />

3'0"<br />

1<br />

5<br />

12'0" TYP.<br />

Q<br />

6. AFTER REMOVAL OF EXIST. DUCTS, PIPES, CONDUITS WHICH PENETRATED EXIST.<br />

WALLS AND FLOOR SLABS, CONTRACTOR TO INFILL OPENINGS TO MATCH EXIST.<br />

MATERIAL AND FIRE RATING. "REFER TO SECTION 017329 OF THE GENERAL<br />

CONDITIONS FOR CUTTING AND PATCHING REQUIREMENTS"<br />

7. FOR PARTITION TYPES SEE DRAWING A302<br />

8. EXISTING FLOOR SLAB TO BE PATCHED, REPAIRED, LEVELED AND PREPARED TO<br />

RECEIVED NEW FINISHES<br />

9. PATCH ALL HOLES AND OTHER UNPROTECTED OPENINGS IN EXISTING RATED<br />

SHAFTS. NEW PATCHES TO MATCH EXISTING FIRERATING OF ASSEMBLY.<br />

4'4"<br />

1'6"<br />

8'6"<br />

CONSTRUCTION KEY <strong>NO</strong>TES<br />

1<br />

NEW SINK. SEE PLUMBING DRAWINGS.<br />

7'6"<br />

Biology Lab<br />

7<br />

D231<br />

5'0"<br />

4'4"<br />

5'0"<br />

EPOXY COUNTER TOP 25'2" VIF.<br />

2<br />

3<br />

4 NEW EMERGENCY EYEWASH. SEE PLUMBING DRAWINGS.<br />

5<br />

NEW ADA SINK. SEE PLUMBING DRAWINGS.<br />

EMERGENCY SHOWER / EYEWASH WITH RECESSED MIXING VALVE, SEE PLUMBING DWGS.<br />

PATCH PORTIONS OF EXISTING WALLS & FLOORS AS REQUIRED AND FINISH<br />

TO MATCH EXISTING ADJACENT<br />

6 HIGH EFFICIENCY FUME HOOD, SEE MECH, PLUMB DRWGS.<br />

7 SMART BOARD, SEE ELECTRICAL DRWGS.<br />

8<br />

CUT NEW OPENING FOR HOLLOW METAL FRAME; PROVIDE SQUARE AND TRUE FRAMED<br />

OPENING; PATCH AND REPAIR WALL AS REQUIRED TO ALIGN WITH ADJACENT WALL<br />

SURFACES.<br />

SEALS<br />

R<br />

B<br />

8'0"<br />

4'4"<br />

2<br />

PROJECT IDENTIFICATION<br />

6<br />

3<br />

4<br />

A407.00<br />

3<br />

5<br />

1'9"<br />

2<br />

4<br />

3'0"<br />

6'2" 3'0" 1 1/4"<br />

6'4"<br />

S<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6660 Kissena Boulevard<br />

Flushing NY. 11367<br />

10<br />

1<br />

2<br />

1'6" MIN.<br />

A<br />

A408.00<br />

3<br />

4<br />

Prep. Room<br />

D231A<br />

T<br />

E<br />

A<br />

C<br />

B<br />

1 91312 <strong>ADDENDUM</strong> # 1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

HECTOR ANDRADE<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

No. 2115419<br />

JAMES HEMMERLY<br />

1<br />

A112.00 1/4" = 1'0"<br />

CONSTRUCTION PLANS ROOMS D231 & D231A<br />

1 2 3 4 5<br />

D<br />

KEY PLAN<br />

CONSTRUCTION<br />

PLAN ROOMS<br />

D231 & D231A<br />

A112.00<br />

8<br />

of 65<br />

9/12/2012 4:49:59 PM


ATTACHMENT <strong>NO</strong>. 8<br />

DWG. A404.00(091312)<br />

ENLARGED PLAN & ELEVATIONS LAB B245<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

C13<br />

EXIST.<br />

ACCESS<br />

PANEL<br />

E18<br />

E4<br />

C2<br />

C2<br />

C2<br />

C1<br />

CASEWORK SCHEDULE LAB B245<br />

ITEM<br />

# DESCRIPTION WIDTH DEPTH QTY<br />

PROVIDED<br />

BY<br />

INSTALLED<br />

BY<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

C<br />

2'10 1/2" 1'7 1/2" 2'6"<br />

2'10" 1'6" 2'6"<br />

C8<br />

C30<br />

3<br />

A404.00<br />

C1<br />

C23<br />

C29<br />

C2 C2 C1 C1 C2 C2 C1 C1 C2 C2 C1 C1<br />

C17<br />

E11<br />

SOUTH ELEVATION LAB B245<br />

1/4" = 1'0"<br />

C17<br />

C25<br />

C5<br />

C16<br />

C17<br />

C9<br />

C27<br />

C6<br />

C17<br />

C5<br />

3'0" 1'8" 2'6"<br />

C30<br />

C28<br />

C22<br />

C1<br />

1'6" 2'6"<br />

3'0"<br />

8'6"<br />

3'0" 1'8" 2'6"<br />

C5<br />

5<br />

A404.00<br />

C27<br />

C17<br />

C16<br />

C7 C7 C7<br />

WEST ELEVATION LAB B245<br />

1/4" = 1'0"<br />

1'6"<br />

C1 C1 C13<br />

C30 C22 C30 C23<br />

2'10 1/2" 1'7 1/2" 2'6"<br />

C4<br />

8'6"<br />

C1 UPPER CABINETDOUBLE GLASS 2' 6" 1' 0" 9 GC GC<br />

DOOR<br />

C2 UPPER CABINETDOUBLE GLASS 2' 0" 1' 0" 8 GC GC<br />

DOOR<br />

C4 BASE CABINET ADA 2' 6" 1' 5" 7 GC GC<br />

C5 BASE CABINETDOUBLE DOOR & 4' 0" 1' 9 5/8" 2 GC GC<br />

2 DRAWERS<br />

C6 BASE CABINET SINGLE DOOR & 2' 0" 1' 10" 1 GC GC<br />

DRAWER<br />

C7 BASE CABINET 1DOOR 1' 6" 1' 9 5/8" 24 GC GC<br />

PULLOUT WRITING TABLET ADA<br />

C8 BASE CABINET ADA SINK 3' 0" 2' 0" 1 GC GC<br />

C9 AUDIO VISUAL CABINET 2' 6" 1' 10" 1<br />

C13 UPPER CABINETDOUBLE GLASS 3' 0" 1' 0" 1 GC GC<br />

DOOR<br />

C16 COUNTER TOP 34' 0" 1' 6" 1 GC GC<br />

C17 COUNTER TOP 12' 0" 4' 0" 4 GC GC<br />

C19 BASE CABINETDOUBLE DOOR & 5' 0" 1' 9 3/4" 1 GC GC<br />

2 DRAWERS<br />

C22 COUNTER TOP 5' 0" 2' 0" 1 GC GC<br />

C23 COUNTER TOP 3' 0" 2' 0" 1 GC GC<br />

C25 COUNTER TOP 4' 0" 2' 0" 1 GC GC<br />

C27 COUNTER TOP 6' 0" 2' 0" 1 GC GC<br />

C28 EPOXY DROPIN SINK 2' 0" 1' 4" 1 GC GC / PC<br />

C29 EPOXY ADA DROPIN SINK 1' 2" 10" 1 GC GC /PC<br />

C30 SINK FAUCET 2 GC PC<br />

68<br />

1<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

2<br />

C4<br />

A404.00<br />

C7 C7 C4 C4 C7 C7 C4 C4 C7<br />

<strong>NO</strong>RTH ELEVATION LAB B245<br />

1/4" = 1'0"<br />

6<br />

C7<br />

C4<br />

C4<br />

C7<br />

C7<br />

E5 C19<br />

E5<br />

C19<br />

C8<br />

5 4 3<br />

4<br />

A404.00 1/4" = 1'0"<br />

EAST ELEVATION LAB B245<br />

SPECIALTY EQUIPMENT SCHEDULE LAB B245<br />

ITEM<br />

# DESCRIPTION SIZE QTY<br />

INSTALLED<br />

BY<br />

PROVIDED<br />

BY<br />

E4 SMART Board Interactive 6'5 1/2"W X 4'1 1/2" H 1 EC EC<br />

Whiteboard Model 685ix<br />

E5 PLANT INCUBATOR 31" x 46" x 46" 2 GC COLLEGE<br />

E11 REFRIGERATOR 33" X 35" x 84" 1 GC COLLEGE<br />

E18 BRACKET MOUNTED FIRE<br />

EXTINGUISHER<br />

2'6" 1<br />

5<br />

SEALS<br />

33'10 1/2"<br />

B<br />

C16<br />

Prep. Room<br />

N<br />

ELEVATION <strong>NO</strong>TES<br />

1. FOR DOOR TYPES & SCHEDULE SEE DWG A601<br />

PROJECT IDENTIFICATION<br />

C4 C4 C4 C4 C4 C4<br />

C4<br />

C1 C2 C2 C1 C1 C2 C2 C1 C1 C2 C2 C1 C1<br />

B203<br />

2. FOR FINISH SCHEDULE SEE DWG A701<br />

3. FOR ELECTRICAL DEVICES, SEE ELECTRICAL DRAWINGS<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

C7<br />

C7<br />

C7 C7<br />

C7 C7<br />

C7 C7<br />

C17 C17 C17 C17<br />

E5<br />

E5<br />

C30<br />

4. FOR CASEWORK AND EQUIPMENT SHOWN SEE SCHEDULE FOR<br />

RESPONSIBLE PROVIDERS AND INSTALLATION PARTIES<br />

5. PROVIDE WALL BLOCKING AS NECESSARY AT ALL INSTALLED<br />

CASEWORK. SEE MANUFACTURER'S SPECIFICATIIONS.<br />

QUEENS COLLEGE<br />

6660 Kissena Boulevard<br />

Flushing NY. 11367<br />

C7<br />

C7<br />

C7<br />

C7<br />

C7<br />

C7<br />

C7<br />

C7<br />

C28<br />

O<br />

6. FOR GAS, VACUUM AND COMPRESSED AIR UTILITIES TO BE PROVIDED, SEE<br />

PLUMBING DRAWINGS.<br />

C1<br />

A<br />

Corridor<br />

C001<br />

1/4" = 1'0"<br />

C7<br />

C7<br />

C2<br />

C5<br />

C2<br />

C7<br />

C27C6<br />

8'6"<br />

ENLARGED PLAN LAB B245<br />

C7<br />

C9<br />

Biology Lab<br />

B245<br />

Corridor<br />

C002<br />

E4<br />

C7<br />

C7<br />

C25<br />

5<br />

C5<br />

4'0"<br />

2<br />

A404.00<br />

3<br />

4<br />

E11<br />

C7<br />

C7<br />

E18<br />

C19<br />

C22<br />

C1<br />

C29<br />

C8<br />

C13<br />

C23<br />

EXIST.<br />

ACCESS<br />

PANEL<br />

1 2 3 4 5<br />

0<br />

C30<br />

5'0"<br />

3'0"<br />

2' 4' 8'<br />

O'<br />

P<br />

E<br />

A<br />

C<br />

D<br />

KEY PLAN<br />

B<br />

1 91312 <strong>ADDENDUM</strong> # 1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

HECTOR ANDRADE<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

ENLARGED<br />

PLAN &<br />

ELEVATIONS<br />

LAB B245<br />

A404.00<br />

17<br />

of 65<br />

No. 2115419<br />

JAMES HEMMERLY<br />

9/13/2012 12:13:16 PM


ATTACHMENT <strong>NO</strong>. 9<br />

DWG. A406.00(091312)<br />

ENLARGED PLAN & ELEVATIONS PREP RM B211<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

C1<br />

C13<br />

C2<br />

CASEWORK SCHEDULE PREP ROOM. B211<br />

ITEM # DESCRIPTION WIDTH DEPTH QTY<br />

PROVIDED<br />

BY<br />

INSTALLED<br />

BY<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

C<br />

3<br />

A406.00<br />

2'6" 2'0" 2'6"<br />

C10<br />

C11 C11 C11<br />

SOUTH ELEVATION PREP. RM. B211<br />

1/4" = 1'0"<br />

10'9 1/4"<br />

5<br />

A406.00<br />

C33<br />

C23<br />

C30<br />

C11<br />

E14 E7 C8<br />

WEST ELEVATION PREP. RM. B211<br />

1/4" = 1'0"<br />

E18 C1 C1 C1 C1 C1<br />

C1 UPPER CABINETDOUBLE 2' 6" 1' 0" 5 GC GC<br />

GLASS DOOR<br />

C2 UPPER CABINETDOUBLE 2' 0" 1' 0" 1 GC GC<br />

GLASS DOOR<br />

C5 BASE CABINETDOUBLE 4' 0" 1' 9 5/8" 6 GC GC<br />

DOOR & 2 DRAWERS<br />

C8 BASE CABINET ADA SINK 3' 0" 2' 0" 1 GC GC<br />

C10 DESK 4' 0" 2' 6" 1 COLLEGE GC<br />

C11 TALL STORAGE CABINET 3' 0" 1' 4" 5 GC GC<br />

C13 UPPER CABINETDOUBLE 3' 0" 1' 0" 1 GC GC<br />

GLASS DOOR<br />

C20 COUNTER TOP 8' 0" 2' 0" 1 GC GC<br />

C21 COUNTER TOP 8' 2" 4' 0" 1 GC GC<br />

C23 COUNTER TOP 3' 0" 2' 0" 1 GC GC<br />

C29 EPOXY ADA DROPIN SINK 1' 2" 10" 1 GC GC / PC<br />

C30 SINK FAUCET 1 GC PC<br />

C33 STAINLESS STEEL PEG 2' 6" 2' 6" 1 GC GC<br />

BOARD<br />

26<br />

1<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

2<br />

C33<br />

C30<br />

C23<br />

C29<br />

C8<br />

E1 C11 C11<br />

<strong>NO</strong>RTH ELEVATION PREP. RM. B211<br />

10'9 1/4"<br />

4<br />

C11<br />

C20<br />

C5 C5 C10<br />

EAST ELEVATION PREP. RM. B211<br />

4'6" 2'6"<br />

SPECIALTY EQUIPMENT SCHEDULE PREP ROOM B211<br />

ITEM # DESCRIPTION SIZE QTY PROVIDED BY INSTALLED BY<br />

E1 DELI REFRIGERATOR 52" X 32" X 78" 1 COLLEGE GC<br />

E7 DISH WASHER 24" x 24" x 35" 1 COLLEGE GC/ PC/ EC<br />

E14 ICE MAKER 32" X 28" 1 COLLEGE GC/ PC<br />

E15 BENCH TOP INCUBATOR 24" X 26" X 40" 1 COLLEGE GC<br />

E16 DRYING OVEN 30"X22"X32" 1 COLLEGE GC<br />

E18 BRACKET MOUNTED FIRE 2'6" 1 GC GC<br />

EXTINGUISHER<br />

6<br />

SEALS<br />

A406.00<br />

1/4" = 1'0"<br />

A406.00<br />

1/4" = 1'0"<br />

3 2<br />

ELEVATION <strong>NO</strong>TES<br />

B<br />

Biology Lab<br />

B237<br />

C33<br />

C30<br />

C29<br />

Room<br />

B215<br />

E1<br />

Prep. Room<br />

C11<br />

C11<br />

Corridor<br />

I<br />

E1<br />

E16<br />

C21<br />

3'0"<br />

C11<br />

1. FOR DOOR TYPES & SCHEDULE SEE DWG A601<br />

2. FOR FINISH SCHEDULE SEE DWG A701<br />

3. FOR ELECTRICAL DEVICES, SEE ELECTRICAL DRAWINGS<br />

4. FOR CASEWORK AND EQUIPMENT SHOWN SEE SCHEDULE FOR<br />

RESPONSIBLE PROVIDERS AND INSTALLATION PARTIES<br />

5. PROVIDE WALL BLOCKING AS NECESSARY AT ALL INSTALLED<br />

CASEWORK. SEE MANUFACTURER'S SPECIFICATIIONS.<br />

6. FOR GAS, VACUUM AND COMPRESSED AIR UTILITIES TO BE PROVIDED, SEE<br />

PLUMBING DRAWINGS.<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6660 Kissena Boulevard<br />

Flushing NY. 11367<br />

A<br />

Biology Lab<br />

B241<br />

1<br />

A406.00<br />

C8<br />

C23<br />

C2<br />

E7<br />

C13<br />

E14<br />

A406.00 6<br />

C21<br />

5<br />

C11 C11 C11<br />

1/4" = 1'0"<br />

E16<br />

C5<br />

C5<br />

B211<br />

2<br />

A406.00<br />

3<br />

Office<br />

B209<br />

E15<br />

C5<br />

C5<br />

4<br />

C5<br />

C5<br />

C1<br />

C1<br />

C20<br />

C1<br />

C1<br />

C10<br />

C1<br />

E18<br />

ENLARGED PLAN LAB B211<br />

0<br />

C003<br />

2' 4' 8'<br />

J<br />

K<br />

6<br />

A406.00<br />

1 2 3 4 5<br />

C5<br />

C5<br />

ISLAND LAB BENCH @ RM B211<br />

1/4" = 1'0"<br />

E<br />

A<br />

C<br />

D<br />

KEY PLAN<br />

B<br />

1 91312 <strong>ADDENDUM</strong> # 1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

HECTOR ANDRADE<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

ENLARGED<br />

PLAN &<br />

ELEVATIONS<br />

PREP. RM. B211<br />

A406.00<br />

19<br />

of 65<br />

No. 2115419<br />

JAMES HEMMERLY<br />

9/13/2012 12:13:16 PM


ATTACHMENT <strong>NO</strong>. 10<br />

DWG. FP001.00(091312)<br />

SPRINKLER <strong>NO</strong>TES, SYMBOLS AND<br />

ABBREVIATIONS<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

AD<br />

AFF<br />

ATS<br />

CL OR C L<br />

CLG<br />

CONT<br />

CP<br />

DIM<br />

DN<br />

LIST OF ABBREVIATIONS<br />

ACCESS DOOR<br />

ABOVE FINISH FLOOR<br />

AUTOMATIC TRANSFER SWITCH<br />

CENTER LINE<br />

CEILING<br />

CONTINUATION<br />

CONTROL PANEL<br />

DIMENSION<br />

PIPE DOWN THROUGH FLOOR<br />

EXIST SP<br />

LIST OF SYMBOLS<br />

EXISTING SPRINKLER PIPING<br />

NEW SPRINKLER DISTRIBUTION PIPING<br />

PIPE UP OR RISE<br />

PIPE DN OR DROP<br />

CAP<br />

TEST AND DRAIN<br />

SHUT OFF VALVE (BUTTERFLY OR GATE)<br />

NYC SPRINKLER <strong>NO</strong>TES<br />

1. AUTOMATIC SPRINKLER SYSTEM SHALL COMPLY WITH SEC. 903 & APPENDIX Q OF NYC BUILDING CODE & NFPA 13&2002.<br />

2. CONSTRUCTION DOCUMENTS FOR STANDPIPE SYSTEM SHALL CONTAIN PLANS THAT INCLUDE THE INFORMATION AND<br />

DATA LISTED IN SEC. 903.1.2 OF NYC BUILDING CODE.<br />

3. APPROVED AUTOMATIC SPRINKLER SYSTEM IN NEW BUILDINGS AND STRUCTURES SHALL BE PROVIDED ON THE LOCATIONS<br />

DESCRIBED IN SEC. 903.2 OF NYC BUILDING CODE.<br />

4. AUTOMATIC SPRINKLER SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SEC. 903.3.1 THROUGH 903.3.7<br />

OF NYC BUILDING CODE.<br />

5. WHERE THE PROVISIONS OF NYC BUILDING CODE REQUIRE THAT A BUILDING OR PORTION THERE OF BE EQUIPPED THROUGHOUT<br />

WITH AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SEC. 903.3.1.1, SPRINKLER SHALL BE INSTALLED THROUGHOUT<br />

IN ACCORDANCE WITH NFPA 13 AS MODIFIED IN APPENDIX Q EXCEPT AS PROVIDED IN SEC. 903.3.1.1.1 OF NYC BUILDING CODE.<br />

6. AUTOMATIC SPRINKLERS SHALL <strong>NO</strong>T BE REQUIRED IN THE ROOMS OF AREAS WHICH ARE LISTED IN 903.3.1.1.1 OF NYC BUILDING<br />

CODE AS LONG AS AN APPROVED AUTOMATIC FIRE DETECTION SYSTEM IN ACCORDANCE WITH SEC. 907.2 AND AN ALTERNATIVE<br />

EXTINGUISHING SYSTEM IN ACCORDANCE INSTALLED IN ACCORDANCE WITH SEC. 903.3.1 THROUGH WITH SEC. 904.<br />

7. SPRINKLERS SHALL <strong>NO</strong>T BE OMITTED FROM ANY ROOM MERELY BECAUSE IT IS DAMP, OF FIRE&RESISTANCE&RATED CONSTRUCTION<br />

OR CONTAINS ELECTRICAL EQUIPMENT AS PER SEC. 903.3.1.1.1 OF THE NYC BUILDING CODE.<br />

SPECIAL INSPECTIONS<br />

THE FOLLOWING SPECIAL INSPECTIONS REQUIRED IN ACCORDANCE<br />

WITH SECTION 28&132 AND THE APPLICABLE SECTIONS OF<br />

THE BUILDING CODE ARE LISTED IN THE FOLLOWING TABLES:<br />

& FIRE STOPPING BC 1704.25<br />

& SPRINKLER SYSTEMS BC 1704.21<br />

THE CONTRACTOR MUST <strong>NO</strong>TIFY THE ARCHITECT OR<br />

ENGINEER FOR SPECIAL INSPECTION AT LEAST<br />

72 HOURS BEFORE THE SPECIFIC WORK COMMENCES.<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 973&240&1800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

DR<br />

DRAIN<br />

UNION<br />

8. WHERE AUTOMATIC SPRINKLER SYSTEM ARE REQUIRED BY NYC BUILDING CODE, QUICK&RESPONSE OR RESIDENTIAL AUTOMATIC<br />

SPRINKLERS SHALL BE INSTALLED IN THE AREAS LISTED SEC. 903.3.2 OF NYC BUILDING CODE.<br />

t 914&686&7102<br />

C<br />

DROP<br />

DWG<br />

EL<br />

EX OR EXIST<br />

FCVA<br />

FD<br />

FHV<br />

PIPE DROPPING BETWEEN FLOORS<br />

DRAWING<br />

ELEVATION<br />

EXISTING<br />

FLOOR CONTROL VALVE ASSEMBLY<br />

FLOOR DRAIN<br />

FIRE HOSE VALVE<br />

#<br />

SPRINKLER FLOOR CONTROL VALVE ASSEMBLY; FCVA<br />

<strong>NO</strong>DE (SPRINKLER HYDRAULIC CALCULATIONS)<br />

RECESSED PENDANT SPRINKLER HEAD<br />

UPRIGHT SPRINKLER HEAD<br />

POINT OF NEW CONNECTION<br />

9. AUTOMATIC SPRINKLERS SHALL BE INSTALLED WITH DUE REGARD TO OBSTRUCTIONS THAT WILL DELAY ACTIVATION OR OBSTRUCT<br />

THE WATER DISTIBUTION PATTERN, AUTOMATIC SPRINKLERS SHALL BE INSTALLED IN OR UNDER COVERED KIOSKS, DISPLAYS,<br />

BOOTH, CONCESSION STANDS, OR EQUIPMENT THAT EXCEEDS 4 FEET IN WIDTH <strong>NO</strong>T LESS THAN 3 FOOT CLEARANCE SHALL BE<br />

MAINTAINED BETWEEN AUTOMATIC SPRINKLERS AND TOP OF FILES OF COMBUSTIBLE FIBERS SEC. 903.3.3 OF NYC BUILDING CODE.<br />

10. WATER SUPPLIES FOR AUTOMATIC SPRINKLER SYSTEM SHALL COMPLY WITH SEC. 903.3.5 OF NYC BUILDING CODE AND SEC. 903.3.1<br />

THE POTABLE WATER SUPPLY SHALL BE PROTECTED AGAINST BACK FLOW IN ACCORDANCE WITH THE REQUIREMENTS OF<br />

SEC. 903.3.5 THE NYC PLUMBING CODE, AND RULES OF THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION.<br />

11. ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER SYSTEM, PUMPS, TANKS, WATER LEVELS AND<br />

TEMPERATURES, CRITICAL AIR PRESSURES AND WATER&FLOW SWITCHES ON ALL SPRINKLER SYSTEM SHALL BE ELECTRICALLY<br />

SUPERVISED<br />

BY THE FIRE ALARM SYSTEM AS PER SEC. 903.4 OF THE NYC BUILDING CODE.<br />

SPRINKLER SYSTEM INFORMATION<br />

BUILDING OCCUPANCY CLASSIFICATION<br />

GROUP: BUSINESS (CLASSROOMS)<br />

SPRINKLER HEADS<br />

MANUFACTURER: RELIABLE AUTOMATIC SPRINKLER CO.<br />

FIN FL<br />

FP<br />

FSP<br />

FINISHED FLOOR<br />

FIRE PROTECTION<br />

FIRE STANDPIPE<br />

TS<br />

TAMPER SWITCH (OR VALVE)<br />

12. APPROVED SUPERVISED INDICATING CONTROL VALVES SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE RISER<br />

ON EACH FLOOR IN HIGH&RISE BUILDINGS AS PER SEC. 903.4.3 OF THE NYC BUILDING CODE.<br />

13. THE DOCUMENTS OR PORTIONS THERE OF LISTED IN CHAPTER 2 OF NFPA 13&2002 ARE REFERENCED WITHIN NFPA&13<br />

AND SHALL BE CONSIDERED PART OF THE REQUIREMENT OF THIS DOCUMENT.<br />

SPRINKLER MODEL: G4A (BSA 587&75&SA) CONCEALED TYPE<br />

TYPE: CONCEALED QUICK RESPONSE<br />

ORIFICE SIZE: 1/2" TEMPERATURE RATING:<br />

ORDINARY 165° F<br />

INV EL<br />

INVERT ELEVATION<br />

14. OCCUPANCY CLASSIFICATION SHALL COMPLY WITH CHAPTER 5 OF NFPA 13&2002.<br />

SPRINKLER MODEL: GFR (MEA 258&93&E)<br />

B<br />

HVAC<br />

HEATING, VENTILATION & AIR CONDITIONING<br />

MAX<br />

MAXIMUM<br />

MIN<br />

MINIMUM<br />

NTS<br />

<strong>NO</strong>T TO SCALE<br />

OS&Y<br />

OUTSIDE SCREW & YOKE<br />

PLBG<br />

PLUMBING<br />

PSI<br />

POUNDS PER SQUARE INCH<br />

RCV<br />

RISER CONTROL VALVE<br />

RISE<br />

PIPE RISING BETWEEN FLOORS<br />

RM<br />

ROOM<br />

SPEC<br />

SPECIFICATIONS<br />

SPR, SP<br />

SPDR<br />

SB<br />

TS<br />

SPRINKLER<br />

SPRINKLER DRAIN<br />

SLEEVED BEEM CUT.<br />

TAMPER SWITCH<br />

TYP<br />

TYPICAL<br />

UP<br />

PIPE RISING THROUGH FLOOR<br />

V<br />

VICTAULIC<br />

W/ WITH<br />

GENERAL <strong>NO</strong>TES<br />

1. CONTRACTOR SHALL CHECK AND VERIFY THE EXACT LOCATION OF ALL PIPE<br />

PENETRATIONS AND MAKE CERTAIN THERE ARE <strong>NO</strong> OBSTRUCTIONS AND<br />

INTERFERENCES.<br />

2. CONTRACTOR SHALL REFER TO AND COORDINATE WITH<br />

ARCHITECTURAL/STRUCTURAL DRAWINGS AND WORK FOR EXACT LOCATION OF<br />

ALL FIRE PROTECTION PIPING/FHV.<br />

3. ALL PIPES PENETRATED THROUGH WALLS AND FLOORS SHALL BE PROVIDED WITH<br />

REQUIRED OPENINGS, SLEEVES, SEALS AND PACKINGS. REFER TO STRUCTURAL<br />

DRAWINGS FOR CONCRETE PADS.<br />

4. FIRE PROTECTION: REMOVAL AND RECONNECTION OF EXISTING PIPING MUST BE<br />

DONE BY A LICENSED FIRE PROTECTION CONTRACTOR AND FILED WITH DOB<br />

AS THE FIRE PROTECTION WORK TYPE AS PER NYCPC.<br />

5. FIRE PROTECTION DEMOLITION SHALL BE COORDINATED WITH THE PROJECT<br />

MANAGER.<br />

6. CONTRACTOR SHALL COORDINATE ALL SHUTDOWNS WITH COLLEGE OPERATING STAFF<br />

AS PER SPECIFICATION SECTION 211313 (WET PIPE SPRINKLER)<br />

15. PROTECTION REQUIREMENTS FOR COMMODITIES SHALL BE IN ACCORDACNE WITH SEC. 5.6.1.2 OF NFPA 13&2002.<br />

16. REQUIREMENTS FOR CORRECT USE OF SPRINKLER SYSTEM COMPONENTS SHALL COMPLY WITH CHAPTER 6 OF NFPA 13&2002.<br />

17. THE K&FACTOR, RELATIVE DISCHARGE, AND MARKING IDENTIFICATION FOR SPRINKLERS HAVING DIFFERENT OFFICE SIZES SHALL<br />

BE IN ACCORDANCE WITH TABLE 6.2.3.1 OF NFPA 13&2002.<br />

18. LARGE DROP AND ESFR SPRINKLERS SHALL HAVE A MINIMUM <strong>NO</strong>MINAL K&FACTOR OF 11.2 WITH SEC. 6.2.3.5 OF NFPA 13&2002.<br />

19. AUTOMATIC SPRINKLERS SHALL HAVE THEIR FRAME DEFLECTOR COATING MATERIALS, OR LIQUID BULB COLORED<br />

IN ACCORDANCE WITH THE REQUIREMENTS OF TABLE 6.2.5.1 OF NFPA 13&2002.<br />

20. LISTED CORROSION RESISTANT SPRINKLER SHALL BE INSTALLED IN LOCATIONS WHERE CHEMICALS, MOISTURE, OR OTHER<br />

CORROSIVE VAPORS SUFFICIENT TO CAUSE CORROSION OF SUCH DEVICES EXIST WITH SEC. 6.2.6.1 OF NFPA 13&2002.<br />

21. ALL CONTROL, DRUM, AND TEST CONNECTION VALVES SHALL BE PROVIDED WITH PERMANENTLY MARKED WEATHERPROOF<br />

METAL OR ACID PLASTIC IDENTIFICATION SIGNS. SEC. 6.7.4.1 OF NFPA 13&2002.<br />

22. THE MAXIMUM FLOOR AREA OR ANY ONE FLOOR TO BE PROTECTED BY A SINGLE RISER FROM A CONTROL VALVE AND ALARM DEVICE SHALL<br />

COMPLY WITH SEC. 8.2.1 OF NFPA 13&2002.<br />

23. WHERE CIRCUMSTANCES REQUIRE THE USE OF OTHER THAN ORDINARY TEMPERATURE&RATED SPRINKLERS, STANDARD RESPONSE<br />

SPRINKLERS SHALL BE PERMITTED TO BE USED SEC. 8.3.3 OF NFPA 13&2002.<br />

24. WHEN EXISTING LIGHT HAZARD SYSTEMS ARE CONVERTED TO USE QUICK&RESPONSE OR RESIDENTIAL SPRINKLERS ALL SPRINKLERS IN A<br />

COMPARTMENTED SPACE SHALL BE CHANGED. SEC. 8.3.3.4 OF NFPA 13&2002.<br />

25. SPRINKLERS SHALL BE LOCATED, SPACED AND POSITIONED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 8.5 OF NFPA 13&2002.<br />

26. PROTECTION AREAS AND MAXIMUM SPACING FOR EACH HAZARD SHALL COMPLY WITH TABLE B.B.2.2.1 (A) (B) (C) (D) OF NFPA 13&2002.<br />

27. REQUIREMENTS OF STAGES AREA PROTECTION SHALL COMPLY WITH SEC. 8.14.15 OF NFPA 13&2002.<br />

28. DRAIN CONNECTIONS FOR SYSTEMS SUPPLY RISERS SHALL BE SIZED AS SHOWN IN TABLE 8.15.2.4.2 OF APPENDIX Q&NYC BUILDING<br />

CODE.<br />

29. TYPES OF HANGERS SHALL BE IN ACCORDANCE WITH THE REQUIREMENT OF SEC. 9.1 OF NFPA 13&2002.<br />

30. MAXIMUM DISTANCE BETWEEN HANGERS SHALL BE IN COMPLIANCE WITH TABLE 9.2.2.1 OF NFPA 13&2002.<br />

TYPE: UPRIGHT OR PENDENT QUICK RESPONSE<br />

ORIFICE SIZE: 1/2" TEMPERATURE RATING:<br />

ORDINARY 165° F<br />

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY CALCULATED TO<br />

MEET THE FOLLOWING CRITERIA IN ACCORDANCE WITH THE NEW YORK<br />

CITY BUILDING DEPARTMENT AND NFPA STANDARD #13:<br />

OCCUPANCY:<br />

AREA OF APPLICATION:<br />

DENSITY:<br />

COVERAGE PER SPRINKLER:<br />

# OF SPRINKLER CALCULATED:<br />

MINIMUM FLOW FOR ANY SPRINKLER HEAD:<br />

HYDRAULIC CALCULATION RESULTS: SECOND FLOOR<br />

WATER FLOW REQUIRED: 277.30 GPM<br />

REQUIRED PRESSURE: 43.80 PSI<br />

HYDRANT FLOW TEST DATA<br />

LIGHT HAZARD<br />

1,500 SQ. FT.<br />

0.10 GPM/SQ. FT.<br />

VARIES (225 SQ. FT. MAX)<br />

16<br />

15 GPM<br />

LOCATION: 1ST HYDRANT ON MELBOURNE AVENUE WEST OF 150TH STREET<br />

TEST DATE: 8/13/2012 AT 8:50 AM<br />

TEST DATA:<br />

FLOW TEST =1000 GPM<br />

STATIC PRESSURE = 55 PSI<br />

RESIDUAL PRESSURE = 52 PSI<br />

1<br />

SEALS<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

66&60 Kissena Boulevard<br />

Flushing NY. 11367<br />

31. THE WATER SUPPLY FOR SPRINKLERS SHALL BE DETERMINED BY DENSITY/AREA CURVE, FIGURE 11.2.3.1.5 OF NFPA 13&2002.<br />

32. HYDRAULIC DESIGN AREA REDUCTION FOR QUICK RESPONSE SPRINKLERS SHALL COMPLY WITH FIGURE 11.2.3.2.3.1 OF NFPA 13&2002.<br />

APPLICABLE BUILDING CODES<br />

33. TYPE OF SPRINKLER HEAD IN GENERAL STORAGE SHALL COMPLY WITH SEC. 11.2.3.8 OF NFPA 13&2002.<br />

34. MINIMUM OPERATING PRESSURE OF ANY SPRINKLER SHALL BE 7 PSI SEC. 14.4.4.6.1 OF NFPA 13&2002.<br />

35. NUMBER OF WATER SUPPLY FOR SPRINKLER SYSTEM SHALL COMPLY WITH SEC. 15.1.1 OF NFPA 13&2002 AND APPENDIX Q OF NYC BD.<br />

THE FOLLOWING <strong>NO</strong>TES SHALL APPLY THROUGHTOUT:<br />

1. WORK SHALL BE EXECUTED IN FULL COMPLIANCE WITH<br />

THE APPLICABLE PROVISIONS OF ALL LAWS, BY&LAWS, STATUTES,<br />

ORDINANCES, CODES, RULES, REGULATIONS AND LAWFUL<br />

ORDERS OF PUBLIC AUTHORITIES BEARING ON THE<br />

PERFORMANCE AND EXECUTION OF THE WORK.<br />

2. THE WORK SHALL COMPLY WITH THE REQUIREMENTS<br />

OF THE FOLLOWING CODES AND STANDARDS.<br />

A. NEW YORK UNIFORM CONSTRUCTION CODE AND ICC/ANSI 117.1<br />

B.NFPA 13&2002 AND APPENDIX Q OF NYC BD.<br />

1 9.13.12 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

No. 2115419<br />

PAUL USURIELLO<br />

K.ROBINSON<br />

L.MATLICK<br />

SANDRA BENJAMIN<br />

A<br />

C. 2008 BUILDING CODE OF THE CITY OF NEW YORK.<br />

D. FEDERAL STATE / LOCAL AUTHORITIES HAVING JURISDIICTION.<br />

1 2 3 4 5<br />

SHEET TITLE<br />

SPRINKLER<br />

<strong>NO</strong>TES<br />

SYMBOLS AND<br />

ABBREVIATIONS<br />

FP&001.00<br />

25<br />

of 65<br />

9/13/2012 9:56:14 AM


ATTACHMENT <strong>NO</strong>. 11<br />

DWG. FP101.00(091312)<br />

SECOND FLOOR PLAN FIRE PROTECTION<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

D<br />

14 13' 13 12<br />

11 10 10' 9 8 7' 7 6<br />

AREA OF APPLICATION<br />

.10GPM / 1500SQ FT.<br />

LIGHT HAZARD<br />

MOST REMOTE AREA<br />

1 2<br />

Biology Lab<br />

B237<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

20<br />

1 1/4" SPR<br />

21<br />

31<br />

5 4 3 2<br />

22<br />

23<br />

4" SPR<br />

2" SPR<br />

1<br />

4 3<br />

1 1/4" SPR<br />

1 1/2" SPR<br />

10 9<br />

1 1/4" SPR<br />

8<br />

PHYSICS<br />

B215<br />

13' # 4 3/32"<br />

1 1/4" SPR<br />

7<br />

H<br />

I<br />

<strong>STV</strong><br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

1 1/4" SPR<br />

5 6<br />

1 1/4" SPR<br />

11 12<br />

35<br />

1 1/4" SPR<br />

Biology Lab<br />

B241<br />

24<br />

4" SPR<br />

2" SPR<br />

4" SPR<br />

16 1 1/2" SPR 15<br />

34<br />

30 29<br />

33<br />

28<br />

1 1/4" SPR<br />

14<br />

32<br />

Preparation room<br />

B211<br />

1 1/4" SPR<br />

13<br />

12' # 0"<br />

J<br />

K<br />

t 973#240#1800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 914#686#7102<br />

1 1/4" SPR 1 1/4" SPR 1 1/4" SPR 1 1/4" SPR<br />

C<br />

Office<br />

B209<br />

Corridor<br />

C003<br />

L<br />

Corridor<br />

C001<br />

1 1/4" SPR 1 1/4" SPR<br />

4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

Office<br />

B207<br />

1 1/4" SPR<br />

Biology Lab<br />

B243<br />

1 1/4" SPR<br />

4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

M<br />

M'<br />

1 1/4" SPR<br />

Preparation room<br />

B203<br />

N<br />

SEALS<br />

4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

Biology Lab<br />

1 1/4" SPR<br />

O<br />

1 1/4" SPR<br />

B245<br />

1 1/4" SPR<br />

4" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

O'<br />

B<br />

24A<br />

24A<br />

4" SPR<br />

P<br />

PROJECT IDENTIFICATION<br />

4" SPR<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

4" SPR<br />

4"SPR.DN.<br />

Q<br />

QUEENS COLLEGE<br />

66#60 Kissena Boulevard<br />

Flushing NY. 11367<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

25<br />

25<br />

3" SPR<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

1 9.13.12 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

A<br />

Biology Lab<br />

D231<br />

1 1/4" SPR<br />

1 1/4" SPR<br />

3" SPR<br />

1 1/4" SPR<br />

3" SPR<br />

R<br />

S<br />

E<br />

A<br />

C<br />

B<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

SHEET TITLE<br />

No. 2115419<br />

PAUL USURIELLO<br />

K.ROBINSON<br />

L.MATLICK<br />

SANDRA BENJAMIN<br />

FIRE PROTECTION SECOND<br />

FLOOR PLAN<br />

1/8" = 1'#0"<br />

8'<br />

1 2 3 4 5<br />

1 1/4" SPR<br />

Prep. Room<br />

D231A<br />

1 1/4" SPR<br />

T<br />

D<br />

KEY PLAN<br />

SECOND FLOOR<br />

PLAN FIRE<br />

PROTECTION<br />

FP#101.00<br />

9/13/2012 9:15:42 AM


ATTACHMENT <strong>NO</strong>. 12<br />

DWG. P001.00(091312)<br />

PLUMBING <strong>NO</strong>TES, SYMBOLS AND<br />

ABBREVIATIONS<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

D<br />

<strong>STV</strong><br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ADA<br />

AFF<br />

CL OR CL<br />

CLG<br />

CO<br />

CONT<br />

LIST OF ABBREVIATIONS<br />

AMERICAN DISABILITIES ACT<br />

ABOVE FINISH FLOOR<br />

CENTER LINE<br />

CEILING<br />

CLEAN OUT<br />

CONTINUATION<br />

CW<br />

HW<br />

LG<br />

LW<br />

LWV<br />

CA<br />

LIST OF SYMBOLS<br />

COLD WATER CW<br />

HOT WATER HW<br />

LAB GAS LG<br />

LAB WASTE LW<br />

LAB WASTE VENT LWV<br />

COMPRESSED AIR CA<br />

GENERAL <strong>NO</strong>TES<br />

1. ALL GAS, VENT, HOT AND COLD WATER PIPING ARE AT CEILING OR IN<br />

HUNG CEILING, EXCEPT IN PIPE SPACES OR WHERE OTHERWISE<br />

<strong>NO</strong>TED.<br />

2. CONTRACTOR SHALL CHECK AND VERIFY THE EXACT LOCATION OF ALL<br />

PIPE PENETRATIONS AND MAKE CERTAIN THERE ARE <strong>NO</strong> OBSTRUCTIONS<br />

AND INTERFERENCES.<br />

3. CONTRACTOR SHALL REFER TO AND COORDINATE WITH ARCHITECTURAL<br />

DRAWINGS AND WORK FOR EXACT LOCATION OF ALL PLUMBING<br />

FIXTURES.<br />

4. ALL PIPES PENETRATED THROUGH WALLS AND FLOORS SHALL BE<br />

PROVIDED WITH REQUIRED OPENINGS, SLEEVES, SEALS AND PACKINGS.<br />

REFER TO STRUCTURAL DRAWINGS FOR CONCRETE PADS.<br />

BUILDING DEPARTMENT PLUMBING <strong>NO</strong>TES<br />

ALL PLUMBING WORK SHALL MEET THE REQUIREMENTS OF TITLE 28 NEW YORK CITY<br />

PLUMBING CODE (NYCPC) AND NEW YORK CITY FUEL GAS CODE (NYCFC).<br />

1. PROTECTION OF PIPING AS OUTLINED IN SECTION PC 305 SHALL BE PROVIDED<br />

AS REQUIRED.<br />

2. ALL PIPING AND MATERIALS SHALL BE AS DIRECTED IN SECTION PC 605.<br />

3. PIPING JOINTS AND CONNECTIONS SHALL BE AS APPROVED IN SECTION PC 605.<br />

4. CONSTRUCTION, QUANTITIES, DEVICES, FIXTURES, FAUCETS, VALVES AND<br />

FACILITIES FOR THE DISABLED SHALL BE AS OUTLINED IN SECTION PC 404.<br />

5. TRAPS AND CLEA<strong>NO</strong>UTS SHALL BE AS PER SECTION PC 1002 AND PC 708<br />

ACCORDINGLY.<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

C<br />

CU FT<br />

CW<br />

DIA<br />

DIM<br />

DN<br />

DROP (DR)<br />

DWG<br />

DI<br />

DW<br />

EEW<br />

EL<br />

EMS<br />

FD<br />

FIN FL<br />

GPM<br />

HW<br />

CUBIC FEET<br />

COLD WATER<br />

DIAMETER<br />

DIMENSION<br />

PIPE DOWN THRU FLOOR<br />

PIPE DROPPING BETWEEN FLOORS<br />

DRAWING<br />

DEIONIZED WATER<br />

DISH WASHER<br />

EMERGENCY EYE WASH<br />

ELEVATION<br />

EMERGENCY SHOWER<br />

FLOOR DRAIN<br />

FINISHED FLOOR<br />

GALLON PER MINUTE<br />

HOT WATER<br />

VA<br />

FD<br />

VACUUM VA<br />

PIPE UP OR RISE<br />

PIPE DN OR DROP<br />

CAP<br />

CLEA<strong>NO</strong>UT CO<br />

WALL CLEA<strong>NO</strong>UT WCO<br />

EXISTING PIPING<br />

DEMOLITION (EXISTING BE REMOVED)<br />

SHUT OFF VALVE (GATE<br />

OR BUTTERFLY)<br />

CHECK VALVE<br />

STOP SHUTOFF VALVE (BALL )<br />

FLOOR DRAIN FD<br />

POINT OF NEW CONNECTION<br />

POINT OF DISCONNECT<br />

5. PLUMBING: REMOVAL AND RECONNECTION OF SANITARY FIXTURES MUST<br />

BE DONE BY A LICENSED MASTER PLUMBER AND FILED WITH DOB AS<br />

THE PLUMBING WORK TYPE AS PER NYCPC 2008.<br />

6. PLUMBING DEMOLITION SHALL BE COORDINATED BETWEEN BUILDING<br />

FACILITIES, GENERAL CONTRACTOR AND ALL TRADES ON THIS PROJECT.<br />

7. PROVIDE DRAINS AT ALL LOW POINTS<br />

8. PROVIDE VENTS AT ALL HIGH POINTS<br />

9. ALL PLUMBING FIXTURES SHALL BE INSTALLED BY THE PLUMBING<br />

CONTRACTOR. SCIENCE SINKS ARE PROVIDED WITH THE MILL WORK<br />

REFER TO ARCHITECTURAL DRAWINGS FOR THIS FIXTURES.<br />

10. PLUMBING CONTRACTOR SHALL PROVIDE TEMPORARY SERVICE TO KEEP<br />

EQUIPMENT THAT IS <strong>NO</strong>T IN CONTRACT ON LINE. PLUMBING CONTRACTOR<br />

SHALL FIELD VERIFY THE LOCATIONS OF THESE EXISTING EQUIPMENT AND<br />

<strong>NO</strong>TIFY THE COLLEGE PRIOR TO ANY SHUTDOWN OF SYSTEM.<br />

11. IF THE COLLEGE GRANTS SHUTDOWNS ONLY IN OFF HOURS, THERE SHALL BE<br />

<strong>NO</strong> PREMIUM TIME ADDITIONS TO THE CONTRACT.<br />

12. CONTRACTOR SHALL VERIFY THAT ALL RISER CONTROL VALVE FOR DOMESTIC<br />

WATER, GAS, COMPRESSED AIR AND VACUUM PIPING ARE FULLY OPERABLE<br />

PRIOR TO ANY AND ALL RISER SHUT DOWN FOR THE PURPOSE OF DEMOLITION<br />

AND OR NEW WORK. IF RISER CONTROL VALVES CAN<strong>NO</strong>T SHUTOFF AND ISOLATE<br />

THE DESIGNATED RISERS COMPLETELY. THE CONTRACTOR MUST PROVIDE<br />

OPTIONAL PRICE FOR THE REMOVAL AND REPLACEMENT OF EACH VALVE THAT IS<br />

I<strong>NO</strong>PERABLE. THIS SHOULD BE ADDED IN THE BID COST.<br />

PLUMBING DEMOLITION <strong>NO</strong>TES<br />

1. ALL EXISTING SYSTEMS SHALL BE LEFT IN PERFECT WORKING ORDER<br />

UPON COMPLETION OF ALL NEW WORK.<br />

6. CONSTRUCTION AND SPACING OF HANGERS AND SUPPORTS SHALL BE AS<br />

DIRECTED IN SECTION PC 308.<br />

7. WATER SUPPLY SYSTEM, VALVES, TESTS SHALL BE AS DIRECTED IN<br />

CHAPTER 6. VALVES SHALL BE PROVIDED AT RISERS AND ELSEWHERE AS PER<br />

SECTION PC 606.<br />

8. SANITARY DRAINAGE PIPING, SIZING, GRADING AND OFFSETS SHALL BE AS<br />

OUTLINED IN CHAPTER 7.<br />

9. VENT SIZING, GRADING, CONNECTIONS, LOCATIONS AND OFFSETS SHALL BE<br />

AS DIRECTED IN CHAPTER 9.<br />

10. ALL PLUMBING FIXTURES SHALL COMPLY WITH LOCAL LAW 86/2005<br />

GREEN BUILDING STANDARDS OR CHAPTER 4 SECTION PC 401.3 <br />

WATER CONSERVATION.<br />

11. MATERIALS, ASSEMBLIES, FORMS AND METHODS OF CONSTRUCTION SHALL<br />

BE APPROVED BY BOARD OF STANDARDS AND APPEALS OF THE CITY OF<br />

NEW YORK AND CONTRACTOR SHALL PROVIDE OTCR NUMBER OF<br />

SAME PURCHASED AND APPROVED FOR INSTALLATION.<br />

12. CONTRACTOR SHALL RETAIN A LICENSED PROFESSIONAL ENGINEER TO<br />

PERFORM ALL REQUIRED SPECIAL INSPECTIONS. SAME SHALL BE<br />

FILED WITH THE DEPARTMENT OF BUILDING.<br />

13. ALL HOT WATER PIPING TO BE PROVIDED WITH 1 INCH INSULATION<br />

14. GAS PIPING, MATERIAL, SIZING, OFFSET AND INSTALLATION SHALL<br />

BE AS OUTLINED IN THE NYC FUEL GAS CODE<br />

SEALS<br />

B<br />

IM<br />

IW<br />

LG<br />

LV<br />

LW<br />

ICE MAKER<br />

INDIRECT WASTE<br />

LABORATORY NATURAL GAS<br />

LABORATORY VACUUM<br />

LABORATORY (ACID) WASTE<br />

P<br />

X<br />

1<br />

P<br />

PLBG RISER<br />

DETAIL NUMBER<br />

2. EXACT SIZES AND LOCATIONS OF ALL EXISTING PIPING SHALL BE<br />

VERIFIED ON THE JOB.<br />

3. <strong>NO</strong> REMOVED EXISTING PIPING SHALL BE REUSED UNLESS OTHERWISE<br />

INDICATED.<br />

4. THE CONTRACTOR SHALL SUBMIT TO THE ARCHITECT FOR APPROVAL,<br />

PRIOR TO INSTALLATION, COMPLETE LAYOUT DRAWINGS INDICATING ALL<br />

PIPING SIZING.<br />

5. ALL EXISTING PIPING <strong>NO</strong>T SPECIFICALLY INDICATED TO BE REMOVED<br />

SHALL REMAIN AS IS.<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

LWV<br />

MGCV<br />

MTD<br />

NTS<br />

PLBG<br />

PSI<br />

RISE<br />

RM<br />

S, SAN<br />

ST<br />

TMV<br />

TW<br />

LABORATORY (ACID) WASTE VENT<br />

MASTER GAS CONTROL VALVE<br />

MOUNTED<br />

<strong>NO</strong>T TO SCALE<br />

PLUMBING<br />

POUND SQUARE PER INCH<br />

PIPE RISING BETWEEN FLOORS<br />

ROOM<br />

SANITARY<br />

SEDIMENT TRAP<br />

THERMOSTATIC MIXING VALVE<br />

TEMPERED WATER<br />

6. ANY AND ALL REQUIRED DEMOLITION WORK TO BE PERFORMED ABOVE<br />

EXISTING SUSPENDED CEILINGS AND FURRED OUT WALLS SHALL BE DONE<br />

AT THE TIME WHEN THE EXISTING CEILINGS AND FURRED OUT WALLS ARE<br />

REMOVED BY THE GENERAL CONTRACTOR.<br />

7. ALL EQUIPMENT AND INSTALLATIONS MUST BE EQUAL TO THE STANDARDS<br />

OF THE BASE BUILDING. ANY DEVIATION FROM BUILDING STANDARDS WILL<br />

BE PERMITTED ONLY IF INDICATED OR SPECIFIED ON THESE PLANS AND<br />

SPECIFICATIONS, AND APPROVED.<br />

8. TO ENSURE CONTINUOUS OPERATION, MAKE ALL NECESSARY TEMPORARY<br />

CONNECTIONS BETWEEN NEW AND EXISTING WORK. ALL COSTS<br />

RESULTING FROM TEMPORARY SHUTDOWNS SHALL BE BORNE BY THIS<br />

CONTRACTOR.<br />

9. EXISTING PIPING SHALL BE CUT, REMOVED AND CAPPED AS INDICATED<br />

ON DRAWINGS, UNLESS OTHERWISE <strong>NO</strong>TED.<br />

10. DURING CONSTRUCTION. STANDPIPE SYSTEMS REQUIRED DURING<br />

CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS SHALL BE<br />

PROVIDED IN ACCORDANCE WITH BUILDING CODE OF THE CITY OF NEW<br />

YORK 2008, SECTION 3303.8<br />

11. ALL OPENINGS CREATED AS A RESULT OF THE DEMOLITION WORK SHALL BE<br />

FILLED IN TO MATCH EXISTING CONSTRUCTION BY PLUMBING CONTRACTOR.<br />

1<br />

QUEENS COLLEGE<br />

6660 Kissena Boulevard<br />

Flushing NY. 11367<br />

1 9.13.12 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

2115419<br />

PAUL USURIELLO<br />

K.Robinson<br />

L.Matlick<br />

SANDRA BENJAMIN<br />

A<br />

TYP<br />

TYPICAL<br />

UP<br />

PIPE RISING THRU FLOOR<br />

1 2 3 4 5<br />

SHEET TITLE<br />

PLUMBING<br />

<strong>NO</strong>TES,<br />

SYMBOLS AND<br />

ABBREVIATIONS<br />

P001.00<br />

37<br />

of 65<br />

9/13/2012 9:11:29 AM


ATTACHMENT <strong>NO</strong>. 13<br />

DWG. M101.00(091312)<br />

2 ND FLOOR MECHANICAL DEMOLITION<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

DEMOLITION GENERAL <strong>NO</strong>TES<br />

<strong>STV</strong><br />

D<br />

1<br />

1. COORDINATE ALL DEMOLITION WORK AND ANY NECESSARY<br />

SYSTEM SHUTDOWNS WITH THE GENERAL CONTRACTOR AND<br />

OWNER.<br />

2. ALL EQUIPMENT AND DEVICES <strong>NO</strong>T INDCATED TO BE<br />

DEMOLISHED ARE EXISTING TO REMAIN.<br />

3. ALL OPENINGS CREATED AS A RESULT OF THE DEMOLITION<br />

WORK SHALL BE FILLED&IN TO MATCH EXISTING<br />

CONSTRUCTION BY MECHANICAL CONTRACTOR.<br />

4. ALL WORK ON THIS DRAWING BY MECHANICAL CONTRACTOR,<br />

UNLESS OTHERWISE <strong>NO</strong>TED.<br />

5. DEMOLISH ALL PNEUMATIC TUBING, MECHANICAL CONTROL<br />

PANELS AND ASSOCIATED CONTROL DEVICES WITHIN B237,<br />

B241, B243, B245, B211, B203, D231, D231A.<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 973&240&1800<br />

C<br />

7 6<br />

300 CFM<br />

CORRIDOR<br />

C001<br />

20x5<br />

LAB<br />

B237<br />

LAB<br />

B241<br />

13ø<br />

14ø<br />

13ø<br />

14ø<br />

250 CFM<br />

(TYP FOR 6)<br />

250 CFM<br />

(TYP FOR 6)<br />

5<br />

24X14 UP, 24X12 DN (ETR)<br />

18X16 UP (ETR)<br />

1"ø LPC<br />

1 1/4"ø LPS<br />

12ø<br />

2&1/2" LPS UP, 3" LPS DN (ETR)<br />

3<br />

1&1/2" LPC UP, DN (ETR)<br />

1"ø LPC<br />

1 1/4"ø LPS<br />

3<br />

18X18 UP (ETR)<br />

4<br />

18ø<br />

18x24<br />

16ø<br />

16ø<br />

12ø<br />

1400 CFM<br />

40x18<br />

40x18<br />

1500 CFM<br />

3<br />

3<br />

18x24<br />

3<br />

16x10<br />

120 CFM<br />

PHYSICS<br />

B215<br />

3<br />

PREP RM.<br />

7ø<br />

125 CFM<br />

B211<br />

575 CFM<br />

14ø<br />

10ø<br />

OFFICE<br />

B209<br />

10ø<br />

16x10<br />

2<br />

CORRIDOR<br />

C003<br />

14Ø RETURN AIR DUCT (ETR)<br />

10Ø TRANSFER DUCT (ETR)<br />

1<br />

2 18X18 TRANSFER<br />

DUCT<br />

3<br />

24X36 UP, 24X20 DN (ETR)<br />

H'<br />

H<br />

SUPPLY AIR VAV AND DUCTWORK (ETR)<br />

2 18X18 TRANSFER<br />

DUCT<br />

1<br />

4<br />

20X22 UP, 20X18 DN (ETR)<br />

13Ø RETURN DUCT (ETR)<br />

13Ø TRANSFER DUCT (ETR)<br />

I<br />

J'<br />

J<br />

K<br />

D233<br />

5<br />

4<br />

BIOLOGY LAB<br />

D231<br />

300 CFM<br />

30x6<br />

3<br />

CORRIDOR<br />

C002<br />

350 CFM<br />

(TYP FOR 4)<br />

P<br />

Q<br />

1<br />

2<br />

3<br />

4<br />

DEMOLITION KEY <strong>NO</strong>TES<br />

AIRFLOWS SHOWN IN SPACES (OUTSIDE OF THE PROJECT<br />

AREA) ARE EXISTING QUANTITIES OBTAINED FROM AS&BUILT<br />

DOCUMENTS. PRIOR TO CONSTRUCTION, THE CONTRACTOR<br />

SHALL TAKE AIRFLOW MEASUREMENTS AT EACH INDICATED<br />

LOCATION AND PREPARE A REPORT FOR THE ENGINEER'S<br />

REVIEW BEFORE AND AFTER CONSTRUCTION.<br />

DEMOLISH TRANSFER DUCT AND ASSOCIATED GRILLES. FILL<br />

AND PATCH WALL TO MATCH EXISTING.<br />

PROVIDE TEMPORARY CAP FOR DUCTWORK AND/OR PIPING<br />

AT DISCONNECTION POINT TO PREVENT LEAKAGE FROM<br />

SYSTEM AND TO PROTECT DUCTWORK AND PIPING THAT IS<br />

EXISTING TO REMAIN<br />

CUT AND CAP EXISTING TRANSFER DUCT ON CORRIDOR SIDE<br />

OF LAB PREP ROOM WALL. FILL AND PATCH WALL TO<br />

MATCH EXISTING.<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 914&686&7102<br />

SEALS<br />

B<br />

A<br />

7'<br />

300 CFM<br />

20x5<br />

LAB<br />

B243<br />

LAB<br />

B245<br />

250 CFM<br />

(TYP FOR 6)<br />

14ø<br />

14ø<br />

1 1/4"ø LPS<br />

6" LPS UP, 8" LPS DN (ETR)<br />

4" LPC UP, DN (ETR)<br />

250 CFM<br />

(TYP FOR 6)<br />

13ø<br />

13ø<br />

1"ø LPC<br />

18X20 UP, 18X10 DN (ETR)<br />

3<br />

3<br />

3<br />

3<br />

1"ø LPC<br />

1 1/4"ø LPS<br />

12ø<br />

18ø<br />

18x24<br />

16ø<br />

16ø<br />

1200 CFM<br />

40x18<br />

40x18<br />

1200 CFM<br />

2ND FL. AREA B & DEMO PLAN<br />

1/8" = 1'&0"<br />

12ø<br />

8ø<br />

18x24<br />

12ø<br />

3<br />

OFFICE<br />

B207<br />

PREP RM.<br />

12ø<br />

450 CFM<br />

720 CFM<br />

B203<br />

7ø<br />

120 CFM<br />

28X36 UP, 20X36 DN (ETR)<br />

SUPPLY AIR VAV AND<br />

DUCTWORK (ETR)<br />

16ø<br />

390 CFM<br />

OFFICE<br />

B201<br />

120 CFM<br />

14X14 UP, 14X12 DN (ETR)<br />

12ø<br />

12ø<br />

16x10<br />

RETURN AIR DUCT AND REGISTER (ETR)<br />

1<br />

2 18X18 TRANSFER<br />

DUCT<br />

2<br />

L<br />

M<br />

M'<br />

N<br />

EXISTING MECHANICAL CONNECTIONS TO<br />

EXISTING FUME HOOD TO BE REMOVED<br />

BY MECHANICAL CONTRACTOR<br />

2<br />

30X6 TRANSFER<br />

DUCT<br />

30X6 TRANSFER<br />

DUCT<br />

2 18X18 TRANSFER<br />

DUCT<br />

1<br />

3<br />

4<br />

13Ø TRANSFER DUCT (ETR)<br />

O<br />

O'<br />

P'<br />

P<br />

EXISTING MECHANICAL CONNECTIONS TO<br />

EXISTING FUME HOOD TO BE REMOVED<br />

BY MECHANICAL CONTRACTOR<br />

3<br />

12ø<br />

16X18 UP, DN (ETR)<br />

30X25 UP (ETR)<br />

20ø<br />

14ø<br />

34x16<br />

40x10<br />

17ø<br />

12ø<br />

3 3<br />

D223<br />

14ø<br />

34x16<br />

PREP RM<br />

D231A<br />

1 1/4"ø LPS<br />

1"ø LPC<br />

3<br />

R<br />

S<br />

T<br />

2&1/2" LPS UP, 3" LPS DN (ETR)<br />

1&1/2" LPC UP, DN (ETR)<br />

10X32 UP, 10X22 DN (ETR)<br />

20X44 UP, 20X20 DN (ETR)<br />

2ND FL. AREA D & DEMO PLAN<br />

1 2 3 4 5<br />

1/8" = 1'&0"<br />

1<br />

E<br />

A<br />

C<br />

D<br />

KEY PLAN<br />

B<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

66&60 Kissena Boulevard<br />

Flushing NY. 11367<br />

1 9&13&12 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

JOHN NADON<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

2ND FLOOR<br />

MECHANICAL &<br />

DEMOLITION<br />

M&101.00<br />

43<br />

of 65<br />

2115419<br />

FRANK TIER<strong>NO</strong><br />

9/12/2012 11:25:03 AM


ATTACHMENT <strong>NO</strong>. 14<br />

DWG. E001.00(091312)<br />

ELECTRICAL SYMBOL LIST, ABBREVIATIONS AND<br />

<strong>NO</strong>TES<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

SYMBOL<br />

J J<br />

a<br />

D<br />

J<br />

SYMBOL LIST<br />

JUNCTION/SPLICE BOX, SIZE AS REQUIRED.<br />

DESCRIPTION<br />

LIGHTING AND POWER PANELBOARD, RECESSED MOUNTED IN WALL.<br />

SINGLE POLE TOGGLE SWITCH. SUBSCRIPT DE<strong>NO</strong>TES FIXTURES CONTROLLED/RECEPTACLES<br />

CONTROLLED SHOWN ON POWER PLANS. '3' INDICATES THREE!WAY SWITCH. 'D' INDICATES<br />

DIMMER SWITCH. 'OC' INDICATES OCCUPANCY SENSOR.<br />

LOWER CASE LETTERS INDICATE SWITCH DESIGNATION.<br />

DUPLEX THREE WIRE GROUNDED RECEPTACLE, 20A, 125V.<br />

"GFI" INDICATES GROUND FAULT INTERRUPTING TYPE.<br />

QUAD RECEPTACLE, THREE WIRE GROUNDED 20A, 125V.<br />

SIMPLEX RECEPTACLE, THREE WIRE GROUNDED 20A, 125V.<br />

SYMBOL<br />

AP<br />

W<br />

C<br />

TELECOM SYMBOL LIST<br />

DESCRIPTION<br />

WALL MOUNTED TELEPHONE OUTLET FOR STANDARD WALL INSTRUMENT, WITH SINGLE JACK<br />

INSTALLED IN METAL LOCK BOX. CAT 6 CABLES. MOUNT AT 4'!0" A.F.F., U.O.N.<br />

SURFACE MOUNTED DATA OUTLET WITH DUPLEX JACK LABELED "DATA", MOUNTED AT 18" A.F.F. IN WALL,<br />

SURFACE RACEWAY, OR ON PEDESTAL. CAT 6 CABLES.<br />

SINGLE DATA JACK FOR WIRELESS ACCESS POINT DEVICE MOUNTED ABOVE CEILING<br />

WIDE ANGLE PASSIVE INFRARED MOTION DETECTOR WITH GUARD.<br />

CLOCK, MOUNTED AT 7'!6". PROVIDE CLOCK OF SAME TYPE AS EXISTING SYSTEM, AND FULLY COMPATIBLE.<br />

GENERAL <strong>NO</strong>TES<br />

1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH REQUIREMENTS OF RELEVANT<br />

SPECIFICATIONS AND CODES.<br />

2. INSTALLATION OF ELECTRICAL DEVICES INCLUDING RACEWAYS AND JUNCTION BOXES ARE<br />

SHOWN DIAGRAMMATICALLY. COORDINATE ALL WORK WITH OTHER TRADES TO AVOID<br />

INTERFERENCE.<br />

3. ALL WORK SHOWN ON ELECTRICAL DRAWINGS IS THE RESPONSIBILITY OF THE ELECTRICAL<br />

CONTRACTOR, UNLESS OTHERWISE <strong>NO</strong>TED.<br />

4. COORDINATE WITH OTHER TRADES FOR EXACT LOCATIONS OF MOTORS AND EQUIPMENT, IN<br />

ORDER TO AVOID INTERFERENCE.<br />

5. CONDUIT HOMERUNS <strong>NO</strong>T OTHERWISE MARKED SHALL BE CONSIDERED 2#12 AND 1#12 GROUND<br />

IN 3/4" MINIMUM CONDUIT.<br />

6. CONTRACTOR SHALL COORDINATE ALL RECEPTACLE MOUNTING HEIGHTS WITH APPROVED<br />

CASEWORK SHOP DRAWINGS PRIOR TO INSTALLATION OF AFFECTED RECEPTACLES.<br />

7. THIS CONTRACTOR SHALL FURNISH, INSTALL AND SIZE ALL SLEEVES, HOLES, CORES, PATCHING,<br />

SLOTS, ANCHORS, BRACKETS, SUPPORTS, JUNCTION BOXES, PULL BOXES, AND OTHER<br />

APPURTENANCES NECESSARY TO EXECUTE THE CONTRACT DOCUMENTS COMPLETELY. SOME OF<br />

THESE ITEMS MAY BE SHOWN ON THE DRAWINGS FOR CLARITY OR DESIGN PREFERENCE.<br />

HOWEVER, <strong>NO</strong>T ALL OF THE ITEMS NECESSARY FOR COMPLETE EXECUTION AND INSTALLATION<br />

ARE SHOWN.<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 973!240!1800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 914!686!7102<br />

C<br />

OS<br />

PP<br />

CR<br />

G<br />

DC<br />

DESIGNATION<br />

R<br />

SURFACE MOUNTED PEDESTAL<br />

WALL MOUNTED SURFACE RECEPTACLE/DATA DUAL RACEWAY.<br />

MANUFACTURED BY WIREMOLD CO. MODEL# WIREMOLD V!4000 OR EQUAL.<br />

RACEWAY HOUSES 10!20 AMP. DUPLEX RECEPTACLES, TWO (2) DATA<br />

JACKS<br />

LOW VOLTAGE DUAL TECH<strong>NO</strong>LOGY (PASSIVE INFRARED AND ULTRASONIC)<br />

OCCUPANCY SENSOR, CEILING MOUNTED, RECTANGULAR PATTERN COVERAGE.<br />

POWER PACK WORKING IN CONJUNCTION WITH LOW VOLTAGE OCCUPANCY SENSORS.<br />

CARD READER. MOUNT AT 3'!6" A.F.F.<br />

GAS SHUT OFF SWITCH. MOUNT AT 5'!0" A.F.F.<br />

DOOR CONTACT<br />

DESIGNATIONS FOR DEMO PLANS<br />

DESCRIPTION<br />

SYMBOL WITH SUBSCRIPT "R" INDICATES EXISTING DEVICE TO BE REMOVED.<br />

APPLICABLE CODES<br />

1. 2008 NEW YORK CITY BUILDING CODE<br />

2. 2011 NEW YORK CITY ELECTRICAL CODE<br />

3. AMERICANS WITH DISABILITIES ACT (ADA)<br />

4. NATIONAL FIRE PROTECTION ASSOCIATION (N.F.P.A. 72)<br />

5. FEDERAL STATE / LOCAL AUTHORITIES HAVING JURISDICTION<br />

ABBREVIATIONS<br />

A, AMP<br />

A.F.F.<br />

A.I.C.<br />

AWG<br />

C<br />

CB<br />

CM<br />

DWG<br />

ELEC<br />

E.C.<br />

EM<br />

FD<br />

FSD<br />

G, GND<br />

G.C.<br />

GFI<br />

J, JB<br />

LTG<br />

MIN<br />

MTD<br />

NTS<br />

P<br />

PH<br />

PNL<br />

PP<br />

TYP<br />

U.O.N.<br />

V<br />

VA<br />

AMPERES<br />

ABOVE FINISHED FLOOR<br />

AMPERE INTERRUPTING CAPACITY<br />

AMERICAN WIRE GAUGE<br />

CONDUIT<br />

CIRCUIT BREAKER<br />

CONSTRUCTION MANAGER<br />

DRAWING<br />

ELECTRICAL (EQUIPMENT OR WIRING)<br />

ELECTRICAL CONTRACTOR<br />

EMERGENCY<br />

FIRE DAMPER<br />

FIRE SMOKE DAMPER<br />

GROUND<br />

GENERAL CONTRACTOR<br />

GROUND FAULT INTERRUPTER<br />

JUNCTION BOX<br />

LIGHTING<br />

MINIMUM<br />

MOUNTED<br />

<strong>NO</strong>T TO SCALE<br />

POLE<br />

PHASE<br />

PANEL<br />

POWER PANEL<br />

TYPICAL<br />

UNLESS OTHERWISE <strong>NO</strong>TED<br />

VOLTS<br />

VOLT AMPERES<br />

8. MINIMIZE THE VISUAL IMPACT OF EXPOSED RACEWAYS AND CONDUITS BY CAREFUL SELECTION<br />

OF ROUTING. SELECT THE ROUTING IN CONCERT WITH THE ARCHITECTURAL DESIGN OF THE<br />

BUILDING.<br />

9. UNLESS OTHERWISE <strong>NO</strong>TED ON FLOOR PLANS OR IN FLOOR PLAN <strong>NO</strong>TES, SWITCHES SHALL BE<br />

INSTALLED AT 4'!0" ABOVE FINISHED FLOOR.<br />

10. APPLICABLE CODES:<br />

• AMERICANS WITH DISABILITIES ACT (ADA)<br />

• 2008 NEW YORK CITY BUILDING CODE<br />

• 2011 NEW YORK CITY ELECTRICAL CODE<br />

11. CONTRACTOR SHALL PROVIDE ANY TEMPORARY LIGHTING AND POWER REQUIRED DURING THE<br />

COURSE OF CONSTRUCTION. ALL 15, 20 AND 30 AMP RECEPTACLES USED FOR CONSTRUCTION<br />

SHALL HAVE GFCI PROTECTION. ALL TEMPORARY WIRING SHALL COMPLY WITH NEC ARTICLE 590.<br />

12. UNLESS OTHERWISE INDICATED, ALL MOUNTING ELEVATIONS ARE CENTERLINE ELEVATIONS.<br />

REMOVAL <strong>NO</strong>TES<br />

1. EXISTING CONDITIONS INDICATED ON THE CONTRACT DRAWINGS ARE BASED ON FIELD<br />

OBSERVATIONS AND EXISTING RECORD DRAWINGS. VERIFY EXISTING CONDITIONS IN THE FIELD.<br />

2. <strong>NO</strong>TES AND GRAPHICAL REPRESENTATIONS ON THE CONTRACT DRAWINGS SHALL <strong>NO</strong>T LIMIT THE<br />

EXTENT OF REMOVALS REQUIRED. PERFORM REMOVALS NECESSARY TO ACHIEVE THE DESIGN<br />

INTENT. COORDINATE THE EXTENT OF REMOVALS WITH THE OTHER TRADES.<br />

3. FOR EQUIPMENT AND WIRING DEVICES THAT WILL BE REMOVED, DEENERGIZE AND DISCONNECT.<br />

REMOVE CONDUITS AND WIRING BACK TO THE SOURCE, U.O.N.<br />

4. UNLESS OTHERWISE INDICATED, EXISTING SERVICES, SYSTEMS, AND WIRING SERVING EXISTING<br />

AREAS OUTSIDE OF THE AREA OF CONSTRUCTION SHALL REMAIN OR SHALL BE RELOCATED AS<br />

REQUIRED TO MAINTAIN OPERATION OF EXISTING SYSTEMS AND AVOID CONFLICT WITH<br />

CONSTRUCTION.<br />

5. WHERE EQUIPMENT AND WIRING ARE REQUIRED TO REMAIN IN SERVICE, BUT INTERFERE WITH<br />

THE ALTERATIONS, RELOCATE AND RECONNECT USING MATERIALS AND STANDARDS OF THIS<br />

CONTRACT.<br />

SEALS<br />

ETR<br />

SYMBOL WITH SUBSCRIPT 'ETR' INDICATES EXISTING DEVICE TO REMAIN.<br />

6. USE CAUTION TO PREVENT DAMAGE TO ARCHITECTURAL SURFACES AND MATERIALS THAT ARE<br />

TO REMAIN. REPAIR OR REPLACE DAMAGED ITEMS.<br />

B<br />

RL<br />

SYMBOL WITH SUBSCRIPT 'RL' INDICATES EXISTING DEVICE TO BE RELOCATED.<br />

7. UNLESS OTHERWISE INDICATED, TAKE REMOVED MATERIALS FROM THE SITE AND DISPOSE OF IN<br />

ACCORDANCE WITH APPLICABLE LAWS AND ENVIRONMENTAL REGULATIONS.<br />

8. ALL OPENINGS CREATED AS A RESULT OF THE DEMOLITION WORK SHALL BE FILLED IN TO MATCH<br />

EXISTING CONSTRUCTION BY ELECTRICAL CONTRACTOR.<br />

1<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

65!30 Kissena Boulevard<br />

Flushing NY. 11367<br />

LIGHTING FIXTURE SCHEDULE<br />

TYPE DESCRIPTION MANUFACTURER CATALOG NUMBER VOLTAGE VOLT!AMPS<br />

A<br />

B<br />

C<br />

1'x4' LED RECESSED EPOC FULL<br />

DISTRUBITION LUMINAIRE<br />

SUSPENDED 96" T8 FLUORESCENT<br />

LUMINAIRE WITH LINEAR PRISMATIC LENS<br />

LED EXIT SIGN WITH EMERGENCY<br />

BATTERY<br />

COLUMBIA<br />

LIGHTING<br />

LIGHTOLIER<br />

LIGHTING<br />

LEPC14!35!22!G!LL!ED!U PROVIDE EMERGENCY<br />

BATTERY PACK FOR EM FIXTURES<br />

EYS8LFX232120H4 PROVIDE EMERGENCY<br />

BATTERY PACK FOR EM FIXTURES<br />

120 V 43 VA<br />

120 V 128 VA<br />

ENCORE LIGHTING LPE!R1!DG 120 V 3 VA<br />

1 9!13!12 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

ISSUE BLOCK<br />

COLOR TEMPERATURE OF NEW FLUORESCENT LIGHT FIXTURES SHALL MATCH COLOR TEMPERATURE OF EXISTING FIXTURES.<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

2115419<br />

PAUL USURIELLO<br />

STEPHANIE AMOH<br />

JOHN HANNAH<br />

SANDRA BENJAMIN<br />

A<br />

1 2 3 4 5<br />

SHEET TITLE<br />

ELECTRICAL<br />

SYMBOL LIST,<br />

ABBREVIATIONS,<br />

AND <strong>NO</strong>TES<br />

E!001.00<br />

54<br />

of 65<br />

9/13/2012 12:40:15 PM


ATTACHMENT <strong>NO</strong>. 15<br />

DWG. E100.00(091312)<br />

2 ND FLOOR LIGHTING PART PLANS DEMO<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


3<br />

1<br />

2 3 4 5<br />

D<br />

GENERAL <strong>NO</strong>TES<br />

1. FOR GENERAL <strong>NO</strong>TES, REMOVAL <strong>NO</strong>TES, SYMBOL LIST, AND ABBREVIATIONS, SEE DRAWING<br />

E+001.<br />

2. REMOVE AND PROPERLY DISPOSE OF SWITCHES SCHEDULED TO BE REMOVED. REMOVE ALL<br />

EXISTING LIGHTING FIXTURES AND FLUORESCENT BULBS SCHEDULED TO BE REMOVED, AND<br />

COORDINATE FOR GENERAL CONTRACTOR TO DISPOSE AS UNIVERSAL WASTE.<br />

3. REMOVE ASSOCIATED CONDUIT AND BRANCH CIRCUIT WIRING BACK TO THE SUPPLYING<br />

PANEL(S), U.O.N.<br />

4. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH<br />

RE<strong>NO</strong>VATED AREAS SERVICING UNDISTURBED AREAS.<br />

5. ALL WORK SHOWN ON THIS DRAWING IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR,<br />

U.O.N.<br />

<strong>STV</strong><br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 973+240+1800<br />

6<br />

5<br />

4<br />

3<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 914+686+7102<br />

EXISTING PENDANT<br />

MOUNTED FLUORESCENT<br />

TO BE REMOVED.<br />

(TYPICAL)<br />

H'<br />

C<br />

H<br />

R<br />

R<br />

G<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

LAB<br />

B237<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

PREP RM.<br />

B211<br />

I<br />

J'<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

LAB<br />

B241<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

1<br />

R<br />

J<br />

K<br />

5<br />

4<br />

3<br />

SEALS<br />

B<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

LAB<br />

B243<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

1<br />

PREP RM.<br />

B203<br />

L<br />

M<br />

M'<br />

N<br />

OC<br />

1<br />

R<br />

R<br />

R<br />

R<br />

Lab<br />

D231<br />

R<br />

R<br />

R<br />

R<br />

R<br />

EXISTING PENDANT<br />

MOUNTED FLUORESCENT<br />

TO BE REMOVED.<br />

(TYPICAL)<br />

Q<br />

R<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

65+30 Kissena Boulevard<br />

Flushing NY. 11367<br />

A<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

LAB<br />

R<br />

B245<br />

2ND FLOOR + AREA B LIGHTING<br />

DEMO PLAN<br />

1/8" = 1'+0"<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

1<br />

R<br />

R<br />

R<br />

O<br />

O'<br />

P'<br />

P<br />

1 2 3 4 5<br />

1/8" = 1'+0"<br />

OC<br />

R<br />

R<br />

R<br />

R<br />

R<br />

1<br />

R<br />

R<br />

R<br />

R<br />

Prep Room<br />

D231A<br />

2ND FLOOR + AREA D LIGHTING<br />

DEMO PLAN<br />

S<br />

E<br />

A<br />

C<br />

D<br />

KEY PLAN<br />

B<br />

1 9+13+12 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

STEPHANIE AMOH<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

2ND FLOOR<br />

LIGHTING PART<br />

PLANS + DEMO<br />

E+100.00<br />

55<br />

of 65<br />

2115419<br />

JOHN HANNAH<br />

9/13/2012 12:40:16 PM


ATTACHMENT <strong>NO</strong>. 16<br />

DWG. E110.00(091312)<br />

2 ND FLOOR POWER & LOW VOLTAGE<br />

PART PLANS DEMO<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

6<br />

5<br />

4<br />

3<br />

GENERAL <strong>NO</strong>TES<br />

1. FOR GENERAL <strong>NO</strong>TES, REMOVAL <strong>NO</strong>TES, SYMBOL LIST, AND ABBREVIATIONS, SEE DRAWING<br />

E001.<br />

2. FOR RISER DIAGRAM, SEE DRAWING E600.<br />

3. REMOVE ASSOCIATED CONDUIT AND BRANCH CIRCUIT WIRING BACK TO THE SUPPLYING<br />

PANEL(S), U.O.N.<br />

1<br />

4. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH<br />

RE<strong>NO</strong>VATED AREAS SERVICING UNDISTURBED AREAS.<br />

5. EXISTING FUME HOOD TO BE REMOVED BY GC. EXISTING ELECTRICAL CONNECTION TO BE<br />

REMOVED BY EC.<br />

6. ALL WORK SHOWN ON THIS DRAWING IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR,<br />

U.O.N.<br />

7. DISCONNECT AND REMOVE AIR VALVE CONTROLS AND ASSOCIATED ELECTRICAL DEVICES. TURN<br />

OVER TO QUEENS COLLEGE FOR REUSE.<br />

8. EXISTING MECHANICAL EQUIPMENT TO REMAIN SHALL BE DISCONNECTED FROM EXISTING<br />

POWER PANELS AND RECONNECTED TO NEW PANELS. REUSE EXISTING WIRING TO CIRCUIT TO<br />

NEW PANELS.<br />

9. REMOVE EXISTING WALL MOUNTED IDF RACKS AND WIRELESS ACCESS POINTS IN LABS AND PREP<br />

ROOMS. TURN OVER TO QUEENS COLLEGE FOR REUSE.<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

C<br />

B<br />

A<br />

?<br />

RELOCATE CONDUIT<br />

TO ACCOMMODATE<br />

NEW CASEWORK.<br />

1<br />

1/8" = 1'0"<br />

W<br />

G<br />

W<br />

W<br />

R<br />

1<br />

W<br />

RL<br />

RL<br />

RL<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

RL R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

1<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

1<br />

R<br />

C<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R R<br />

LAB<br />

R<br />

R<br />

R<br />

B237<br />

R<br />

R<br />

ETR<br />

R<br />

ETR<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

1 1 LAB 1<br />

R<br />

1<br />

R<br />

B241<br />

LAB<br />

B243<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

RL<br />

1 1 LAB 1<br />

B245<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

ETR<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

SEE <strong>NO</strong>TE 12<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

ETR R R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

R<br />

J<br />

J<br />

R<br />

AP2N<br />

R<br />

ETR<br />

AP2P<br />

2ND FLOOR AREA B POWER<br />

AND LOW VOLTAGE DEMO PLAN<br />

1<br />

1<br />

ETR<br />

R<br />

AP2R<br />

R<br />

R<br />

R<br />

AP2Q<br />

R<br />

ETR<br />

ETR<br />

ETR<br />

R R R R<br />

R<br />

PROJECTOR<br />

ETR<br />

J<br />

220V<br />

RECEPTACLE<br />

R<br />

1<br />

R R R<br />

PREP RM.<br />

ETR<br />

B211<br />

J<br />

R<br />

SEE <strong>NO</strong>TE 5<br />

R<br />

SEE <strong>NO</strong>TE 10<br />

PREP RM.<br />

ETR<br />

1<br />

B203<br />

R R R R R<br />

ETR<br />

ETR<br />

ETR<br />

ETR<br />

ETR<br />

ETR<br />

ETR<br />

H'<br />

H<br />

I<br />

J'<br />

J<br />

K<br />

L<br />

M<br />

M'<br />

N<br />

O<br />

O'<br />

P'<br />

P<br />

5 4 3<br />

ETR<br />

ETR<br />

ETR<br />

ETR<br />

ETR<br />

J<br />

R<br />

R<br />

R<br />

R<br />

R<br />

C<br />

ETR<br />

ETR<br />

SEE <strong>NO</strong>TE 5<br />

R<br />

AP2S R R<br />

1<br />

R<br />

Prep Room<br />

ETR<br />

ETR<br />

R R R R R<br />

R<br />

R R R R R R R R R R R R<br />

Lab<br />

D231<br />

R<br />

R R R R R R R R R R R R<br />

R R R R R R R R R R R R<br />

1 2 3 4 5<br />

D231A<br />

ETR<br />

R<br />

R<br />

ETR<br />

REMOVE ALL<br />

ASSOCIATED<br />

DEVICES AND<br />

WIRING.<br />

2ND FLOOR AREA D POWER<br />

AND LOW VOLTAGE DEMO PLAN<br />

1/8" = 1'0"<br />

1<br />

1<br />

1<br />

1<br />

Q<br />

R<br />

S<br />

10. ALL EXISTING EQUIPMENT FOR PROJECTOR (I.E. PROJECTOR, AV OUTLETS, SPEAKERS,<br />

CONDUITS, ETC.) SHALL BE REMOVED.<br />

11. REMOVE ALL DATA DEVICES AND ASSOCIATED WIRING AND CONDUITS, U.O.N.<br />

12. DISCONNECT AND REMOVE EMERGENCY GAS SHUTOFF EQUIPMENT AND ASSOCIATED<br />

ELECTRICAL DEVICES. TURN OVER TO QUEENS COLLEGE FOR REUSE.<br />

E<br />

A<br />

C<br />

D<br />

KEY PLAN<br />

1<br />

B<br />

PROJECT IDENTIFICATION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

SEALS<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6530 Kissena Boulevard<br />

Flushing NY. 11367<br />

1 91312 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

STEPHANIE AMOH<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

2ND FLOOR<br />

POWER & LOW<br />

VOLTAGE PART<br />

PLANS DEMO<br />

E110.00<br />

56<br />

of 65<br />

2115419<br />

JOHN HANNAH<br />

9/13/2012 12:53:04 PM


ATTACHMENT <strong>NO</strong>. 17<br />

DWG. E130.00(091312)<br />

2 ND FLOOR POWER & LOW VOLTAGE<br />

PART PLANS<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

<strong>STV</strong><br />

D<br />

5<br />

4<br />

3<br />

GENERAL <strong>NO</strong>TES<br />

1. FOR GENERAL <strong>NO</strong>TES, REMOVAL <strong>NO</strong>TES, SYMBOL LIST, AND ABBREVIATIONS, SEE DRAWING<br />

E001.<br />

2. FOR RISER DIAGRAM, SEE DRAWING E600.<br />

3. FOR PANEL SCHEDULES, SEE DRAWINGS E601 AND E602.<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

C<br />

B<br />

SEE <strong>NO</strong>TE 12<br />

SEE <strong>NO</strong>TE 12<br />

CR<br />

CR<br />

CR<br />

J<br />

C<br />

G<br />

W<br />

1 10<br />

J<br />

23<br />

C<br />

G<br />

POWER SUPPLY FOR<br />

DOOR CONTROLLERS.<br />

RL<br />

CONNECT 2 DOORS<br />

PER SUPPLY. J 22<br />

POWER SUPPLY FOR<br />

DOOR CONTROLLERS.<br />

CONNECT 2 DOORS<br />

PER SUPPLY.<br />

SEE <strong>NO</strong>TE 12<br />

W<br />

C<br />

W<br />

1<br />

RL AP<br />

C<br />

23<br />

J<br />

AP<br />

15<br />

W<br />

CR<br />

17<br />

16<br />

Biology Lab<br />

B241<br />

Biology Lab<br />

B245<br />

19<br />

18<br />

21<br />

48"<br />

15 5 9<br />

4<br />

ETR<br />

20<br />

EV4<br />

J<br />

ETR FSD<br />

J 6<br />

FSD<br />

7 J<br />

J<br />

PPB237<br />

J<br />

FSD<br />

10<br />

10 10 10<br />

J 7<br />

42" 42" 42" 42"<br />

EV6<br />

12 15 13 17<br />

1<br />

16 14 11 8 J 9<br />

AP 10<br />

19<br />

42"<br />

J 15 12 17 13 14 16 8 11<br />

SEE <strong>NO</strong>TE 10<br />

1<br />

RHC6 SV6<br />

J SV6B<br />

SEE <strong>NO</strong>TE 10 (TYP)<br />

9<br />

J<br />

9 J<br />

9<br />

12 15 13 17 16 14 11 8<br />

3<br />

SEE <strong>NO</strong>TE 12<br />

FSD<br />

SV5 13<br />

7<br />

SEE <strong>NO</strong>TE 10<br />

J 11 J RHC5 25 J<br />

RL<br />

SV6A SEE <strong>NO</strong>TE 7 (TYP)<br />

11<br />

Biology Lab<br />

9 J<br />

SEE <strong>NO</strong>TE 10<br />

7<br />

B237<br />

J<br />

Preparation room<br />

AP<br />

1<br />

SEE <strong>NO</strong>TE 11<br />

FSD<br />

B211 ETR<br />

42"<br />

5<br />

10<br />

8 8<br />

48"<br />

9<br />

4 2<br />

ETR<br />

FSD<br />

J 12<br />

7 4 7 4<br />

24 J<br />

6 J<br />

SV5A<br />

9<br />

4 J<br />

42" 42" 42" 42"<br />

PPB241<br />

11<br />

ETR<br />

ETR<br />

10 15 1 17 16 19 18 21 20<br />

ETR<br />

3<br />

RHC4<br />

J<br />

AP<br />

J<br />

8 8<br />

9<br />

11 SV4 11<br />

SEE <strong>NO</strong>TE 10<br />

ETR<br />

15 10 16 17 18 19 20<br />

21<br />

EV5 J 11<br />

4<br />

42"<br />

15<br />

42"<br />

GFI GFI GFI GFI GFI<br />

JGFI<br />

4 48" 5<br />

7<br />

7<br />

PPB243<br />

FSD<br />

48"<br />

48"<br />

SEE <strong>NO</strong>TE 11<br />

3<br />

4<br />

4 4 4 ETR J<br />

J<br />

42" 42" 42" 42" 4<br />

AP<br />

11 10 13 12 15 14 6<br />

18<br />

J<br />

1<br />

5<br />

EV3 4<br />

7 42"<br />

17<br />

10 11 12 13 14 15 5 6<br />

J<br />

SV3B<br />

J 7<br />

11<br />

RHC3 J<br />

SV3<br />

7 J<br />

7<br />

SEE <strong>NO</strong>TE 10 SEE <strong>NO</strong>TE 12<br />

1 10 13 12 15 14 6 5<br />

10<br />

FSD J 3<br />

SV2<br />

SEE <strong>NO</strong>TE 12<br />

J 11 RHC2 25 J<br />

J<br />

Biology Lab<br />

11<br />

RL<br />

SV3A J<br />

FD<br />

B243<br />

7<br />

SEE <strong>NO</strong>TE 10<br />

3<br />

J<br />

J<br />

Preparation room 7<br />

J 16 AP<br />

1<br />

2<br />

SEE <strong>NO</strong>TE 11 FSD 42" B203 ETR<br />

8 ETR 2 8<br />

PPB245<br />

48"<br />

12 10 10<br />

48"<br />

ETR<br />

FSD J 6<br />

12<br />

9 15<br />

9 15<br />

J<br />

J 7 3<br />

44"<br />

42" 42" 42" 42"<br />

20 16 14 17 21 19 18 22 24 ETR 8 SV2A<br />

1 1<br />

J 11<br />

J<br />

AP<br />

12<br />

11<br />

RHC1 SV1<br />

J<br />

HEV1 J 11 10 10 44"<br />

11<br />

16 20 17 14 19 21 22 18<br />

SEE <strong>NO</strong>TE 10<br />

12<br />

ETR EV2<br />

ETR<br />

J 12 12<br />

9 11<br />

20 16 14 17 21 19 18 22<br />

ETR<br />

ETR<br />

G<br />

RL<br />

G<br />

SEE <strong>NO</strong>TE 11<br />

18<br />

EV1<br />

11<br />

11<br />

9<br />

ETR<br />

9<br />

ETR<br />

G<br />

G<br />

H<br />

I<br />

J'<br />

J<br />

K<br />

L<br />

M<br />

M'<br />

N<br />

O<br />

O'<br />

P'<br />

P<br />

5<br />

POWER SUPPLY FOR<br />

DOOR CONTROLLER<br />

ETR<br />

5<br />

48" 14<br />

6<br />

14<br />

ETR<br />

6<br />

ETR<br />

ETR<br />

5<br />

FD CR<br />

4 J G<br />

J<br />

C<br />

J<br />

ETR<br />

23<br />

22 ETR 20<br />

13<br />

AP<br />

15<br />

ETR<br />

21 18<br />

J<br />

21<br />

6 EV7<br />

SV7A<br />

9<br />

7 9 J SEE <strong>NO</strong>TE 10 AP<br />

J HEV2<br />

ETR<br />

SEE <strong>NO</strong>TE 10 5<br />

J 9<br />

FSD<br />

J 24<br />

4 J<br />

1<br />

ETR<br />

SEE <strong>NO</strong>TE 11<br />

3 10 1 Prep. Room<br />

12<br />

PPD231 SV7<br />

11 D231A<br />

J 9 J 9<br />

RHC7<br />

J FSD<br />

SEE <strong>NO</strong>TE 10 ETR 12<br />

4<br />

4<br />

19<br />

Biology Lab<br />

D231<br />

17<br />

16<br />

18<br />

SEE <strong>NO</strong>TE 12<br />

ETR<br />

5<br />

17<br />

20<br />

19<br />

16<br />

21<br />

J<br />

FD<br />

4<br />

3<br />

20<br />

42"<br />

17<br />

6<br />

16<br />

42"<br />

15<br />

19<br />

18<br />

42"<br />

1<br />

1<br />

Q<br />

R<br />

S<br />

NEW 4" CONDUIT<br />

6<br />

TELECOM ROOM<br />

B343A<br />

4. LOCATIONS OF ALL EQUIPMENT AND DEVICES ARE APPROXIMATE. CONTRACTOR TO VERIFY<br />

ACTUAL SITE CONDITIONS.<br />

5. RACEWAYS SHALL BE INSTALLED CONCEALED WHERE POSSIBLE. IF EXPOSED RUN IS REQUIRED,<br />

RACEWAYS SHALL BE PAINTED TO MATCH EXISTING FINISH. COORDINATE WITH CM FOR EXPOSED<br />

RUNS.<br />

6. CONNECT NEW DATA OUTLETS TO PATCH PANEL LOCATED IN TELECOM ROOM SBB343A.<br />

7. FIRE DAMPERS AND FIRE SMOKE DAMPERS FURNISHED AND INSTALLED BY MECHANICAL<br />

CONTRACTOR. ELECTRICAL CONTRACTOR SHALL PROVIDE POWER CONNECTION.<br />

8. ALL WORK SHOWN ON THIS DRAWING IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR,<br />

U.O.N.<br />

9. CIRCUIT ROOMS TO PANELBOARDS AS LISTED BELOW:<br />

PP237: LAB B237<br />

PP241: LAB B241, PREP ROOM B211<br />

PP243: LAB B243<br />

PP245: LAB B245, PREP ROOM B203<br />

PP231: LAB D231, PREP ROOM D231A<br />

10. AIR VALVES AND REHEAT COILS ARE PROVIDED BY MECHANICAL CONTRACTOR.<br />

11. SOLE<strong>NO</strong>ID VALVE CONTROLS FURNISHED AND INSTALLED BY PLUMBING CONTRACTOR.<br />

12. LAB CONTROL PANEL AND TRANSFORMER ARE FURNISHED AND INSTALLED BY MECHANICAL<br />

CONTRACTOR. ELECTRICAL CONTRACTOR SHALL PROVIDE POWER CONNECTION. COORDINATE<br />

WITH MECHANICAL CONTRACTOR FOR LOCATIONS.<br />

13. ELECTRICAL CONTRACTOR SHALL PROVIDE WIRING AND CONDUIT FOR POWER CONNECTIONS TO<br />

ALL CONTROL DEVICES INSTALLED BY EITHER PLUMBING OR MECHANICAL CONTRACTOR.<br />

EXISTING IDF RACK<br />

NEW WALL MOUNTED<br />

IDF RACK<br />

NEW CABLE TRAY<br />

EXISTING CABLE TRAY<br />

EXISTING 4" CONDUIT<br />

K<br />

L<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 9732401800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

SEALS<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6530 Kissena Boulevard<br />

Flushing NY. 11367<br />

2ND FLOOR AREA B POWER<br />

AND LOW VOLTAGE PLAN<br />

2ND FLOOR AREA D POWER<br />

AND LOW VOLTAGE PLAN<br />

3RD FLOOR AREA B TELECOM<br />

ROOM PLAN<br />

1 91312 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

ISSUE BLOCK<br />

A<br />

1/8" = 1'0"<br />

1/8" = 1'0"<br />

1 2 3 4 5<br />

1/8" = 1'0"<br />

E<br />

A<br />

C<br />

D<br />

KEY PLAN<br />

B<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

PAUL USURIELLO<br />

STEPHANIE AMOH<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

2ND FLOOR<br />

POWER & LOW<br />

VOLTAGE PART<br />

PLANS<br />

E130.00<br />

58<br />

of 65<br />

2115419<br />

JOHN HANNAH<br />

9/13/2012 12:40:18 PM


ATTACHMENT <strong>NO</strong>. 18<br />

DWG. E500.00(091312)<br />

DETAILS<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

D<br />

<strong>STV</strong><br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

t 973#240#1800<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 914#686#7102<br />

1<br />

C<br />

6" X 6" X 4" DEEP SURFACE<br />

ENCLOSURE WITH SCREW<br />

COVER TO TERMINATE (3) 1"<br />

CONDUITS FROM A / V<br />

FACEPLATE BACKBOX<br />

STRUCTURAL CEILING<br />

TO CAMPUS<br />

NETWORK<br />

TO DEDICATED<br />

120VAC, 20A<br />

A<br />

SA3032 MASTER CONTROLLER<br />

UNIT WITH POWER SUPPLY AND<br />

ENCLOSURE. (1) UNIT CONTROLS<br />

ALL 5 DOORS.<br />

(2) SA3000 DOOR CONTROLLER<br />

BOARDS WITH POWER SUPPLY AND<br />

ENCLOSURE. (ONE CONTROLLER<br />

BOARD PER DOOR)<br />

4" X 4" SURFACE PULLBOX<br />

WITH SCREW COVER<br />

STRUCTURAL CEILING<br />

TELCOM ROOM (B343A)<br />

2" FLEXIBLE CONDUIT<br />

DOUBLE GANG FLUSH<br />

CEILING MOUNTED OUTLET<br />

BOX<br />

(3) 1" EMT CONDUITS FROM<br />

A / V FACEPLATE BACKBOX<br />

HANGER WIRE RIGIDLY ATTACHED TO<br />

STRUCTURAL CEILING. WIRE TO MATCH<br />

CEILING GRID WIRE. (2) WIRES<br />

REQUIRED PER EACH INSTALLATION<br />

LOCATION TYPICAL<br />

HANGER BAR ASSEMBLY<br />

WITH OUTLET BOX RIGIDLY<br />

ATTACHED<br />

A<br />

REX<br />

REQUEST#TO#EXIT<br />

A<br />

ELECTRIC<br />

STRIKE<br />

ELECTRIFIED<br />

HINGE<br />

A<br />

DC<br />

A<br />

B<br />

1" FLEXIBLE<br />

CONDUIT<br />

SINGLE GANG FLUSH<br />

CEILING MOUNTED OUTLET<br />

BOX<br />

(SEE <strong>NO</strong>TES)<br />

1" EMT CONDUIT TO CORRIDOR<br />

CABLE TRAY SYSTEM<br />

HANGER WIRE RIGIDLY ATTACHED TO<br />

STRUCTURAL CEILING. WIRE TO MATCH<br />

CEILING GRID WIRE. (2) WIRES<br />

REQUIRED PER EACH INSTALLATION<br />

LOCATION TYPICAL<br />

HANGER BAR ASSEMBLY WITH OUTLET<br />

BOX RIGIDLY ATTACHED<br />

SEALS<br />

CARD<br />

READER<br />

LAY#IN CEILING<br />

ELECTRIFIED<br />

LOCKSET<br />

LAY#IN CEILING<br />

B<br />

DOUBLE GANG STAINLESS STEEL<br />

COVERPLATE WITH 2" GROMMETED<br />

OPENING<br />

SPACES WITH CEILINGS<br />

WIRELESS ACCESS POINT<br />

(PROVIDED BY COLLEGE)<br />

3<br />

FLUSH CEILING MOUNTED JUNCTION BOX INSTALLATION DETAIL<br />

SCALE: <strong>NO</strong>NE<br />

2<br />

ACCESS CONTROL SYSTEM<br />

EQUIPMENT LAYOUT # TYPICAL<br />

SCALE: NTS<br />

CABLE SCHEDULE FOR ACCESS CONTROL<br />

A # 18/2, TWISTED PAIR, SHIELDED, 3/4"C<br />

B # 18/6. TWISTED PAIR, SHIELDED, 3/4"C<br />

EACH CABLE GROUP SHALL BE RUN IN SEPARATE CONDUIT<br />

MAKE ALL FINAL TERMINATIONS PER MANUFACTURER RECOMMENDATIONS<br />

1<br />

<strong>NO</strong>TES:<br />

WIRELESS ACCESS POINT INSTALLATION DETAIL<br />

SCALE: <strong>NO</strong>NE<br />

1. DO <strong>NO</strong>T INSTALL FACEPLATE ON SINGLE GANG SURFACE/FLUSH OUTLET BOX FOR WIRELESS ACCESS POINT.<br />

PROVIDE MOUNTING SCREWS AND LABELS.<br />

2. TERMINATE WIRELESS ACCESS POINT CAT 6 CABLE ON CAT 6 RJ#45 MODULAR PLUG (MALE 8#PIN CONNECTOR) USING<br />

T568 WIRING CONFIGURATION. PROVIDE 2 FT. OF SLACK CAT 6 CABLE IN THE BOX.<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

65#30 Kissena Boulevard<br />

Flushing NY. 11367<br />

1 9#13#12 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

ISSUE BLOCK<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

2115419<br />

PAUL USURIELLO<br />

STEPHANIE AMOH<br />

JOHN HANNAH<br />

SANDRA BENJAMIN<br />

A<br />

SHEET TITLE<br />

DETAILS<br />

1 2 3 4 5<br />

E#500.00<br />

59<br />

of 65<br />

9/13/2012 12:40:19 PM


ATTACHMENT <strong>NO</strong>. 19<br />

DWG. E600.00(091312)<br />

ELECTRICAL RISER DIAGRAMS<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

D<br />

GENERAL <strong>NO</strong>TES<br />

1. FOR GENERAL <strong>NO</strong>TES, REMOVAL <strong>NO</strong>TES, SYMBOL LIST, AND ABBREVIATIONS, SEE DRAWING<br />

E001.<br />

2. FOR PANEL SCHEDULES, SEE DRAWINGS E601 AND E602.<br />

3. ALL WORK SHOWN ON THIS DRAWING IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR,<br />

U.O.N.<br />

<strong>STV</strong><br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

BIOLOGY LAB<br />

ROOM B237<br />

BIOLOGY LAB<br />

ROOM B241<br />

BIOLOGY LAB<br />

ROOM B243<br />

BIOLOGY LAB<br />

ROOM B245<br />

BIOLOGY LAB<br />

ROOM D231<br />

BIOLOGY LAB<br />

ROOM B237<br />

BIOLOGY LAB<br />

ROOM B241<br />

BIOLOGY LAB<br />

ROOM B243<br />

BIOLOGY LAB<br />

ROOM B245<br />

BIOLOGY LAB<br />

ROOM D231<br />

t 9732401800<br />

3RD FLOOR<br />

REMOVE EXISTING<br />

PANEL AND BRANCH<br />

CIRCUITS (TYPICAL)<br />

EXISTING<br />

PANEL<br />

AP2N<br />

EXISTING<br />

PANEL<br />

AP2P<br />

EXISTING<br />

PANEL<br />

AP2Q<br />

EXISTING<br />

PANEL<br />

AP2R<br />

EXISTING<br />

PANEL<br />

AP2S<br />

1<br />

3RD FLOOR<br />

REPLACE EXISTNG<br />

PANEL WITH NEW<br />

208/120V, 225A<br />

M.L.O., 3PH, 4W, 42P<br />

PANEL (TYPICAL)<br />

NEW<br />

PANEL<br />

PPB237<br />

NEW<br />

PANEL<br />

PPB241<br />

NEW<br />

PANEL<br />

PPB243<br />

NEW<br />

PANEL<br />

PPB245<br />

NEW<br />

PANEL<br />

PPD231<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

2ND FLOOR<br />

2ND FLOOR<br />

J<br />

J<br />

J<br />

J<br />

J<br />

C<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL TO REMAIN<br />

120/208V, 3PH, 4W<br />

(TYPICAL)<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL<br />

DPH<br />

800A<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL<br />

DPI<br />

800A<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL<br />

DPJ<br />

600A<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL<br />

DPK<br />

800A<br />

EXISTING DISTRIBUTION PANEL TO<br />

REMAIN. 120/208V, 3PH, 4W<br />

REPLACE EXISTING<br />

OVERCURRENT DEVICE(S)<br />

PREVIOUSLY SERVING REMOVED<br />

PANEL(S) WITH NEW COMPATIBLE<br />

200A, 3P +N OVERCURRENT<br />

DEVICE (VERIFY IN FIELD).<br />

(TYPICAL)<br />

1<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL<br />

DPH<br />

800A<br />

(ROOM B115A)<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL<br />

DPI<br />

800A<br />

(ROOM B105)<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL<br />

DPJ<br />

600A<br />

(ROOM B101)<br />

EXISTING<br />

DISTRIBUTION<br />

PANEL<br />

DPK<br />

800A<br />

(ROOM D119)<br />

4#3/0 +1#6G IN EXISTING 2"C<br />

(TYPICAL)<br />

1ST FLOOR<br />

1ST FLOOR<br />

EXISTING MAIN<br />

DISTRIBUTION<br />

SWITCHBOARD 2500A,<br />

120/208V, 3PH, 4W<br />

EXISTING MAIN<br />

DISTRIBUTION<br />

SWITCHBOARD 2500A,<br />

120/208V, 3PH, 4W<br />

SEALS<br />

CELLAR<br />

CELLAR<br />

SWITCHBOARD ROOM<br />

SWITCHBOARD ROOM<br />

PART POWER RISER DIAGRAM EXISTING<br />

<strong>NO</strong> SCALE<br />

PART POWER RISER DIAGRAM NEW<br />

<strong>NO</strong> SCALE<br />

B<br />

PROJECT IDENTIFICATION<br />

TELECOM ROOM B343A<br />

NEW WALL<br />

MOUNT<br />

IDF<br />

MOUNT AT 6'0" A.F.F.<br />

FROM BOTTOM OF RACK<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6530 Kissena Boulevard<br />

Flushing NY. 11367<br />

3RD FLOOR<br />

CAT6<br />

PROVIDE NEW 4" CONDUIT FOR<br />

WIRING OF NEW DEVICES. RUN<br />

NEXT TO EXISTING 4" CONDUIT.<br />

A<br />

2ND FLOOR<br />

AP<br />

AP<br />

BIOLOGY<br />

LAB B237<br />

AP<br />

AP<br />

BIOLOGY<br />

LAB B241<br />

AP<br />

AP<br />

BIOLOGY<br />

LAB B243<br />

AP<br />

AP<br />

BIOLOGY<br />

LAB B245<br />

AP<br />

AP<br />

BIOLOGY<br />

LAB D231<br />

EXISTING<br />

MDF IN<br />

ROOM A135E<br />

BACKBONE CABLING<br />

24 STRAND, 50 MICRON<br />

MULTIMODE FIBER OPTIC<br />

CABLE IN 2" CONDUIT.<br />

1 91312 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

STEPHANIE AMOH<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

2115419<br />

JOHN HANNAH<br />

1ST FLOOR<br />

TELECOMMUNICATIONS RISER DIAGRAM<br />

<strong>NO</strong> SCALE<br />

1 2 3 4 5<br />

ELECTRICAL<br />

RISER<br />

DIAGRAMS<br />

E600.00<br />

60<br />

of 65<br />

9/13/2012 12:40:19 PM


ATTACHMENT <strong>NO</strong>. 20<br />

DWG. FA001.00 (091312)<br />

SYMBOL LIST, GENERAL <strong>NO</strong>TES & RISER<br />

DIAGRAM<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


1<br />

2 3 4 5<br />

SCOPE OF WORK<br />

GENERAL <strong>NO</strong>TES<br />

<strong>STV</strong><br />

D<br />

SYMBOL<br />

FSD<br />

R<br />

CM<br />

FIRE ALARM SYMBOL LIST<br />

DESCRIPTION<br />

WALL MOUNTED STROBE. MOUNT AT 8'0" A.F.F. OR 6" BELOW CEILING, WHICHEVER IS LOWER.<br />

FIRE SMOKE DAMPER (FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED BY ELECTRICAL CONTRACTOR)<br />

FIRE ALARM RELAY<br />

CONTROL MODULE<br />

FIRE ALARM SYSTEM CONDUIT<br />

SIZING CHART<br />

CONDUIT MAX # OF CABLES<br />

SIZE PER CONDUIT<br />

3/4" 4<br />

1" 6<br />

1 1/4" 8<br />

1 1/2" 10<br />

2" 12<br />

1. PROVIDE A NEW FIRE ALARM SYSTEM FOR THE AREA B AND D LABS.<br />

2. THE WORK SHALL INCLUDE ALL LABOR, MATERIALS AND NECESSARY SERVICES TO PROVIDE A<br />

COMPLETE ADDRESSABLE FIRE ALARM SYSTEM.<br />

3. NEW FIRE ALARM SYSTEM SHALL BE INTERFACED WITH THE MAIN FIRE ALARM CONTROL PANEL<br />

(FACP) TO PROVIDE THE FOLLOWING FUNCTIONS:<br />

a. AN ALARM CONDITION INITIATED AT THE MAIN FACP SHALL ALSO ACTIVATE<br />

AN ALARM CONDITION AT THE AREA “B” AND “D” FACP.<br />

b. AN ALARM CONDITION INITIATED AT THE AREA “B” AND “D” FACP SHALL<br />

ALSO ACTIVATE AN ALARM CONDITION AT THE MAIN FACP.<br />

4. THE SYSTEM SHALL INCLUDE ALL PERIPHERAL DEVICES, MONITORING AND CONTROL MODULES<br />

AND RELAYS, AND VISUAL <strong>NO</strong>TIFICATION DEVICES REQUIRED TO PROVIDE A FULLY FUNCTIONING<br />

SYSTEM.<br />

1. THE FIRE ALARM CONTRACTOR SHALL RETAIN THE SERVICES OF AN AUTHORIZED<br />

REPRESENTATIVE OF THE MANUFACTURER OF THE EXISTING FIRE ALARM SYSTEM (SIMPLEX<br />

GRINNELL PHONE # 2123724209, CONTACT PERSON IS ROBERT LAURIE) TO FURNISH AND<br />

INSTALL THE INTERFACE CONNECTION AND MAINTAIN THE INTEGRITY OF THE EXISTING FIRE<br />

ALARM SYSTEM AND WARRANTIES.<br />

2. EXISTING FIRE ALARM SYSTEM SHALL REMAIN FULLY OPERATIONAL AT ALL TIMES.<br />

3. COMPONENTS AND DEVICES ASSOCIATED WITH THE NEW FIRE ALARM SYSTEM SHALL BE OFFICE<br />

OF TECHNICAL CERTIFICATION AND RESEARCH (OTCR) APPROVED AND COMPATIBLE WITH<br />

EXISTING FACP.<br />

4. THE FIRE ALARM RISER IN THIS CONTRACT IS FOR DESIGN PURPOSE ONLY. FIRE ALARM<br />

CONTRACTOR SHALL PROVIDE A COMPLETE FIRE ALARM RISER DIAGRAM, SHOP DRAWING<br />

SHOWING ACTUAL FIELD WIRING REQUIRED.<br />

5. PROVIDE FIRESTOPS FOR RACEWAYS PENETRATING WALLS AND CEILINGS TO MAINTAIN ORIGINAL<br />

FIRE RATING.<br />

<strong>STV</strong> INC.<br />

225 PARK AVE. SOUTH<br />

NEW YORK, NY 10003<br />

www.stvinc.com<br />

CONSULTANTS<br />

ENVIRONMENTAL<br />

MATRIX NEW WORLD<br />

120 EAGLE ROCK AVENUE SUITE 207<br />

EAST HA<strong>NO</strong>VER, NJ. 07936<br />

TS<br />

TAMPER SWITCH<br />

6. INCLUDE ALL WORK FOR INTERCONNECTING CIRCUITRY BETWEEN NEW FIRE ALARM CONTROL<br />

PANEL AND EXISTING FIRE ALARM CONTROL PANEL.<br />

t 9732401800<br />

FS<br />

WATER FLOW SWITCH<br />

7. FILE A433 (APPLICATION FOR ELECTRICAL INSPECTION AND SUMMARY OF CONTRACT EQUIPMENT<br />

TO BE INSTALLED) WITH THE DIVISION OF FIRE PREVENTION OF THE FIRE DEPARTMENT.<br />

COST ESTIMATING<br />

DACK CONSULTING SOLUTIONS<br />

MM<br />

D<br />

MONITORING MODULE<br />

DUCT SMOKE DETECTOR<br />

8. FILE APPLICATION WITH THE FIRE DEPARTMENT FOR A CERTIFICATE OF APPROVAL ON THE<br />

ADDITION OF A SUBSYSTEM TO THE EXISTING FACP WHICH HAS FDNY APPROVAL NUMBER.<br />

9. AS REQUIRED BY THE FIRE DEPARTMENT, ARRANGE FOR INSPECTION OF NEW FIRE ALARM<br />

SYSTEM.<br />

2 WILLIAM STREET SUITE 202<br />

WHITE PLAINS, NY. 10601<br />

t 9146867102<br />

10. FIRE ALARM WIRING SHALL <strong>NO</strong>T BE SPLICED. FIRE ALARM WIRING SHALL BE CONTINUOUS FROM<br />

TERMINAL CABINETS OR FROM EQUIPMENT TO EACH DEVICE. SPLICES ARE <strong>NO</strong>T PERMITTED<br />

BETWEEN DEVICES AND/OR CABINETS AT APPROVED JUNCTION AND PULL BOXES. WIRING<br />

SHOULD BE TERMINATED AT TERMINAL BLOCKS OR DEVICES ONLY.<br />

C<br />

11. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH FA VENDOR, MAINTENANCE<br />

CONTRACTOR AND FDNY TO OBTAIN AND/OR MAINTAIN APPROVED SYSTEM STATUS.<br />

1<br />

12. FIRE ALARM CONTRACTOR SHALL VERIFY OPERATION OF EXISTING FIRE ALARM PULL STATIONS<br />

THROUGHOUT THE BUILDING FOR POSSIBLE REPLACEMENT.<br />

13. INSTALLATION SHALL BE IN STRICT CONFORMANCE WITH NFPA 72, NATIONAL ELECTRICAL CODE,<br />

LOCAL CODE(S), AND/OR AUTHORITY HAVING JURISDICTION.<br />

14. ALL WIRING SHALL BE INSTALLED IN RIGID GALVANIZED CONDUIT. ALL CONDUITS SHALL BE<br />

CONCEALED AND 3/4" MINIMUM.<br />

15. COORDINATE MOUNTING LOCATION OF ALL FIRE ALARM DEVICES WITH HVAC EQUIPMENT,<br />

DUCTWORK, AND PIPING IN THE ROOM.<br />

TO 120VAC<br />

SEE ELECTRICAL<br />

DRAWINGS<br />

FSD FSD FSD FSD FSD FSD<br />

FSD FSD FSD<br />

R<br />

R<br />

R<br />

FSD<br />

TO 120VAC<br />

SEE ELECTRICAL<br />

DRAWINGS<br />

16. UNLESS OTHERWISE INDICATED, ALL MOUNTING ELEVATIONS ARE CENTERLINE ELEVATIONS.<br />

17. ARRANGE WIRING FOR <strong>NO</strong>TIFICATION DEVICES SO THAT LOSS OF PORTION OF THE WIRING TO AN<br />

AREA WILL <strong>NO</strong>T RENDER MORE THAN 60% OF THE DEVICES OF EACH TYPE I<strong>NO</strong>PERATIVE. THE<br />

DEVICES SHALL BE CONNECTED TO THE CIRCUITRY BY MEANS OF ALTERNATE CIRCUITS AS TO<br />

MAINTAIN AT LEAST PARTIAL AUDIBILITY/VISIBILITY THROUGHOUT THE ENTIRE AREA.<br />

CM<br />

D<br />

D<br />

D<br />

D<br />

CM<br />

D<br />

D<br />

D<br />

D<br />

CM<br />

D<br />

D<br />

BUILDING DEPARTMENT <strong>NO</strong>TES<br />

SEALS<br />

2ND FLOOR<br />

BIOLOGY<br />

LAB B237<br />

BIOLOGY<br />

LAB B241<br />

BIOLOGY<br />

LAB B243<br />

BIOLOGY<br />

LAB B245<br />

BIOLOGY<br />

LAB D231<br />

120 VAC<br />

POWER<br />

SOURCE<br />

FIRE ALARM<br />

SHUTDOWN<br />

CONTACT<br />

C<br />

CM<br />

NC<br />

FSD<br />

DAMPER<br />

ACTUATOR<br />

FIRE/SMOKE<br />

DAMPER USED IN<br />

<strong>NO</strong>RMAL OPERATION<br />

(TYPICAL)<br />

1. WORK SHALL BE EXECUTED IN FULL COMPLIANCE WITH THE APPLICABLE PROVISIONS OF ALL<br />

LAWS, BYLAWS, STATUTES, ORDINANCES, CODES, RULES, REGULATIONS AND LAWFUL ORDERS<br />

OF PUBLIC AUTHORITIES. THE CONTRACTOR SHALL PROMPTLY <strong>NO</strong>TIFY THE AUTHORITY'S<br />

REPRESENTATIVE OF ANY PORTIONS OF THE WORK IN THE CONTRACT DOCUMENTS THAT ARE AT<br />

VARIANCE WITH THE ABOVE.<br />

2. COMMENCEMENT OF OPERATIONS: AT LEAST 24 HOURS WRITTEN <strong>NO</strong>TICE SHALL BE GIVEN TO<br />

THE COMMISSIONER OF BUILDINGS BEFORE COMMENCING OF WORK. SPECIAL INSPECTION<br />

ITEMS REQUIRE 72 HOURS PRIOR WRITTEN <strong>NO</strong>TICE TO PERSONS RESPONSIBLE FOR INSPECTION<br />

PER SECTION28116.2.3, NEW YORK CITY BUILDING CODE.<br />

3. ALL MATERIALS, ASSEMBLIES, FORMS METHODS OF CONSTRUCTION AND SERVICE EQUIPMENT<br />

SHALL MEET THE FOLLOWING REQUIREMENTS:<br />

A) THEY SHALL HAVE BEEN ACCEPTABLE PRIOR TO THE EFFECTIVE DATE OF THE CODE<br />

BY THE BOARD OF STANDARDS AND APPEALS AND MEA.<br />

B<br />

1ST FLOOR<br />

TS<br />

MM<br />

TS<br />

MM<br />

FS<br />

MM<br />

NEW FIRE<br />

ALARM<br />

CONTROL<br />

PANEL<br />

(ROOM D023)<br />

TIE INTO EXISTING<br />

FIRE ALARM PANEL<br />

EXISTING FIRE<br />

ALARM<br />

CONTROL<br />

PANEL<br />

(ROOM D023)<br />

TO NEXT FIRE/SMOKE<br />

DAMPER<br />

FSD<br />

DAMPER<br />

ACTUATOR<br />

B) THEY SHALL HAVE BEEN ACCEPTED FOR THE USE UNDER THE PRESCRIBED TEST<br />

METHODS BY THE COMMISSIONER (OR)<br />

C) APPROVED BY THE BOARD OF STANDARDS AND APPEALS (106.2).<br />

4. MATERIALS OR ASSEMBLIES REQUIRED TO HAVE A FIRE RESISTANCE RATING SHALL COMPLY<br />

WITH ONE OF THE FOLLOWING:<br />

A) THEY SHALL CONFORM WITH A.I.S.G. "FIRE RESISTANCE RATING", DATED 1985 (OR)<br />

B) THEY SHALL HAVE BEEN TESTED IN ACCORDANCE WITH ASTM E119, STANDARD<br />

METHODS OF FIRE TESTS OF BUILDING CONSTRUCTION AND MATERIALS AND<br />

ACCEPTED BY THE COMMISSIONER (OR)<br />

PROJECT IDENTIFICATION<br />

CONVERSION OF LABORATORIES<br />

SCIENCE BUILDING<br />

QUEENS COLLEGE<br />

6530 Kissena Boulevard<br />

Flushing NY. 11367<br />

CELLAR<br />

C) THEY SHALL HAVE BEEN ACCEPTABLE PRIOR TO THE EFFECTIVE DATE OF THE CODE.<br />

SEE <strong>NO</strong>TE 1<br />

A<br />

FIRE ALARM RISER DIAGRAM<br />

<strong>NO</strong> SCALE<br />

1<br />

TYPICAL FIRE/SMOKE<br />

DAMPER (FSD) SHUTDOWN<br />

1 2 3 4 5<br />

SCALE: NTS<br />

SEQUENCE OF OPERATION:<br />

1. ACTIVATION OF A NEW SPRINKLER WATER FLOW DEVICE OR DUCT SMOKE DETECTOR SHALL:<br />

A. ACTIVATE THE NEW STROBE LIGHTS IN THE 2ND FLOOR LABS TO FLASH CONTINUOUSLY UNTIL<br />

MANUALLY RESET OR AUTOMATICALLY STOP AFTER FIVE MINUTES OF ACTIVATION<br />

B. SHUT DOWN ALL FANS VIA THE EXISTING FACP<br />

C. RECALL ELEVATORS TO RETURN <strong>NO</strong>NSTOP TO THE MAIN LOBBY VIA THE EXISTING FACP.<br />

D. CLOSE ALL FIRE SMOKE DAMPERS<br />

E. ACTIVATE AN ALARM SIGNAL AT THE NEW FACP<br />

2. ACTIVATION OF A TAMPER SWITCH SHALL:<br />

A. ACTIVATE A SUPERVISORY SIGNAL AT THE NEW FACP<br />

3. TROUBLE SIGNAL FROM OPEN CIRCUIT, GROUNDED WIRES, BATTERY FAULT OR WIRE TO WIRE<br />

FAULT SHALL:<br />

A. ACTIVATE A TROUBLE SIGNAL AT THE NEW FACP<br />

4. THE NEW FACP SHALL BE CAPABLE OF ACTIVATING:<br />

A. AN ALARM SIGNAL AT THE EXISTING FACP<br />

B. A TROUBLE SIGNAL AT THE EXISTING FACP<br />

C. A SUPERVISORY SIGNAL AT THE EXISTING FACP<br />

5. ACTIVATION OF A N ALARM CONDITION IN THE EXISTING FACP SHALL:<br />

A. ACTIVATE THE STROBE LIGHTS TO FLASH CONTINUOUSLY UNTIL MANUALLY RESET OR<br />

AUTOMATICALLY STOP AFTER FIVE MINUTES OF ACTIVATION IN THE NEW FACP<br />

B. CLOSE ALL FIRE SMOKE DAMPER IN THE NEW FACP<br />

1 91312 <strong>ADDENDUM</strong> #1<br />

MARK DATE DESCRIPTION<br />

PROJECT <strong>NO</strong>.:<br />

PROJ. MGR:<br />

DRAWN BY:<br />

CHECKED BY:<br />

DESIGN MGR:<br />

ISSUE BLOCK<br />

PAUL USURIELLO<br />

STEPHANIE AMOH<br />

SANDRA BENJAMIN<br />

SHEET TITLE<br />

SYMBOL LIST,<br />

GENERAL<br />

<strong>NO</strong>TES, & RISER<br />

DIAGRAM<br />

FA001.00<br />

63<br />

of 65<br />

2115419<br />

JOHN HANNAH<br />

9/13/2012 12:40:20 PM


ATTACHMENT <strong>NO</strong>. 21<br />

FIRE ALARM SYSTEM PULL STATION CODE CARD<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


ATTACHMENT <strong>NO</strong>. 22<br />

NAMEPLATE DATA FOR EXISTING DISTRIBUTION<br />

PANELS<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


ATTACHMENT <strong>NO</strong>. 23<br />

NAMEPLATE DATA FOR EXISTING PANELBOARD<br />

UNITS<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


ATTACHMENT <strong>NO</strong>. 24<br />

CUNY QUEENS COLLEGE – SCIENCE BUILDING<br />

1 ST FLOOR DIRECTORY<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


ATTACHMENT <strong>NO</strong>. 25<br />

CUNY QUEENS COLLEGE – SCIENCE BUILDING<br />

2 ND FLOOR DIRECTORY<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL


ATTACHMENT <strong>NO</strong>. 26<br />

CUNY QUEENS COLLEGE – SCIENCE BUILDING<br />

3 RD FLOOR DIRECTORY<br />

<strong>STV</strong> Construction, <strong>Inc</strong>.<br />

Addendum No. 1 (092012)<br />

CITYWCUCF010904GC/MECH/EL/PL