<strong>ADDENDUM</strong> <strong>NO</strong>. 1<br />
September 20, 2012<br />
QUEENS COLLEGE CONVERSION OF LABORATORIES<br />
CONTRACT <strong>NO</strong>. CITYWCUCF010904GC – General Construction<br />
CONTRACT <strong>NO</strong>. CITYWCUCF010904MECH – Mechanical<br />
CONTRACT <strong>NO</strong>. CITYWCUCF010904EL Electrical<br />
CONTRACT <strong>NO</strong>. CITYWCUCF010904PL Plumbing<br />
This Addendum is being issued for the purpose of amending the subject Request for Bids (RFBs) as below and<br />
is hereby made part of said RFBs to the same extent as though it were originally included therein. This<br />
Addendum makes the following changes and clarifications to the bid documents:<br />
Changes to Bid Documents<br />
(1) Project Manual Table of Contents<br />
a. Volume 1 of 2 – Change “Envelope #3 – Low Bidders’ Additional Information Forms” to<br />
“Envelope #2 – Low Bidders’ Additional Information Forms”<br />
(2) Section II, Article 5.4 of the Instructions to Bidders – Prevailing Wage Rate/ Craft Training Program<br />
a. Replace Article 5.4 in its entirety with the following: “If an apprentice is employed on the<br />
project, they must be registered under a bona fide New York State Department of Labor<br />
Apprenticeship Program in accordance with New York State Labor Law 220.3.”<br />
(3) Section 01 11 16 – Summary of Work<br />
a. Page 011116>2 Item E – Add sentence: “In the event of a jurisdictional work issue for a prime<br />
contractor or subcontractor to a prime contractor, the other three prime contractors will be<br />
responsible for providing all labor as necessary to maintain labor harmony.”<br />
(4) Project Milestone Schedule<br />
a. Change Construction Phase Duration from “170 ccd” to “165 ccd”<br />
(5) Price Proposal for Electrical Contract<br />
a. Price Proposal for Electrical Contract shall be replaced with Attachment No. 1: Revised Price<br />
Proposal for Electrical Contract<br />
(6) Section 01 11 17 of the General Requirements shall be replaced with Attachment No. 2: Revised Section<br />
01 11 17 – Drawing List<br />
(7) Drawing G>001.00 shall be replaced with Attachment No. 3: Revised Drawing G>001.00 dated 9>13>12<br />
(8) Drawing A>100.00 shall be replaced with Attachment No. 4: Revised Drawing A>100.00 dated 9>13>12<br />
(9) Drawing A>110.00 shall be replaced with Attachment No. 5: Revised Drawing A>110.00 dated 9>13>12<br />
Page 1 of 6
(10) Drawing A>111.00 shall be replaced with Attachment No. 6: Revised Drawing A>111.00 dated 9>13>12<br />
(11) Drawing A>112.00 shall be replaced with Attachment No. 7: Revised Drawing A>112.00 dated 9>13>12<br />
(12) Drawing A>404.00 shall be replaced with Attachment No. 8: Revised Drawing A>404.00 dated 9>13>12<br />
(13) Drawing A>406.00 shall be replaced with Attachment No. 9: Revised Drawing A>406.00 dated 9>13>12<br />
(14) Drawing FP>001.00 shall be replaced with Attachment No.10: Revised Drawing FP>001.00 dated 9>13>12<br />
(15) Drawing FP>101.00 shall be replaced with Attachment No.11: Revised Drawing FP>101.00 dated 9>13>12<br />
(16) Drawing P>001.00 shall be replaced with Attachment No.12: Revised Drawing P>001.00 dated 9>13>12<br />
(17) Drawing M>101.00 shall be replaced with Attachment No.13: Revised Drawing M>101.00 dated 9>13>12<br />
(18) Drawing E>001.00 shall be replaced with Attachment No.14: Revised Drawing E>001.00 dated 9>13>12<br />
(19) Drawing E>100.00 shall be replaced with Attachment No.15: Revised Drawing E>100.00 dated 9>13>12<br />
(20) Drawing E>110.00 shall be replaced with Attachment No.16: Revised Drawing E>110.00 dated 9>13>12<br />
(21) Drawing E>130.00 shall be replaced with Attachment No.17: Revised Drawing E>130.00 dated 9>13>12<br />
(22) Drawing E>500.00 shall be replaced with Attachment No.18: Revised Drawing E>500.00 dated 9>13>12<br />
(23) Drawing E>600.00 shall be replaced with Attachment No.19: Revised Drawing E>600.00 dated 9>13>12<br />
(24) Drawing FA>001.00 shall be replaced with Attachment No.20: Revised Drawing FA>001.00 dated 9>13>12<br />
Bidder Questions and Reponses<br />
Question (1): Regarding M/WBE Requirements – Do we choose who we are giving the work? Do we give the<br />
% of work to either MBE or WBE, or is it mandatory to give 20% to both MBE and WBE?<br />
Answer (1): Refer to Section III, Article 2 of the Instructions to Bidders for information regarding<br />
participation by Minority>Owned and Women>Owned Business Enterprises. The Bidder is<br />
required to meet the requirements for participation by New York State Certified Minority>Owned<br />
Business Enterprises (MBE) at 12.00% of the total contract value, and Women>Owned Business<br />
Enterprises (WBE) at 8.00% of the total contract value. Additional information regarding<br />
M/WBE participation can be found in Appendix 2 of the Instructions to Bidders, with a link to the<br />
directory of New York State Certified MWBEs (http://www.esd.ny.gov/mwbe.html). Bidders are<br />
required to select proposed subcontractors for participation in the MWBE program associated<br />
with this project.<br />
Question (2): Drawing G001.00 states to maintain negative air pressure during construction. Is this for the<br />
entire duration of project?<br />
Answer (2):<br />
The GC is required to maintain negative air pressure for the entire duration of the project,<br />
through Substantial Completion.<br />
Question (3): Is there a specific on or off campus location where <strong>STV</strong> trailer can be located?<br />
Answer (3):<br />
There is no space available on campus for the <strong>STV</strong> office trailer. Contractor is required to locate<br />
trailer off campus in close proximity to the project site.<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (09>20>12) Page 2 of 6<br />
CITYW>CUCF>01>09>04>GC/MECH/EL/PL
Question (4): Drawing A100.00 – Demo note #3 states to discard and or salvage existing equipment. For<br />
bidding purposes can you specify which pieces get discarded and which pieces get salvaged?<br />
Answer (4):<br />
Equipment to be salvaged will be identified prior to start of demolition. Contractor to include<br />
cost of removal and disposal and/or removal and salvage as part of Total Bid Price. Salvage<br />
includes removal and turn>over to college at a storage location on the Queens College campus as<br />
designated by the college.<br />
Question (5): Drawing A100.00 – Demo note #4 states to remove VCT floor and base. Is this at all rooms that<br />
have existing VCT and base?<br />
Answer (5):<br />
The existing VCT and base, including mastic and adhesive, in all labs and prep rooms within the<br />
scope of work for this project shall be removed (Rooms B237, B241, B243, B245, B203, B211,<br />
D231, and D231A).<br />
Question (6): Is shot blasting of floors required prior to resinous flooring application? And does it have to be<br />
done after hours?<br />
Answer (6):<br />
Shot blasting is required for the preparation of concrete substrates to receive resinous flooring.<br />
See Section 096723 of the Contract Specifications for further details regarding the installation of<br />
resinous flooring. Preparation work and application of resinous flooring shall be performed after<br />
normal work hours. There is no additional compensation for after hours work. See Section<br />
011116 of the Contract General Conditions for further details regarding work restrictions.<br />
Question (7): Drawing A100.00 Note 10 states to remove existing blackboards. Please provide quantity.<br />
Answer (7):<br />
Drawing A100.00 Note 10 has been revised to include removal of all existing blackboards and<br />
whiteboards. Quantity to be verified in field by Contractor.<br />
Question (8): Drawing A110.00/ P601.00 – Which prime provides emergency shower/eyewash?<br />
Answer (8):<br />
The Plumbing Contractor shall furnish and install the combination emergency shower eye/ face<br />
wash units and the deck mounted hand held emergency eye/ face wash units. See Dwg. P>501.00<br />
and Specification Section 224500 (Emergency Plumbing Fixtures) for further information.<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Note the following regarding Laboratory Fixtures:<br />
• Plumbing Contractor furnishes and installs Weldbilt Double Compartment Scullery Sink and<br />
associated faucet (Spec Section 224300>2.03) in Rm D231. All epoxy resin sinks (Spec<br />
Section 123553>2.08) are furnished and installed by General Contractor. Associated faucets<br />
for epoxy resin sinks are furnished by General Contractor and installed by Plumbing<br />
Contractor. Air, vacuum and gas turrets are furnished by General Contractor and installed by<br />
Plumbing Contractor.<br />
• Electrical pedestals housing for laboratory casework shall be furnished by General<br />
Contractor and installed by Electrical Contractor.<br />
Addendum No. 1 (09>20>12) Page 3 of 6<br />
CITYW>CUCF>01>09>04>GC/MECH/EL/PL
• The installation contractor is responsible for accepting delivery and storage of material<br />
furnished by other contractor(s), in accordance with the requirements of the contract. The<br />
installation contractor must furnish and install all ancillary components to provide complete<br />
installation for proper operation of equipment and material.<br />
Question (9): Who furnishes and installs smart boards?<br />
Answer (9):<br />
Smart boards shall be furnished and installed by the Electrical Contractor. See Specialty<br />
Equipment Schedule on Drawings A>401.00, A>402.00, A>403.00, A>404.00, and A>407.00.<br />
Question (10): Spec Section 013529 Note 11 – Does GC provide watchmen service?<br />
Answer (10): The General Contractor shall provide security services for the <strong>STV</strong> Construction Field Office<br />
and Equipment. The General Contractor is also responsible for the security of the work site and<br />
to provide suitable site protection to prevent unauthorized entry onto the site, until final<br />
acceptance by CUNY, in accordance with contract requirements.<br />
Question (11): Spec Section 015100>2E – Where can we place temp toilets?<br />
Answer (11): Queens College will provide an area on campus outside the Science Building for the General<br />
Contractor to locate temporary toilets.<br />
Question (12): Spec Sect 05100>3H – Is temp fence required?<br />
Answer (12): Temporary fencing is not required.<br />
Question (13): Spec Sect 011116>11 2.2 a>1 calls for temp barricades. Please provide locations where these<br />
barricades are to be constructed.<br />
Answer (13): Temporary construction barricades are required in the corridors adjacent to the entrances of the<br />
laboratories within the scope of work for this project. General Contractor shall comply with<br />
Section 011116 of the General Requirements for design of the temporary construction barricade.<br />
Question (14): Spec Sect 011116>9 1.9 – Note 9 calls for masonite protection of floors. Can this protection be<br />
left in place or must it be picked up and reinstalled on daily basis?<br />
Answer (14): The General Contractor is permitted to leave protection in place as long as it is maintained on a<br />
daily basis, presents no tripping hazard, and does not obstruct doors or create any type of access<br />
issues, in accordance with the contract General Requirements.<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (09>20>12) Page 4 of 6<br />
CITYW>CUCF>01>09>04>GC/MECH/EL/PL
Question (15): Is the existing fire alarm system approved by the fire department?<br />
Answer (15): An allowance of $25,000.00 has been included in the Revised Electrical Price Proposal for work<br />
performed by the Electrical Contractor directly related to correction of non>compliance issues for<br />
the existing Fire Alarm System in the Queens College Science Building. All costs to be verified.<br />
Question (16): Who will be responsible to file the application for plan examination for the additional panel and<br />
devices related to the fire alarm system?<br />
Answer (16): <strong>STV</strong> has filed the application for plan examination for the additional fire alarm panel and<br />
devices.<br />
Question (17): Who is responsible for the design of the new fire alarm system?<br />
Answer (17): <strong>STV</strong> has developed the design of the new fire alarm system as specified in the Contract<br />
Documents.<br />
Question (18): If the fire department requires additional coverage, who will be responsible for the additional<br />
cost?<br />
Answer (18): FDNY requirement for additional coverage exceeding the contract design documents shall be<br />
processed as a change order to the electrical base contract.<br />
Question (19): Drawing FA>001.00 General Note #12 reads “Electrical Contractor shall verify operation of<br />
existing fire alarm pull stations throughout the building for possible replacement.” Can you<br />
please provide count of how many pull stations are in the building?<br />
Answer (19): Attachment No. 21 – Fire Alarm System Pull Station Code Card is included in this Addendum<br />
for your use in determining the existing pull stations throughout the Queens College Science<br />
Building.<br />
Question (20): Who is responsible for the replacement of any non>functioning pull stations?<br />
Answer (20): The Electrical Contractor is responsible for replacement of any non>functioning pull stations,<br />
under the Allowance for work performed by the Electrical Contractor directly related to<br />
correction of non>compliance issues for the existing Fire Alarm System.<br />
Question (21): Drawing E>600.00 note regarding the existing distribution panel reads “…Replace existing<br />
overcurrent device(s) previously serving removed panel(s) with new compatible 200A, 3P + N<br />
overcurrent device (typical).” Who is responsible to verify that existing overcurrent devices<br />
service only the mentioned panels?<br />
Answer (21): The Electrical Contractor is responsible to verify that existing overcurrent devices service only<br />
the mentioned panels, as part of base contract work.<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (09>20>12) Page 5 of 6<br />
CITYW>CUCF>01>09>04>GC/MECH/EL/PL
Question (22): In the event that the overcurrent devices service additional load not within the working space,<br />
who is responsible for the temporary power to the additional load?<br />
Answer (22): The Electrical Contractor is responsible for the temporary power to the additional load. The<br />
contractor’s cost to provide temporary power to the additional load will be processed as a change<br />
order for extra work.<br />
Question (23): Since we were not able to see the distribution panels, can you please provide existing distribution<br />
panel manufacturer and model number also the type of breaker required.<br />
Answer (23): Attachment No. 22 – Nameplate Data for Existing Distribution Panels and Attachment No. 23 –<br />
Nameplate Data for Existing Panelboard Units are included in this Addendum for your use.<br />
Question (24): Please provide approximate distance between existing distribution panels and new panels located<br />
inside the labs.<br />
Answer (24): Attachment No. 24 – CUNY QC SB 1 st Floor Directory, Attachment No. 25 – CUNY QC SB 2 nd<br />
Floor Directory, and Attachment No. 26 – CUNY QC SB 3 rd Floor Directory are included in this<br />
Addendum for your use in determining the distance between existing distribution panels and new<br />
panels located inside labs. Locations of existing distribution panels are indicated in Part Power<br />
Riser Diagram – New, on Drawing E>600.00.<br />
By signing in the space provided below, the Proposer acknowledges receipt of this Addendum. This<br />
Addendum must be signed by the Proposer and submitted with the Proposal.<br />
________________________<br />
Name of Proposer<br />
________________________ ____________________ ____________________________ ____________<br />
Name of Authorized Proposer Title Signature Date<br />
Representative<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (09>20>12) Page 6 of 6<br />
CITYW>CUCF>01>09>04>GC/MECH/EL/PL
ATTACHMENT <strong>NO</strong>. 1<br />
REVISED PRICE PROPOSAL FOR ELECTRICAL<br />
CONTRACT<br />
CITYWCUCF010904EL<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
PRICE PROPOSAL – ENVELOPE 1<br />
PRICE PROPOSAL SUBMISSION<br />
for<br />
LUMP SUM BID<br />
to<br />
<strong>STV</strong> CONSTRUCTION, INC.<br />
for the following:<br />
Contract Number:<br />
CITYWCUCF010904EL<br />
Contract Name/ Description: Science Building – 2 nd Floor Conversion of Laboratories –<br />
Electrical Contractor<br />
College:<br />
Borough:<br />
Queens College__________________________________<br />
Queens_________________________________________<br />
Bid<br />
of<br />
______________________________________________________________________________<br />
(Bidder’s Name) (Bidder’s Federal I.D. #)<br />
a corporation organized and existing under the laws of the State of<br />
or a limited liability company organized and existing under the laws of the State of<br />
or a partnership or joint venture consisting of<br />
A. Price Proposal Submission:<br />
The Bidder shall complete and execute this Price Proposal Form and enclose it in a sealed and<br />
clearly marked and properly identified envelope with all other required bid documents.<br />
The bidder must submit its sealed Price Proposal to <strong>STV</strong> Construction, <strong>Inc</strong>. in accordance with<br />
the terms listed in the Instruction to Bidders or modified by Addendum. See Instructions to<br />
Bidders and all Contract documents.<br />
65
PRICE PROPOSAL – ENVELOPE 1<br />
B. Time is of the essence for completion of the project in this package.<br />
C. Price<br />
1. The undersigned, as Bidder, declares:<br />
• That this Price Proposal is made, without collusion with any other person, firm or<br />
corporation;<br />
• That the bidder has carefully examined the form of the Project Manual, Advertisement /<br />
Request for Bids, Contract / Form of Contract, Instructions to Bidders, Addenda,<br />
Specifications, Plans and all other Contract Documents;<br />
• That the Bidder has carefully examined the locations, conditions and classes of material<br />
for the proposed work; and<br />
• That the bidder agrees that it will provide all necessary machinery, tools, apparatus and<br />
other means of construction and will do all work and furnish all the materials called for<br />
in the Contract Documents in the manner therein prescribed.<br />
2. In submitting this Price Proposal, the Bidder agrees:<br />
• That <strong>STV</strong> Construction, <strong>Inc</strong>., and/or CUNY and/or CUCF has the right to reject this<br />
Price Proposal in accordance with the Instructions to Bidders.<br />
• To hold this Price Proposal open for a period of one9hundred9twenty (120) calendar<br />
days from the date of the public opening and reading of the Price Proposals, unless this<br />
time period is extended by mutual agreement of the Bidder and <strong>STV</strong> Construction, <strong>Inc</strong>.<br />
• To accomplish the work at the price bid, in accordance with the Contract Documents.<br />
3. Total Price:<br />
Total amount for the furnishing of all labor, materials, services, and equipment required in<br />
conjunction with and properly incidental to all work, in conformance with all Contract<br />
Documents.<br />
In case of a discrepancy between the amount shown in words and the amount shown in<br />
figures, the amount shown in words shall govern.<br />
THE PUBLIC OPENING AND READING OF PRICE IS FOR INFORMATIONAL<br />
PURPOSES ONLY AND IS <strong>NO</strong>T TO BE CONSTRUED AS AN ACCEPTANCE OR<br />
REJECTION OF ANY BID SUBMITTED.<br />
66
PRICE PROPOSAL – ENVELOPE 1<br />
TOTAL<br />
PRICE:__________________________________________________________________<br />
(In Words)<br />
$___________________________________________________________<br />
(In Figures)<br />
D. WORK COST BREAKDOWN<br />
The attached Work Cost Breakdown Form shall be filled out and submitted by the Contractor.<br />
The Total must equal the Total Price, under Section C.3. of this Price Proposal Submission.<br />
FAILURE TO COMPLETE THE WORK COST BREAKDOWN MAY RESULT IN<br />
DISQUALIFICATION OF THE BID.<br />
E. ALLOWANCE FOR FIRE ALARM SYSTEM COMPLIANCE WORK<br />
The Total Price shall include an allowance of $25,000.00 for work performed by the Electrical<br />
Contractor directly related to correction of non9compliance issues for the existing Fire Alarm System in<br />
the Queens College Science Building. All costs associated with the Fire Alarm System Allowance work<br />
to be verified.<br />
67
PRICE PROPOSAL – ENVELOPE 1<br />
QUEENS COLLEGE SCIENCE BUILDING – 2 ND FLOOR CONVERSION OF LABORATORIES<br />
CONTRACT <strong>NO</strong>. CITYWCUCF010904EL<br />
FORM OF PROPOSAL – WORK COST BREAKDOWN<br />
This form shall be filled out and submitted by the Contractor. The Total must equal the Total Price,<br />
under Section C.3.<br />
FAILURE TO COMPLETE THE WORK COST BREAKDOWN MAY RESULT IN<br />
DISQUALIFICATION OF THE BID.<br />
BIDDER: ____________________________________________________________________<br />
DATE: ______________________________________________________________________<br />
ITEM<br />
# DIVISION DESCRIPTION TOTAL COST<br />
1 01 Supervision/ Management $<br />
2 01 Permits $<br />
3 01 Insurance $<br />
4 01 Bonds $<br />
5 01 Safety $<br />
6 01 Cutting & Patching $<br />
7 01 Misc. General Requirements $<br />
8 02 Selective Demolition $<br />
9 07<br />
Thermal and Moisture Protection<br />
(Firestopping)<br />
$<br />
10 10 Specialties (Visual Display Units) $<br />
11 26 Roughing $<br />
12 26 Power Panels $<br />
13 26 Power Receptacles & Circuitry $<br />
14 26 Lighting & Circuitry $<br />
15 27 Tele5Data Communications $<br />
16 28 Access Control $<br />
17 28 Fire Alarm System $<br />
18 28<br />
Allowance 5 Correction of Non5<br />
Compliance Issues for Existing Fire<br />
Alarm System (All Costs to be<br />
Verified) $ 25,000.00<br />
Overhead & Profit (15%) $<br />
TOTAL (Must Equal Total Price) $<br />
68
PRICE PROPOSAL – ENVELOPE 1<br />
F. UNIT PRICES<br />
The Contractor shall provide the following Unit Prices which include, but are not limited to all<br />
necessary labor, material, taxes, supervision, insurance, equipment, tools, layout, freight,<br />
trucking, engineering, overhead, and profit, etc. in order to provide for a complete installation.<br />
The Unit Prices shall be used for added and deleted work in accordance with the Contract<br />
Documents. The Unit Prices shall be held for the duration of the Contract.<br />
Steel Pipe Sleeves up to 2"<br />
Firestopping<br />
Raceway<br />
Armored Cable<br />
Occupancy Sensor 9 Wall mounted<br />
_________ /Each<br />
_________/location<br />
_________/lf<br />
_________ /lf<br />
_________/Each<br />
Occupancy Sensor 9 Ceiling Mounted<br />
Power Pack for Occupancy Sensor<br />
Panel Board 9 flush mounted<br />
Thermal Magnetic Circuit Breaker<br />
GFCI Circuit Breaker<br />
Duplex Receptacle<br />
Quad Receptacles<br />
Duplex Receptacles 9 GFCI<br />
Quad Receptacles 9 GFCI<br />
Receptacle for Lab Equipment<br />
Toggle Switch<br />
Raceway 9 Wall type<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
_________/Each<br />
69
PRICE PROPOSAL – ENVELOPE 1<br />
Dimmer Switch<br />
LED Exit Sign w/ Emergency Battery<br />
SS Cable Tray<br />
Power Strip<br />
Optical Fiber Cable<br />
Junction Box<br />
EMT Conduit 3/4"<br />
EMT Conduit 1/2"<br />
_________/Each<br />
_________/Each<br />
_________/lf<br />
_________/lf<br />
_________/lf<br />
_________/Each<br />
_________/lf<br />
_________/lf<br />
#10 Wire _________/lf<br />
#12 wire _________/lf<br />
Replacement of Existing<br />
Fire Alarm Pull Station<br />
(testing included in base bid)<br />
_________/Each<br />
G. CERTIFICATION<br />
The bidder hereby certifies to the best of its knowledge and belief and under penalty of<br />
perjury under the laws of the United States and the State of New York:<br />
1. That all information provided herein is accurate and truthful.<br />
2. That the bid has been executed with full authority to do so; that the bidder has not directly<br />
or indirectly entered into any agreement, participated in any collusion, or otherwise taken<br />
any action in restraint of free, competitive bidding in connection with these projects; and<br />
that all statements contained in this bid and in this certification are true and correct and<br />
made with full knowledge that <strong>STV</strong> Construction, <strong>Inc</strong>., CUNY and CUCF rely upon the<br />
truth of the statements contained in this bid and in the statements contained in this<br />
certification in awarding the contract for the projects.<br />
3. That neither the bidder nor its principals:<br />
A. are currently debarred, suspended, proposed for debarment, declared ineligible,<br />
or voluntarily excluded from bidding or contracting by any agency of<br />
government including but not limited to federal, state, regional, county or local<br />
government agency, in this or any other state including any department,<br />
70
PRICE PROPOSAL – ENVELOPE 1<br />
division, commission, authority, office, branch, section and political subdivision<br />
or other governmental or quasi9governmental entity;<br />
B. have, within a three9year period preceding this bid, been convicted or had a civil<br />
judgment rendered against them for commission of fraud or a criminal offense<br />
in connection with obtaining, attempting to obtain or performing a public<br />
federal, state or local contract ; violation of federal or state antitrust statutes or<br />
commission of embezzlement, theft, forgery, bribery, falsification or destruction<br />
of records, making false statements, or receiving stolen property;<br />
C. are currently indicted for or otherwise criminally or civilly charged by a<br />
governmental entity (federal, state or local) with commission of any of the<br />
offenses enumerated in paragraph (B) of this certification; and<br />
D. have, within a three9year period preceding this bid, had one or more public<br />
contracts (federal, state or local) terminated for cause or default.<br />
4. The Bidder has, or will subcontract to firms having, current, valid contractor or trade<br />
licenses and permits required under applicable New York State and New York City laws<br />
for any trade or specialty area in which the firm seeks to perform work.<br />
5. During the term of construction of the projects that comprise this package, the contractor<br />
will have in place a suitable quality control and quality assurance program and an<br />
appropriate safety and health plan.<br />
6. The amount of the Price Proposal and the value of the Bidder’s outstanding incomplete<br />
contracts does not exceed the firm’s existing aggregate rating limit.<br />
7. The undersigned understands and agrees with the terms and conditions contained within the<br />
Form of Contract and Instructions to Bidders 1, Section III, Article 6: Times for<br />
Completion and Article 7: Liquidated Damages.<br />
MILESTONE<br />
TASK<br />
LIQUIDATED DAMAGE<br />
AMOUNT<br />
I.<br />
GC CONTRACT<br />
● Asbestos Abatement Complete<br />
$500.00 Per Calendar Day<br />
II.<br />
III.<br />
ALL PRIME CONTRACTS<br />
● Demolition Complete<br />
MECH/ EL/ PL CONTRACTS<br />
● Roughing Complete<br />
$500.00 Per Calendar Day<br />
$500.00 Per Calendar Day<br />
71
PRICE PROPOSAL – ENVELOPE 1<br />
MILESTONE<br />
TASK<br />
LIQUIDATED DAMAGE<br />
AMOUNT<br />
GC CONTRACT<br />
$500.00 Per Calendar Day<br />
IV.<br />
● Completion of GWB Installation<br />
V. ALL PRIME CONTRACTS<br />
$2,500.00 Per Calendar Day<br />
● Substantial Completion and NYC DOB Letter of Completion<br />
8. Where the bidder is unable to certify to any of the statements in this certification, the bidder<br />
shall explain below.<br />
____________________________________________________________________________<br />
____________________________________________________________________________<br />
____________________________________________________________________________<br />
____________________________________________________________________________<br />
_______________________________________________________________________<br />
____________________________________________________________________________<br />
____________________________________________________________________________<br />
____________________________________________________________________________<br />
____________________________________________________________________________<br />
_______________________________________________________________________<br />
____________________________________________________________________________<br />
__________________________________________________________________________<br />
72
PRICE PROPOSAL – ENVELOPE 1<br />
IN WITNESS WHEREOF, the bidder has caused this instrument to be signed, attested to<br />
and sealed.<br />
Bidder:<br />
(Legal Firm Name)<br />
By:<br />
(Signature)<br />
(Printed or Typed Name)<br />
Title: ______________________________________<br />
Address:_____________________________________<br />
_________________________________<br />
E9mail Address_________________<br />
Telephone No. _______<br />
Fax No. ____________<br />
Date:<br />
Witness: ___________________________________________<br />
Printed or Typed Name: _______________________________<br />
Date:_______________________________________________<br />
END OF PRICE PROPOSAL<br />
73
ATTACHMENT <strong>NO</strong>. 2<br />
GENERAL REQUIREMENTS – SECTION 01 11 17<br />
DRAWING LIST<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
GENERAL REQUIREMENTS – 01 11 17<br />
SECTION 01 11 17<br />
Drawing List<br />
QUEENS COLLEGE CONVERSION OF LABORATORIES<br />
Project Location: 6660 Kissena Blvd, Flushing, NY 11367<br />
Science Building: 2 nd Floor<br />
LIST OF DRAWINGS:<br />
Drawing Revision Date<br />
GENERAL DRAWINGS:<br />
G000.00 COVER SHEET 062512<br />
G001.00 GENERAL <strong>NO</strong>TES, SYMBOLS, AND BLDG CODES 091312<br />
ARCHITECTURAL DRAWINGS:<br />
A 001.00 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS 062512<br />
A 002.00 AREAS OF WORK PLAN 062512<br />
A100.00 SECOND FLOOR DEMOLITION PLANS 091312<br />
A110.00 CONSTRUCTION PLAN ROOMS B237, B241, B211 091312<br />
A111.00 CONSTRUCTION PLAN ROOMS B243, B245, B203 091312<br />
A112.00 CONSTRUCTION PLAN ROOMS D231, D231A 091312<br />
A210.00 REFLECTED CEILING PLAN ROOMS B237, B241, B211 062512<br />
A211.00 REFLECTED CEILING PLAN ROOMS B243, B245, B203 062512<br />
A212.00 REFLECTED CEILING PLAN ROOMS D231, D231A 062512<br />
A301.00 LADDER AND CEILING DETAILS 062512<br />
A302.00 PARTITION TYPES 062512<br />
A401.00 ENLARGED PLAN & ELEVATIONS LAB B237 062512<br />
A402.00 ENLARGED PLAN & ELEVATIONS LAB B241 062512<br />
A403.00 ENLARGED PLAN & ELEVATIONS LAB B243 062512<br />
A404.00 ENLARGED PLAN & ELEVATIONS LAB B245 091312<br />
A405.00 ENLARGED PLAN & ELEVATIONS PREP RM. B203 062512<br />
A406.00 ENLARGED PLAN & ELEVATIONS PREP RM. B211 091312<br />
A407.00 ENLARGED PLAN & ELEVATIONS LAB D231 062512<br />
A408.00 ENLARGED PLAN & ELEVATIONS ROOM D231A 062512<br />
A601.00 DOOR SCHEDULE & DOOR DETAILS 062512<br />
A701.00 FINISH PLANS AND SCHEDULES 062512<br />
HAZMAT ABATEMENT DRAWINGS:<br />
H001.00 SECOND FLOOR ABATEMENT PLANS 062512<br />
FIRE PROTECTION DRAWINGS:<br />
FP001.00 SPRINKLER <strong>NO</strong>TES, SYMBOLS, AND ABBREVIATIONS 091312<br />
FP100.00 FIRE PROTECTION BASEMENT FLOOR PLAN 062512<br />
FP101.00 SECOND FLOOR PLAN FIRE PROTECTION 091312<br />
FP400.00 FIRE PROTECTION RISER DIAGRAM 062512<br />
0111171
GENERAL REQUIREMENTS – 01 11 17<br />
FP500.00 DETAIL SHEET 062512<br />
PLUMBING DRAWINGS:<br />
P001.00 PLUMBING <strong>NO</strong>TES, SYMBOLS, AND ABBREVIATIONS 091312<br />
P100.00 2ND FLOOR PLUMBING DEMOLITION PLAN 1 OF 2 062512<br />
P101.00 2ND FLOOR PLUMBING DEMOLITION PLAN 2 OF 2 062512<br />
P102.00 2ND FLOOR PLUMBING PART PLAN 1 OF 3 062512<br />
P103.00 2ND FLOOR PLUMBING PART PLAN 2 OF 3 062512<br />
P104.00 2ND FLOOR PLUMBING PART PLAN 3 OF 3 062512<br />
P401.00 PLUMBING DOMESTIC WATER & LAB WASTE RISER DIAGRAMS 062512<br />
P402.00 PLUMBING COMPRESSED AIR, VACUUM, & GAS RISER DIAGRAMS 062512<br />
P500.00 PLUMBING DETAILS 1 OF 2 062512<br />
P501.00 PLUMBING DETAILS 2 OF 2 062512<br />
P601.00 PLUMBING SCHEDULE SHEET 062512<br />
MECHANICAL DRAWINGS:<br />
EN001.00 ENERGY CODE COMPLIANCE 062512<br />
M001.00 MECHANICAL LEGEND, ABBREVIATIONS, AND <strong>NO</strong>TES 062512<br />
M101.00 2 ND FLOOR MECHANICAL DEMOLITION 091312<br />
M102.00 2 ND FLOOR MECHANICAL – NEW WORK SHEET 1 062512<br />
M103.00 2 ND FLOOR MECHANICAL – NEW WORK SHEET 2 062512<br />
M104.00 2 ND FLOOR MECHANICAL – NEW WORK SHEET 3 062512<br />
M105.00 ROOF PART PLANS AND DETAILS 062512<br />
M401.00 AIR RISER DIAGRAMS 062512<br />
M402.00 LABORATORY CONTROLS DIAGRAM 062512<br />
M501.00 MECHANICAL DETAILS – 1 062512<br />
M502.00 MECHANICAL DETAILS – 2 062512<br />
M503.00 MECHANICAL DETAILS – 3 062512<br />
M601.00 MECHANICAL SCHEDULES 062512<br />
ELECTRICAL DRAWINGS:<br />
E001.00 ELECTRICAL SYMBOLS LIST, ABBREVIATIONS, AND <strong>NO</strong>TES 091312<br />
E100.00 2ND FLOOR LIGHTING PART PLANS DEMO 091312<br />
E110.00 2 ND FLOOR POWER & LOW VOLTAGE PART PLANS DEMO 091312<br />
E120.00 2 ND FLOOR LIGHTING PART PLANS 062512<br />
E130.00 2 ND FLOOR POWER & LOW VOLTAGE PART PLANS 091312<br />
E500.00 DETAILS 091312<br />
E600.00 ELECTRICAL RISER DIAGRAMS 091312<br />
E601.00 ELECTRICAL PANEL SCHEDULES 062512<br />
E602.00 ELECTRICAL PANEL SCHEDULES 062512<br />
FIRE ALARM SYSTEM DRAWINGS:<br />
FA001.00 SYMBOL LIST, GENERAL <strong>NO</strong>TES & RISER DIAGRAM 091312<br />
FA100.00 CELLAR FIRE ALARM PLAN 062512<br />
FA101.00 2 ND FLOOR FIRE ALARM PLAN 062512<br />
END OF DRAWING LIST<br />
0111172
ATTACHMENT <strong>NO</strong>. 3<br />
DWG. G001.00 (091312)<br />
GENERAL <strong>NO</strong>TES, SYMBOLS & BLDG. CODES<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
GENERAL <strong>NO</strong>TES<br />
APPLICABLE BUILDING CODES<br />
<strong>STV</strong><br />
D<br />
THE FOLLOWING <strong>NO</strong>TES SHALL APPLY THROUGHOUT. EXCEPTIONS ARE SPECIFICALLY <strong>NO</strong>TED ON EACH DRAWING.<br />
1. EACH CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE AS REQUIRED TO VERIFY THE DRAWINGS<br />
AND TO PERFORM THIS WORK AS PER CONTRACT DOCUMENTS. ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE SURVEY SHALL<br />
BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IMMEDIATELY. <strong>NO</strong> WORK SHALL PROCEED UNTIL THE DISCREPANCY HAS BEEN<br />
RESOLVED.<br />
2.DRAWINGS ARE <strong>NO</strong>T TO BE SCALED. USE DIMENSIONS ONLY. ALL DIMENSIONS ON THE DRAWINGS MUST BE VERIFIED AT THE SITE BY<br />
EACH CONTRACTOR BEFORE ORDERING ANY MATERIAL OR PERFORMING ANY WORK. ANY DISCREPANCIES IN THE DRAWINGS AND<br />
SPECIFICATIONS SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY. <strong>NO</strong> CHANGE TO THE DRAWINGS OR SPECIFICATIONS IS<br />
PERMITTED WITHOUT WRITTEN CONSENT OF THE ARCHITECT.<br />
3. THE CONTRACTOR SHALL, UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, SECURE AND PAY FOR ALL REQUIRED<br />
CONSTRUCTION PERMIT(S), FEES, LICENSE AND INSPECTIONS NECESSARY TO EXECUTE THE WORK IN FULL COMPLIANCE WITH ALL NYC<br />
APPLICABLE CODES AND REGULATIONS AND WITH THE CONTRACT DOCUMENTS.<br />
4. COORDINATION OF ALL WORK UNDER THIS CONTRACT SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED BY THE CONTRACT<br />
DOCUMENTS TO ENSURE THE QUALITY AND TIMELY COMPLETION OF THE WORK/PROJECT.<br />
5. EACH CONTRACTOR SHALL PERFORM ALL CUTTING AND PATCHING REQUIRED TO COMPLETE THE WORK OR TO MAKE ITS PARTS FIT<br />
TOGETHER PROPERLY WITHOUT COMPROMISING THE QUALITY OF THE WORK.<br />
THE FOLLOWING <strong>NO</strong>TES SHALL APPLY THROUGHOUT:<br />
1. WORK SHALL BE EXECUTED IN FULL COMPLIANCE WITH THE APPLICABLE PROVISIONS OF ALL LAWS, BYLAWS, STATUTES,<br />
ORDINANCES, CODES, RULES, REGULATIONS AND LAWFUL ORDERS OF PUBLIC AUTHORITIES BEARING ON THE PERFORMANCE AND<br />
EXECUTION OF THE WORK.<br />
2. THE WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING CODES AND STANDARDS.<br />
A. 2008 NEW YORK CITY BUILDING CODE.<br />
B. 2008 NEW YORK CITY FUEL GAS CODE.<br />
C. 2008 NEW YORK CITY MECHANICAL CODE.<br />
D. NEW YORK CITY PLUMBING CODE.<br />
E. NATIONAL FIRE PROTECTION ASSOCIATION (N.F.P.A. 72).<br />
F<br />
2011 NEW YORK CITY ELECTRICAL CODE<br />
G. UNDERWRITER LABORATORIES (UL DESIGN).<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
6. ALL EXISTING FIRE RATED CONDITIONS DISTURBED BY THE WORK SHALL BE RESTORED TO MATCH THE ORIGINAL FIRE RATED<br />
CONDITIONS.<br />
H. FEDERAL STATE / LOCAL AUTHORITIES HAVING JURISDICTION.<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
7. THE GC SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND PROTECTING ALL WORK DURING CONSTRUCTION AGAINST<br />
DAMAGE, BREAKAGE,COLLAPSE, DISTORTIONS, AND OFF ALIGNMENTS ACCORDING TO ALL APPLICABLE CODES AND STANDARDS AND<br />
PER BEST PRACTICES OF THE INDUSTRY. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR SHORING AND BRACING WITH<br />
CALCULATIONS SIGNED AND SEALED BY NEW YORK PROFESSIONAL ENGINEER.<br />
SPECIAL INSPECTIONS<br />
t 9146867102<br />
8. DURING CONSTRUCTION, TEMPORARY BAFFLES, PARTITIONS, ENCLOSURES, TO SEAL OPENINGS TO PREVENT DUST AND DIRT FROM<br />
FILTERING INTO OCCUPIED AREAS ARE TO BE PROVIDED BY THE GC.<br />
THE FOLLOWING SPECIAL INSPECTIONS REQUIRED IN ACCORDANCE WITH SECTION 27132 AND THE APPLICABLE<br />
SECTIONS OF THE BUILDING CODE ARE LISTED IN THE FOLLOWING TABLES:<br />
C<br />
9. THE CONTRACTOR SHALL KEEP THE WORK SITE FREE FROM DEBRIS AND ACCUMULATED REFUSE AND SHALL HAVE SOLE<br />
RESPONSIBILITY FOR PROTECTING ALL AREAS FROM ENTRY BY UNAUTHORIZED PARTIES. THE SITE SHALL BE LEFT BROOM CLEAN AT<br />
THE END OF EACH WORKING DAY.<br />
10. GENERAL CONTRACTOR SHALL COORDINATE THE INSTALLATION OF PLUMBING FIXTURES PRIOR TO THE CONSTRUCTION OF<br />
PARTITIONS BEHIND SUCH FIXTURES.<br />
11. ALL VERTICAL AND HORIZONTAL SHAFTS SHALL HAVE A MINIMUM FIRE RATING OF 2HOURS UNLESS REQUIRED OTHERWISE BY<br />
CODE.<br />
SPECIAL INSPECTION<br />
CODE SECTION<br />
FIRE ALARM BC 907 . BC 1704.13<br />
FIRE STOP, DRAFTSHOP, AND FIREBLOCK SYSTEM BC 1704.25<br />
MECHANICAL SYSTEMS BC 1704.15<br />
SPRINKLER SYSTEMS BC 1704.21<br />
1<br />
12. ALL LINTELS GREATER THAN 4'0" SHALL BE STRUCTURALLY SUPPORTED.<br />
ENERGY CODE COMPLIANCE INSPECTIONS BC 109.3.5<br />
13. ALL ELECTRICAL & MECHANICAL INDICATIONS ON ARCHITECTURAL DRAWINGS ARE FOR LOCATION PURPOSES ONLY.<br />
FIRE RESISTANCE RATED CONSTRUCTION BC 109.3.4<br />
14. THE GENERAL CONTRACTOR SHALL EXTEND ALL WALL FINISHES A MINIMUM OF 6" ABOVE SUSPENDED OR FURRED CEILINGS.<br />
15. ALL WORK SHALL BE INSTALLED SO THAT ALL PARTS THAT REQUIRE ACCESS ARE READILY ACCESSIBLE FOR INSPECTION,<br />
OPERATION, MAINTENANCE AND REPAIR.<br />
FINAL 28116.2.4.2, BC 109.5<br />
DIRECTIVE 14 OF 1975 AND 1 RCNY 10110<br />
ENERGY CODE PROGRESS INSPECTIONS<br />
16. EACH CONTRACTOR SHALL MAINTAIN FREE AND U<strong>NO</strong>BSTRUCTED ACCESS FROM ALL FLOORS AND ADJACENT SPACES INTO THE<br />
EXISTING FIRE STAIRS TO OUTSIDE OF THE BUILDING AT ALL TIMES.<br />
17. THE GENERAL CONTRACTOR SHALL PROVIDE BARRICADES AROUND WORK AREAS AS REQUIRED TO PREVENT STAFF, STUDENTS<br />
AND OTHER UNAUTHORIZED PERSONS FROM ENTERING THEREIN.<br />
HVAC AND SERVICE WATER HEATING EQUIPMENT<br />
HVAC AND SERVICE WATER HEATING SYSTEM CONTROLS<br />
DUCT PLENUM AND PIPING INSULATION AND SEALING<br />
(IB3) (IIB3)<br />
(IB4), (IIB4)<br />
(IB5) (IIB5)<br />
SEALS<br />
18. WHERE MANUFACTURERS NAMES AND PRODUCT NUMBERS ARE INDICATED ON THE DRAWINGS IT SHALL BE CONSTRUED TO MEAN<br />
THE ESTABLISHING OF QUALITY AND PERFORMANCE STANDARDS OF SUCH ITEMS. ALL OTHER PRODUCTS MUST BE SUBMITTED TO THE<br />
ARCHITECT FOR APPROVAL BEFORE THEY SHALL BE DEEMED EQUAL.<br />
INTERIOR LIGHTING POWER<br />
LIGHTING CONTROLS<br />
(IIC3)<br />
(IIC5)<br />
19. DIMENSIONS ON PLANS ARE INDICATED FROM SURFACE TO SURFACE BETWEEN WALLS, PARTITIONS AND OTHER ITEMS EXCLUSIVE<br />
OF FINISHES.<br />
20. EACH CONTRACTOR SHALL PATCH AND REPAIR ALL FLOORS, WALLS, CEILINGS, ETC. IN SPACES WHETHER IN SCOPE OR <strong>NO</strong>T THAT<br />
HAVE BEEN DAMAGED OR EXPOSED DUE TO WORK, REMOVALS OR TEMPORARY STORAGE AND FINISH THEM TO MATCH ADJOINING<br />
SURFACES.<br />
EXIT SIGNS<br />
MAINTENANCE INFORMATION<br />
(IIC6)<br />
(ID1),(IID1)<br />
OWNER WILL HIRE THE SPECIAL INSPECTION AGENCY OR ENGINEER AND ARCHITECT TO PERFORM THE SPECIAL<br />
INSPECTIONS.<br />
21. IF ANY UTILITIES OR SERVICES ARE INTERRUPTED DURING THE EXECUTION OF THE CONTRACT, IT IS THE RESPONSIBILITY OF EACH<br />
CONTRACTOR TO REROUTE AND/OR PROVIDE TEMPORARY SERVICE SO AS <strong>NO</strong>T TO DISRUPT ANY SERVICE TO THE BUILDING.<br />
EACH CONTRACTOR MUST <strong>NO</strong>TIFY THE CONSTRUCTION MANAGER TO ARRANGE THE SPECIAL INSPECTIONS AT LEAST<br />
SEVENTY TWO (72) HOURS PRIOR TO THE NEED FOR THE INSPECTION.<br />
B<br />
22. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ALL METHODS AND MEANS OF CONSTRUCTION AND PROVIDE ALL SAFEGUARDS<br />
TO INSURE SAFETY TO THE PUBLIC FOR THE DURATION OF THIS RE<strong>NO</strong>VATION PROJECT.<br />
23. WHERE EXISTING DOOR FRAMES ARE TO BE REPLACED, REMOVE PORTION OF EXISTING WALL IN ORDER TO REMOVE AND REINSTALL<br />
NEW DOOR FRAME AND JAMB ANCHOR, PATCH AND MATCH EXISTING WALL CONSTRUCTION AND FINISHES.<br />
SUMMARY OF WORK<br />
24. THE GENERAL CONTRACTOR SHALL REMOVE, PROTECT AND STORE ALL FURNITURE, HARDWARE, EQUIPMENTS AS DIRECTED BY THE<br />
OWNER.<br />
25. EACH CONTRACTOR SHALL MAINTAIN <strong>NO</strong>ISE CONTROL AT THE JOB SITE. CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH<br />
THE COLLEGE SCHEDULE AND ACTIVITIES.<br />
CONVERSION OF FIVE (5) LABORATORIES AND (3) PREP ROOMS<br />
The project consists of plans and specifications to convert five existing physics and astronomy laboratories into biology teaching laboratories at Queens<br />
College Science Building Rooms B237, B241, B243, B245, & D231. Renovation of three existing prep rooms is also included in the scope of work. The labs<br />
occupy approximately 4,321 sf and approximately 766 sf of prep space, broken down as follows:<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
26. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING / COVERING ALL EXISTING WINDOW UNITS FROM DUST/ DIRT AND<br />
CLEAN TO CURRENT WORKING CONDITIONS AS FOUND.<br />
27. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH COLLEGE FACILITIES REQUIREMENTS WHEN NEED ARISES TO DISCONNECT AND<br />
OR RELOCATE FIRE ALARM STROBES. THE EC SHALL PROVIDE CONTI<strong>NO</strong>US FIRE WATCH IF REQUIRED WHEN WORK IS EXECUTED ON THE<br />
FIRE ALARM SYSTEM.<br />
Lab Space<br />
B237 897sf<br />
B241 897sf<br />
B243 897sf<br />
B245 886sf<br />
D231 744sf<br />
QUEENS COLLEGE<br />
6660 Kissena Boulevard<br />
Flushing NY. 11367<br />
28. ALL HOT WORK ( WELDING, BRAZING, ETC) WILL REQUIRE COORDINATION, WRITTEN APPROVAL AND SIGN OFFS FROM COLLEGE<br />
PUBLIC SAFETY TO DEACTIVATE SMOKE DETECTORS WHILE WORKING AND <strong>NO</strong>TIFICATION WHEN COMPLETED ON A DAILY BASIS.<br />
29. AFTER ASBESTOS ABATEMENT PROCEDURES ARE COMPLETED, GENERAL CONTRACTOR TO REPLACE SEALANTS, INSULATION OR<br />
ANY OTHER ABATED MATERIAL WITH <strong>NO</strong>NASBESTOS MATERIAL IN ORDER TO ASSURE SYSTEMS ARE RESTORED TO GOOD WORKING<br />
CONDITION.<br />
30. WHERE EXISTING WALLS ARE TO BE PATCHED OR NEW FINISH AND BASE OF WALL ARE TO MATCH EXISTING ADJACENT FINISHES, DO<br />
SO FOR THE ENTIRE LENGHT OF THE WALL OR REFER TO FINISH SCHEDULE.<br />
31. GC TO OBSERVE QUEENS COLLEGE ACCEPTED PROCEDURES FOR WASTEOUT, INCLUDING EARLY DAY SERVICE BY CARTING<br />
COMPANY, QUICK REMOVAL OF MINI CONTAINERS FROM PEDESTRIAN AREAS, ETC.<br />
32. GENERAL CONTRACTOR TO MAINTAIN THE WORK AREAS UNDER NEGATIVE AIR PRESSURE TO MINIMIZE THE PROPAGATION OF DUST<br />
AND ODORS TO OCCUPIED AREAS OF THE BUILDING. RETURN AIR GRILLES LEADING TO BUILDING HVAC SYSTEMS ARE TO BE COVERED<br />
DURING WORK PERIODS AND WHEN MATERIALS ARE OFFGASSING.<br />
Lab Prep Space<br />
B211 357sf<br />
B203 357sf<br />
D231A 52sf<br />
Work required for this project will be performed under four (4) separate contracts:<br />
A. Contract No. CITYWCUCF010904GC: General Construction Work GC<br />
B. Contract No. CITYWCUCF010904MECH: Mechanical/ HVAC Work MECH<br />
C. Contract No. CITYWCUCF010904EL: Electrical Work EC<br />
D. Contract No. CITYWCUCF010904PL: Plumbing & Fire Protection Work PC<br />
E. Each Trade Contractor shall be responsible for performing the work items specified or shown in the Specifications and accompanying drawings<br />
issued as a part of its Contract, and shall coordinate its work with that of the other Contractors.<br />
F. Each Trade Contractor and their subcontractors are required to cooperate with the Owner, the Owner’s representatives, and other Contractors<br />
in regard to scheduling, storage, deliveries, and construction.<br />
1 91312 <strong>ADDENDUM</strong> # 1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
No. 2115419<br />
PAUL USURIELLO<br />
HECTOR ANDRADE<br />
JAMES HEMMERLY<br />
SANDRA BENJAMIN<br />
A<br />
1 2 3 4 5<br />
SHEET TITLE<br />
GENERAL<br />
<strong>NO</strong>TES,<br />
SYMBOLS &<br />
BLDG. CODES<br />
G001.00<br />
2<br />
of 65<br />
9/10/2012 2:15:52 PM
ATTACHMENT <strong>NO</strong>. 4<br />
DWG. A100.00(091312)<br />
SECOND FLOOR DEMOLITION PLANS<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
DEMOLITION <strong>NO</strong>TES<br />
<strong>STV</strong><br />
D<br />
7'<br />
7<br />
6<br />
5 4 3 2<br />
1. COORDINATE ALL REMOVAL WORK WITH NEW CONSTRUCTION.<br />
2. SEE MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION AND ASBESTOS ABATEMENT DWGS. FOR<br />
ADDITIONAL DEMOLITION INFORMATION.<br />
3. CONTRACTOR SHALL DISPOSE ALL EXISTING FURNITURE / EQUIPMENT AND SHALL COORDINATE WITH<br />
THE CONSTRUCTION MANAGER TO DETERMINE AS DIRECTED BY THE OWNER TO SALVAGED SPECIFIC<br />
FURNITURE/EQUIPMENT AND TURN THEM OVER TO OWNERTO BE STORED AT LOCATION DESIGNATED BY OWNER.<br />
4. REMOVE EXISTING VCT FLOORING AND WALL BASE INCLUDING MASTICS AND ADHESIVES IN ALL ROOMS IN SCOPE OF<br />
WORK, AND EITHER SHOT BLAST OR DIAMOND GRIND ALL FLOORS TO RECEIVE NEW EPOXY FLOORING.<br />
5. ALL EXISTING <strong>NO</strong>NFIXED LAB EQUIPMENT SHALL BE REMOVED BY QUEENS COLLEGE FACILITIES DEPARTMENT.<br />
9. REMOVE EXISTING ACOUSTICAL SUSPENDED CEILING AND ITS SUPPORTS IN ROOMS B211 & D231A<br />
10. ALL EXISTING BLACK BOARDS AND WHITE BOARDS TO BE REMOVED.<br />
1<br />
1<br />
1<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
11. GENERAL CONTRACTOR TO COORDINATE WITH ELECTRICAL CONTRACTOR FOR PROPER DISPOSAL<br />
OF ALL LIGHTING FIXTURES AND FLOURESCENT BULBS AND MECHANICAL CONTRACTOR FOR PROPER DISPOSAL<br />
OF THERMOSTATS SCHEDULED TO BE REMOVED. GENERAL CONSTRACTOR TO PROPERLY DISPOSE OF UNIVERSAL<br />
WASTE AND FLOURESCENT BULBS AS SPECIFIED IN SECTION 132860 OF THE CONTRACT SPECIFICATIONS.<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
PHYSICS LAB<br />
G'<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
D235<br />
31'3 1/2"<br />
H'<br />
DEMOLITION KEY <strong>NO</strong>TES<br />
C<br />
Room<br />
B215<br />
H<br />
1<br />
2<br />
EXISTING LAB BENCHES TO BE REMOVED.<br />
EXISTING DOORS AND FRAMES TO BE REMOVED<br />
3<br />
I<br />
3<br />
4<br />
EXISTING SINKS AND CABINETS TO BE REMOVED<br />
EXISTING FURNITURE AND EQUIPMENT TO BE REMOVED SERVICE CONNECTIONS TO BE REMOVED BY<br />
MECH, EC AND PC.<br />
1<br />
2<br />
1<br />
Biology Lab<br />
B237<br />
4<br />
2<br />
4<br />
5<br />
EXISTING SMARTBOARD TO BE REMOVED AND ALL ASSOCIATED MOUNTING FRAME AND HARDWARE.<br />
DEMOLITION KEY <strong>NO</strong>TES ARE TYPICAL FOR ALL LABS AND PREPARATION ROOMS.<br />
J<br />
B<br />
A<br />
2<br />
Corridor<br />
C001<br />
2<br />
2<br />
5'8" TYP.<br />
1<br />
1<br />
13'4" TYP.<br />
Biology Lab<br />
B241<br />
Biology Lab<br />
B243<br />
Biology Lab<br />
B245<br />
30'8 3/4"<br />
Corridor<br />
C002<br />
1<br />
4<br />
4<br />
3<br />
1<br />
3<br />
2<br />
2<br />
3<br />
2<br />
Prep. Room<br />
B211 4<br />
5<br />
Office<br />
B209<br />
Office<br />
B207<br />
4<br />
Prep. Room<br />
B203<br />
4<br />
1<br />
4<br />
Office<br />
B201<br />
Corridor<br />
C003<br />
K<br />
L<br />
M<br />
M'<br />
N<br />
O<br />
O'<br />
P<br />
Room<br />
D233<br />
Inst. Storage<br />
D233A<br />
5 4 3<br />
Corridor<br />
C002<br />
Biology Lab<br />
2<br />
D231<br />
4<br />
4<br />
4<br />
2'6" TYP.<br />
15'0" TYP.<br />
2<br />
Prep. Room<br />
Pipe Space<br />
D231A<br />
D227<br />
LAB<br />
D223<br />
Q<br />
R<br />
S<br />
T<br />
E<br />
A<br />
C<br />
B<br />
PROJECT IDENTIFICATION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
SEALS<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6660 Kissena Boulevard<br />
Flushing NY. 11367<br />
1 91312 <strong>ADDENDUM</strong> # 1<br />
MARK DATE DESCRIPTION<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
HECTOR ANDRADE<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
No. 2115419<br />
JAMES HEMMERLY<br />
1<br />
SECOND FL. DEMOLITION PLAN "AREA B"<br />
Q<br />
2<br />
SECOND FL. DEMOLITION PLAN "AREA D"<br />
D<br />
SECOND FLOOR<br />
DEMOLITION<br />
PLANS<br />
A100.00 1/8" = 1'0"<br />
0 4' 8' 16'<br />
A100.00 1/8" = 1'0"<br />
0 4' 8' 16'<br />
1 2 3 4 5<br />
KEY PLAN<br />
A100.00<br />
5<br />
of 65<br />
9/13/2012 2:17:32 PM
ATTACHMENT <strong>NO</strong>. 5<br />
DWG. A110.00(091312)<br />
CONSTRUCTION PLAN ROOMS B237, B241, & B211<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
6<br />
5 4 3 2<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
3'0"<br />
PHYSICS LAB<br />
D235<br />
34'0" EPOXY COUNTERTOP TYP.<br />
1'6"<br />
6'3" +/<br />
1<br />
8'0"<br />
Room<br />
B215<br />
H'<br />
H<br />
CONSTRUCTION <strong>NO</strong>TES<br />
1. REFER TO SHEET G001 FOR GENERAL ARCHITECTURAL <strong>NO</strong>TES.<br />
2. FOR DOOR SCHEDULE,DOOR TYPES AND DETAILS SEE DRAWINGS A601<br />
3. FOR FINISH SCHEDULE SEE DRAWING A701.<br />
4. FOR CASEWORK / EQUIPMENT SEE A400'S SERIES DRAWINGS.<br />
5. ALL DIMENSIONS ARE <strong>NO</strong>MINAL AND TO BE FIELD VERIFIED BY CONTRACTOR.<br />
6. AFTER REMOVAL OF EXIST. DUCTS, PIPES, CONDUITS WHICH PENETRATED EXIST.<br />
WALLS AND FLOOR SLABS, CONTRACTOR TO INFILL OPENINGS TO MATCH EXIST.<br />
MATERIAL AND FIRE RATING. "REFER TO SECTION 017329 OF THE GENERAL<br />
CONDITIONS FOR CUTTING AND PATCHING REQUIREMENTS"<br />
1<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
12'0" TYP.<br />
5'0" 5'0" 5'0"<br />
2<br />
4<br />
I<br />
7. FOR PARTITION TYPES SEE DRAWING A302<br />
8. EXISTING FLOOR SLAB TO BE PATCHED, REPAIRED, LEVELED AND PREPARED TO<br />
RECEIVED NEW FINISHES<br />
9. PATCH ALL HOLES AND OTHER UNPROTECTED OPENINGS IN EXISTING RATED<br />
SHAFTS. NEW PATCHES TO MATCH EXISTING FIRERATING OF ASSEMBLY.<br />
C<br />
B<br />
Corridor<br />
C001<br />
21'10" 21'9 1/4"<br />
5<br />
2<br />
5<br />
2'2"<br />
2'2"<br />
1'6"<br />
2'0"<br />
1'6" MIN.<br />
6'3 1/4"<br />
Biology Lab<br />
B237<br />
8'6"<br />
7'6"<br />
8'0"<br />
Biology Lab<br />
B241<br />
3<br />
4 A401.00<br />
2<br />
5<br />
6'2"<br />
2<br />
3'0" 5'0" 5'0" 5'0" 7'2 1/2" +/<br />
1'6" MIN.<br />
6<br />
12'6"<br />
4'0" TYP.<br />
7<br />
34'0"<br />
7'5 3/4"<br />
4'0" TYP.<br />
5 1<br />
7<br />
2'0"<br />
2<br />
5 A402.00<br />
3<br />
4<br />
8'0"<br />
3'8"<br />
3'7" +/<br />
2<br />
4<br />
1<br />
3'8 1/4"<br />
5'0"<br />
1'11 3/4"<br />
4<br />
3<br />
6"<br />
8'0"<br />
2'4"<br />
2 4<br />
3<br />
6 1/4"<br />
8'2"<br />
8'0"<br />
A406.00 6<br />
5<br />
1<br />
Prep. Room<br />
B211<br />
4'0" 3'11" 2'0"<br />
2<br />
A406.00 4<br />
3<br />
Office<br />
B209<br />
8'0"<br />
2'10"<br />
Corridor<br />
C003<br />
J<br />
K<br />
L<br />
1<br />
2<br />
3<br />
CONSTRUCTION KEY <strong>NO</strong>TES<br />
NEW SINK. SEE PLUMBING DRAWINGS.<br />
4 NEW EMERGENCY EYEWASH. SEE PLUMBING DRAWINGS.<br />
5<br />
NEW ADA SINK. SEE PLUMBING DRAWINGS.<br />
EMERGENCY SHOWER / EYEWASH WITH RECESSED MIXING VALVE, SEE PLUMBING DWGS.<br />
PATCH PORTIONS OF EXISTING WALLS & FLOORS AS REQUIRED AND FINISH<br />
TO MATCH EXISTING ADJACENT<br />
6 HIGH EFFICIENCY FUME HOOD, SEE MECH, PLUMB DRWGS.<br />
7 SMART BOARD, SEE ELECTRICAL DRWGS.<br />
8<br />
CUT NEW OPENING FOR HOLLOW METAL FRAME; PROVIDE SQUARE AND TRUE FRAMED<br />
OPENING; PATCH AND REPAIR WALL AS REQUIRED TO ALIGN WITH ADJACENT WALL<br />
SURFACES.<br />
SEALS<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6660 Kissena Boulevard<br />
Flushing NY. 11367<br />
Biology Lab<br />
B243<br />
SEE DWG. A111<br />
Office<br />
B207<br />
1 91312 <strong>ADDENDUM</strong> # 1<br />
MARK DATE DESCRIPTION<br />
ISSUE BLOCK<br />
A<br />
1<br />
CONSTRUCTION PLANS ROOMS B237, B241, B211<br />
A110.00 1/4" = 1'0"<br />
0 2' 4' 8'<br />
1 2 3 4 5<br />
A<br />
E C<br />
D<br />
KEY PLAN<br />
B<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
PAUL USURIELLO<br />
HECTOR ANDRADE<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
CONSTRUCTION<br />
PLAN ROOMS<br />
B237, B241 &<br />
B211<br />
A110.00<br />
6<br />
of 65<br />
No. 2115419<br />
JAMES HEMMERLY<br />
<strong>STV</strong> INC.<br />
9/10/2012 2:13:45 PM
ATTACHMENT <strong>NO</strong>. 6<br />
DWG. A111.00(091312)<br />
CONSTRUCTION PLAN ROOMS B243, B245, & B203<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
6<br />
5 4 3 2<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
Office<br />
B209<br />
CONSTRUCTION <strong>NO</strong>TES<br />
1. REFER TO SHEET G001 FOR GENERAL ARCHITECTURAL <strong>NO</strong>TES.<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
1'6"<br />
SEE DWG. A110<br />
1<br />
2'0"<br />
8'0"<br />
Office<br />
L<br />
2. FOR DOOR SCHEDULE,DOOR TYPES AND DETAILS SEE DRAWINGS A601<br />
3. FOR FINISH SCHEDULE SEE DRAWING A701.<br />
4. FOR CASEWORK / EQUIPMENT SEE A400'S SERIES DRAWINGS.<br />
5. ALL DIMENSIONS ARE <strong>NO</strong>MINAL AND TO BE FIELD VERIFIED BY CONTRACTOR.<br />
6. AFTER REMOVAL OF EXIST. DUCTS, PIPES, CONDUITS WHICH PENETRATED EXIST.<br />
WALLS AND FLOOR SLABS, CONTRACTOR TO INFILL OPENINGS TO MATCH EXIST.<br />
MATERIAL AND FIRE RATING. "REFER TO SECTION 017329 OF THE GENERAL<br />
CONDITIONS FOR CUTTING AND PATCHING REQUIREMENTS"<br />
7. FOR PARTITION TYPES SEE DRAWING A302<br />
1<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
B207<br />
8. EXISTING FLOOR SLAB TO BE PATCHED, REPAIRED, LEVELED AND PREPARED TO<br />
RECEIVED NEW FINISHES<br />
9. PATCH ALL HOLES AND OTHER UNPROTECTED OPENINGS IN EXISTING RATED<br />
SHAFTS. NEW PATCHES TO MATCH EXISTING FIRERATING OF ASSEMBLY.<br />
C<br />
21'9 3/4"<br />
5<br />
3'0" 5'0" 5'0" 5'0"<br />
9'2" +/<br />
2 4<br />
7"<br />
Corridor<br />
C003<br />
M<br />
M'<br />
CONSTRUCTION KEY <strong>NO</strong>TES<br />
B<br />
Corridor<br />
C001<br />
22'0 1/2"<br />
2<br />
1'10"<br />
2<br />
5<br />
7<br />
1'6" MIN.<br />
4<br />
12'0" TYP.<br />
4'0"<br />
12'6"<br />
6'4"<br />
Biology Lab<br />
B243<br />
2<br />
5 A403.00<br />
3<br />
4<br />
7'6"<br />
8'0"<br />
5'0" 5'0" 5'0"<br />
7<br />
3'8"<br />
6'3" +/<br />
1<br />
4'4"<br />
1<br />
3<br />
1<br />
1<br />
2<br />
1<br />
6"<br />
1'9"<br />
4<br />
2<br />
A405.00 6<br />
3<br />
5<br />
2<br />
A405.00<br />
4<br />
Prep. Room<br />
3<br />
B203<br />
5'3" 8'2"<br />
8'5"<br />
4'0" 3'8" 2'0"<br />
8'0"<br />
N<br />
O<br />
O'<br />
1<br />
2<br />
3<br />
NEW SINK. SEE PLUMBING DRAWINGS.<br />
4 NEW EMERGENCY EYEWASH. SEE PLUMBING DRAWINGS.<br />
5<br />
NEW ADA SINK. SEE PLUMBING DRAWINGS.<br />
EMERGENCY SHOWER / EYEWASH WITH RECESSED MIXING VALVE, SEE PLUMBING DWGS.<br />
PATCH PORTIONS OF EXISTING WALLS & FLOORS AS REQUIRED AND FINISH<br />
TO MATCH EXISTING ADJACENT<br />
6 HIGH EFFICIENCY FUME HOOD, SEE MECH, PLUMB DRWGS.<br />
7 SMART BOARD, SEE ELECTRICAL DRWGS.<br />
8<br />
CUT NEW OPENING FOR HOLLOW METAL FRAME; PROVIDE SQUARE AND TRUE FRAMED<br />
OPENING; PATCH AND REPAIR WALL AS REQUIRED TO ALIGN WITH ADJACENT WALL<br />
SURFACES.<br />
SEALS<br />
PROJECT IDENTIFICATION<br />
3'0"<br />
3'0"<br />
4'0" TYP.<br />
1'10"<br />
8'6"<br />
Biology Lab<br />
B245<br />
7'6"<br />
2<br />
5 A404.00<br />
3<br />
4<br />
4'0" 4'4 3/4"<br />
3'8"<br />
2 4<br />
8'0"<br />
Office<br />
B201<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6660 Kissena Boulevard<br />
Flushing NY. 11367<br />
7<br />
8<br />
2'0"<br />
P<br />
A<br />
1<br />
A111.00<br />
8<br />
5<br />
Corridor<br />
C002<br />
CONSTRUCTION PLANS ROOMS B243, B245, B203<br />
1/4" = 1'0"<br />
0 2' 4' 8'<br />
1 2 3 4 5<br />
A<br />
E C<br />
D<br />
KEY PLAN<br />
B<br />
1 91312 <strong>ADDENDUM</strong> # 1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
HECTOR ANDRADE<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
CONSTRUCTION<br />
PLAN ROOMS<br />
B243, B245 &<br />
B203<br />
A111.00<br />
7<br />
of 65<br />
No. 2115419<br />
JAMES HEMMERLY<br />
9/10/2012 2:13:46 PM
ATTACHMENT <strong>NO</strong>. 7<br />
DWG. A112.00(091312)<br />
CONSTRUCTION PLAN ROOMS D231 & D231A<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
5 4 3<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
P<br />
CONSTRUCTION <strong>NO</strong>TES<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
Corridor<br />
C002<br />
1. REFER TO SHEET G001 FOR GENERAL ARCHITECTURAL <strong>NO</strong>TES.<br />
2. FOR DOOR SCHEDULE,DOOR TYPES AND DETAILS SEE DRAWINGS A601<br />
3. FOR FINISH SCHEDULE SEE DRAWING A701.<br />
4. FOR CASEWORK / EQUIPMENT SEE A400'S SERIES DRAWINGS.<br />
5. ALL DIMENSIONS ARE <strong>NO</strong>MINAL AND TO BE FIELD VERIFIED BY CONTRACTOR.<br />
1<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
C<br />
2'7"<br />
2'0"<br />
9<br />
3'0"<br />
1<br />
5<br />
12'0" TYP.<br />
Q<br />
6. AFTER REMOVAL OF EXIST. DUCTS, PIPES, CONDUITS WHICH PENETRATED EXIST.<br />
WALLS AND FLOOR SLABS, CONTRACTOR TO INFILL OPENINGS TO MATCH EXIST.<br />
MATERIAL AND FIRE RATING. "REFER TO SECTION 017329 OF THE GENERAL<br />
CONDITIONS FOR CUTTING AND PATCHING REQUIREMENTS"<br />
7. FOR PARTITION TYPES SEE DRAWING A302<br />
8. EXISTING FLOOR SLAB TO BE PATCHED, REPAIRED, LEVELED AND PREPARED TO<br />
RECEIVED NEW FINISHES<br />
9. PATCH ALL HOLES AND OTHER UNPROTECTED OPENINGS IN EXISTING RATED<br />
SHAFTS. NEW PATCHES TO MATCH EXISTING FIRERATING OF ASSEMBLY.<br />
4'4"<br />
1'6"<br />
8'6"<br />
CONSTRUCTION KEY <strong>NO</strong>TES<br />
1<br />
NEW SINK. SEE PLUMBING DRAWINGS.<br />
7'6"<br />
Biology Lab<br />
7<br />
D231<br />
5'0"<br />
4'4"<br />
5'0"<br />
EPOXY COUNTER TOP 25'2" VIF.<br />
2<br />
3<br />
4 NEW EMERGENCY EYEWASH. SEE PLUMBING DRAWINGS.<br />
5<br />
NEW ADA SINK. SEE PLUMBING DRAWINGS.<br />
EMERGENCY SHOWER / EYEWASH WITH RECESSED MIXING VALVE, SEE PLUMBING DWGS.<br />
PATCH PORTIONS OF EXISTING WALLS & FLOORS AS REQUIRED AND FINISH<br />
TO MATCH EXISTING ADJACENT<br />
6 HIGH EFFICIENCY FUME HOOD, SEE MECH, PLUMB DRWGS.<br />
7 SMART BOARD, SEE ELECTRICAL DRWGS.<br />
8<br />
CUT NEW OPENING FOR HOLLOW METAL FRAME; PROVIDE SQUARE AND TRUE FRAMED<br />
OPENING; PATCH AND REPAIR WALL AS REQUIRED TO ALIGN WITH ADJACENT WALL<br />
SURFACES.<br />
SEALS<br />
R<br />
B<br />
8'0"<br />
4'4"<br />
2<br />
PROJECT IDENTIFICATION<br />
6<br />
3<br />
4<br />
A407.00<br />
3<br />
5<br />
1'9"<br />
2<br />
4<br />
3'0"<br />
6'2" 3'0" 1 1/4"<br />
6'4"<br />
S<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6660 Kissena Boulevard<br />
Flushing NY. 11367<br />
10<br />
1<br />
2<br />
1'6" MIN.<br />
A<br />
A408.00<br />
3<br />
4<br />
Prep. Room<br />
D231A<br />
T<br />
E<br />
A<br />
C<br />
B<br />
1 91312 <strong>ADDENDUM</strong> # 1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
HECTOR ANDRADE<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
No. 2115419<br />
JAMES HEMMERLY<br />
1<br />
A112.00 1/4" = 1'0"<br />
CONSTRUCTION PLANS ROOMS D231 & D231A<br />
1 2 3 4 5<br />
D<br />
KEY PLAN<br />
CONSTRUCTION<br />
PLAN ROOMS<br />
D231 & D231A<br />
A112.00<br />
8<br />
of 65<br />
9/12/2012 4:49:59 PM
ATTACHMENT <strong>NO</strong>. 8<br />
DWG. A404.00(091312)<br />
ENLARGED PLAN & ELEVATIONS LAB B245<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
C13<br />
EXIST.<br />
ACCESS<br />
PANEL<br />
E18<br />
E4<br />
C2<br />
C2<br />
C2<br />
C1<br />
CASEWORK SCHEDULE LAB B245<br />
ITEM<br />
# DESCRIPTION WIDTH DEPTH QTY<br />
PROVIDED<br />
BY<br />
INSTALLED<br />
BY<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
C<br />
2'10 1/2" 1'7 1/2" 2'6"<br />
2'10" 1'6" 2'6"<br />
C8<br />
C30<br />
3<br />
A404.00<br />
C1<br />
C23<br />
C29<br />
C2 C2 C1 C1 C2 C2 C1 C1 C2 C2 C1 C1<br />
C17<br />
E11<br />
SOUTH ELEVATION LAB B245<br />
1/4" = 1'0"<br />
C17<br />
C25<br />
C5<br />
C16<br />
C17<br />
C9<br />
C27<br />
C6<br />
C17<br />
C5<br />
3'0" 1'8" 2'6"<br />
C30<br />
C28<br />
C22<br />
C1<br />
1'6" 2'6"<br />
3'0"<br />
8'6"<br />
3'0" 1'8" 2'6"<br />
C5<br />
5<br />
A404.00<br />
C27<br />
C17<br />
C16<br />
C7 C7 C7<br />
WEST ELEVATION LAB B245<br />
1/4" = 1'0"<br />
1'6"<br />
C1 C1 C13<br />
C30 C22 C30 C23<br />
2'10 1/2" 1'7 1/2" 2'6"<br />
C4<br />
8'6"<br />
C1 UPPER CABINETDOUBLE GLASS 2' 6" 1' 0" 9 GC GC<br />
DOOR<br />
C2 UPPER CABINETDOUBLE GLASS 2' 0" 1' 0" 8 GC GC<br />
DOOR<br />
C4 BASE CABINET ADA 2' 6" 1' 5" 7 GC GC<br />
C5 BASE CABINETDOUBLE DOOR & 4' 0" 1' 9 5/8" 2 GC GC<br />
2 DRAWERS<br />
C6 BASE CABINET SINGLE DOOR & 2' 0" 1' 10" 1 GC GC<br />
DRAWER<br />
C7 BASE CABINET 1DOOR 1' 6" 1' 9 5/8" 24 GC GC<br />
PULLOUT WRITING TABLET ADA<br />
C8 BASE CABINET ADA SINK 3' 0" 2' 0" 1 GC GC<br />
C9 AUDIO VISUAL CABINET 2' 6" 1' 10" 1<br />
C13 UPPER CABINETDOUBLE GLASS 3' 0" 1' 0" 1 GC GC<br />
DOOR<br />
C16 COUNTER TOP 34' 0" 1' 6" 1 GC GC<br />
C17 COUNTER TOP 12' 0" 4' 0" 4 GC GC<br />
C19 BASE CABINETDOUBLE DOOR & 5' 0" 1' 9 3/4" 1 GC GC<br />
2 DRAWERS<br />
C22 COUNTER TOP 5' 0" 2' 0" 1 GC GC<br />
C23 COUNTER TOP 3' 0" 2' 0" 1 GC GC<br />
C25 COUNTER TOP 4' 0" 2' 0" 1 GC GC<br />
C27 COUNTER TOP 6' 0" 2' 0" 1 GC GC<br />
C28 EPOXY DROPIN SINK 2' 0" 1' 4" 1 GC GC / PC<br />
C29 EPOXY ADA DROPIN SINK 1' 2" 10" 1 GC GC /PC<br />
C30 SINK FAUCET 2 GC PC<br />
68<br />
1<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
2<br />
C4<br />
A404.00<br />
C7 C7 C4 C4 C7 C7 C4 C4 C7<br />
<strong>NO</strong>RTH ELEVATION LAB B245<br />
1/4" = 1'0"<br />
6<br />
C7<br />
C4<br />
C4<br />
C7<br />
C7<br />
E5 C19<br />
E5<br />
C19<br />
C8<br />
5 4 3<br />
4<br />
A404.00 1/4" = 1'0"<br />
EAST ELEVATION LAB B245<br />
SPECIALTY EQUIPMENT SCHEDULE LAB B245<br />
ITEM<br />
# DESCRIPTION SIZE QTY<br />
INSTALLED<br />
BY<br />
PROVIDED<br />
BY<br />
E4 SMART Board Interactive 6'5 1/2"W X 4'1 1/2" H 1 EC EC<br />
Whiteboard Model 685ix<br />
E5 PLANT INCUBATOR 31" x 46" x 46" 2 GC COLLEGE<br />
E11 REFRIGERATOR 33" X 35" x 84" 1 GC COLLEGE<br />
E18 BRACKET MOUNTED FIRE<br />
EXTINGUISHER<br />
2'6" 1<br />
5<br />
SEALS<br />
33'10 1/2"<br />
B<br />
C16<br />
Prep. Room<br />
N<br />
ELEVATION <strong>NO</strong>TES<br />
1. FOR DOOR TYPES & SCHEDULE SEE DWG A601<br />
PROJECT IDENTIFICATION<br />
C4 C4 C4 C4 C4 C4<br />
C4<br />
C1 C2 C2 C1 C1 C2 C2 C1 C1 C2 C2 C1 C1<br />
B203<br />
2. FOR FINISH SCHEDULE SEE DWG A701<br />
3. FOR ELECTRICAL DEVICES, SEE ELECTRICAL DRAWINGS<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
C7<br />
C7<br />
C7 C7<br />
C7 C7<br />
C7 C7<br />
C17 C17 C17 C17<br />
E5<br />
E5<br />
C30<br />
4. FOR CASEWORK AND EQUIPMENT SHOWN SEE SCHEDULE FOR<br />
RESPONSIBLE PROVIDERS AND INSTALLATION PARTIES<br />
5. PROVIDE WALL BLOCKING AS NECESSARY AT ALL INSTALLED<br />
CASEWORK. SEE MANUFACTURER'S SPECIFICATIIONS.<br />
QUEENS COLLEGE<br />
6660 Kissena Boulevard<br />
Flushing NY. 11367<br />
C7<br />
C7<br />
C7<br />
C7<br />
C7<br />
C7<br />
C7<br />
C7<br />
C28<br />
O<br />
6. FOR GAS, VACUUM AND COMPRESSED AIR UTILITIES TO BE PROVIDED, SEE<br />
PLUMBING DRAWINGS.<br />
C1<br />
A<br />
Corridor<br />
C001<br />
1/4" = 1'0"<br />
C7<br />
C7<br />
C2<br />
C5<br />
C2<br />
C7<br />
C27C6<br />
8'6"<br />
ENLARGED PLAN LAB B245<br />
C7<br />
C9<br />
Biology Lab<br />
B245<br />
Corridor<br />
C002<br />
E4<br />
C7<br />
C7<br />
C25<br />
5<br />
C5<br />
4'0"<br />
2<br />
A404.00<br />
3<br />
4<br />
E11<br />
C7<br />
C7<br />
E18<br />
C19<br />
C22<br />
C1<br />
C29<br />
C8<br />
C13<br />
C23<br />
EXIST.<br />
ACCESS<br />
PANEL<br />
1 2 3 4 5<br />
0<br />
C30<br />
5'0"<br />
3'0"<br />
2' 4' 8'<br />
O'<br />
P<br />
E<br />
A<br />
C<br />
D<br />
KEY PLAN<br />
B<br />
1 91312 <strong>ADDENDUM</strong> # 1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
HECTOR ANDRADE<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
ENLARGED<br />
PLAN &<br />
ELEVATIONS<br />
LAB B245<br />
A404.00<br />
17<br />
of 65<br />
No. 2115419<br />
JAMES HEMMERLY<br />
9/13/2012 12:13:16 PM
ATTACHMENT <strong>NO</strong>. 9<br />
DWG. A406.00(091312)<br />
ENLARGED PLAN & ELEVATIONS PREP RM B211<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
C1<br />
C13<br />
C2<br />
CASEWORK SCHEDULE PREP ROOM. B211<br />
ITEM # DESCRIPTION WIDTH DEPTH QTY<br />
PROVIDED<br />
BY<br />
INSTALLED<br />
BY<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
C<br />
3<br />
A406.00<br />
2'6" 2'0" 2'6"<br />
C10<br />
C11 C11 C11<br />
SOUTH ELEVATION PREP. RM. B211<br />
1/4" = 1'0"<br />
10'9 1/4"<br />
5<br />
A406.00<br />
C33<br />
C23<br />
C30<br />
C11<br />
E14 E7 C8<br />
WEST ELEVATION PREP. RM. B211<br />
1/4" = 1'0"<br />
E18 C1 C1 C1 C1 C1<br />
C1 UPPER CABINETDOUBLE 2' 6" 1' 0" 5 GC GC<br />
GLASS DOOR<br />
C2 UPPER CABINETDOUBLE 2' 0" 1' 0" 1 GC GC<br />
GLASS DOOR<br />
C5 BASE CABINETDOUBLE 4' 0" 1' 9 5/8" 6 GC GC<br />
DOOR & 2 DRAWERS<br />
C8 BASE CABINET ADA SINK 3' 0" 2' 0" 1 GC GC<br />
C10 DESK 4' 0" 2' 6" 1 COLLEGE GC<br />
C11 TALL STORAGE CABINET 3' 0" 1' 4" 5 GC GC<br />
C13 UPPER CABINETDOUBLE 3' 0" 1' 0" 1 GC GC<br />
GLASS DOOR<br />
C20 COUNTER TOP 8' 0" 2' 0" 1 GC GC<br />
C21 COUNTER TOP 8' 2" 4' 0" 1 GC GC<br />
C23 COUNTER TOP 3' 0" 2' 0" 1 GC GC<br />
C29 EPOXY ADA DROPIN SINK 1' 2" 10" 1 GC GC / PC<br />
C30 SINK FAUCET 1 GC PC<br />
C33 STAINLESS STEEL PEG 2' 6" 2' 6" 1 GC GC<br />
BOARD<br />
26<br />
1<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
2<br />
C33<br />
C30<br />
C23<br />
C29<br />
C8<br />
E1 C11 C11<br />
<strong>NO</strong>RTH ELEVATION PREP. RM. B211<br />
10'9 1/4"<br />
4<br />
C11<br />
C20<br />
C5 C5 C10<br />
EAST ELEVATION PREP. RM. B211<br />
4'6" 2'6"<br />
SPECIALTY EQUIPMENT SCHEDULE PREP ROOM B211<br />
ITEM # DESCRIPTION SIZE QTY PROVIDED BY INSTALLED BY<br />
E1 DELI REFRIGERATOR 52" X 32" X 78" 1 COLLEGE GC<br />
E7 DISH WASHER 24" x 24" x 35" 1 COLLEGE GC/ PC/ EC<br />
E14 ICE MAKER 32" X 28" 1 COLLEGE GC/ PC<br />
E15 BENCH TOP INCUBATOR 24" X 26" X 40" 1 COLLEGE GC<br />
E16 DRYING OVEN 30"X22"X32" 1 COLLEGE GC<br />
E18 BRACKET MOUNTED FIRE 2'6" 1 GC GC<br />
EXTINGUISHER<br />
6<br />
SEALS<br />
A406.00<br />
1/4" = 1'0"<br />
A406.00<br />
1/4" = 1'0"<br />
3 2<br />
ELEVATION <strong>NO</strong>TES<br />
B<br />
Biology Lab<br />
B237<br />
C33<br />
C30<br />
C29<br />
Room<br />
B215<br />
E1<br />
Prep. Room<br />
C11<br />
C11<br />
Corridor<br />
I<br />
E1<br />
E16<br />
C21<br />
3'0"<br />
C11<br />
1. FOR DOOR TYPES & SCHEDULE SEE DWG A601<br />
2. FOR FINISH SCHEDULE SEE DWG A701<br />
3. FOR ELECTRICAL DEVICES, SEE ELECTRICAL DRAWINGS<br />
4. FOR CASEWORK AND EQUIPMENT SHOWN SEE SCHEDULE FOR<br />
RESPONSIBLE PROVIDERS AND INSTALLATION PARTIES<br />
5. PROVIDE WALL BLOCKING AS NECESSARY AT ALL INSTALLED<br />
CASEWORK. SEE MANUFACTURER'S SPECIFICATIIONS.<br />
6. FOR GAS, VACUUM AND COMPRESSED AIR UTILITIES TO BE PROVIDED, SEE<br />
PLUMBING DRAWINGS.<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6660 Kissena Boulevard<br />
Flushing NY. 11367<br />
A<br />
Biology Lab<br />
B241<br />
1<br />
A406.00<br />
C8<br />
C23<br />
C2<br />
E7<br />
C13<br />
E14<br />
A406.00 6<br />
C21<br />
5<br />
C11 C11 C11<br />
1/4" = 1'0"<br />
E16<br />
C5<br />
C5<br />
B211<br />
2<br />
A406.00<br />
3<br />
Office<br />
B209<br />
E15<br />
C5<br />
C5<br />
4<br />
C5<br />
C5<br />
C1<br />
C1<br />
C20<br />
C1<br />
C1<br />
C10<br />
C1<br />
E18<br />
ENLARGED PLAN LAB B211<br />
0<br />
C003<br />
2' 4' 8'<br />
J<br />
K<br />
6<br />
A406.00<br />
1 2 3 4 5<br />
C5<br />
C5<br />
ISLAND LAB BENCH @ RM B211<br />
1/4" = 1'0"<br />
E<br />
A<br />
C<br />
D<br />
KEY PLAN<br />
B<br />
1 91312 <strong>ADDENDUM</strong> # 1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
HECTOR ANDRADE<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
ENLARGED<br />
PLAN &<br />
ELEVATIONS<br />
PREP. RM. B211<br />
A406.00<br />
19<br />
of 65<br />
No. 2115419<br />
JAMES HEMMERLY<br />
9/13/2012 12:13:16 PM
ATTACHMENT <strong>NO</strong>. 10<br />
DWG. FP001.00(091312)<br />
SPRINKLER <strong>NO</strong>TES, SYMBOLS AND<br />
ABBREVIATIONS<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
AD<br />
AFF<br />
ATS<br />
CL OR C L<br />
CLG<br />
CONT<br />
CP<br />
DIM<br />
DN<br />
LIST OF ABBREVIATIONS<br />
ACCESS DOOR<br />
ABOVE FINISH FLOOR<br />
AUTOMATIC TRANSFER SWITCH<br />
CENTER LINE<br />
CEILING<br />
CONTINUATION<br />
CONTROL PANEL<br />
DIMENSION<br />
PIPE DOWN THROUGH FLOOR<br />
EXIST SP<br />
LIST OF SYMBOLS<br />
EXISTING SPRINKLER PIPING<br />
NEW SPRINKLER DISTRIBUTION PIPING<br />
PIPE UP OR RISE<br />
PIPE DN OR DROP<br />
CAP<br />
TEST AND DRAIN<br />
SHUT OFF VALVE (BUTTERFLY OR GATE)<br />
NYC SPRINKLER <strong>NO</strong>TES<br />
1. AUTOMATIC SPRINKLER SYSTEM SHALL COMPLY WITH SEC. 903 & APPENDIX Q OF NYC BUILDING CODE & NFPA 13&2002.<br />
2. CONSTRUCTION DOCUMENTS FOR STANDPIPE SYSTEM SHALL CONTAIN PLANS THAT INCLUDE THE INFORMATION AND<br />
DATA LISTED IN SEC. 903.1.2 OF NYC BUILDING CODE.<br />
3. APPROVED AUTOMATIC SPRINKLER SYSTEM IN NEW BUILDINGS AND STRUCTURES SHALL BE PROVIDED ON THE LOCATIONS<br />
DESCRIBED IN SEC. 903.2 OF NYC BUILDING CODE.<br />
4. AUTOMATIC SPRINKLER SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SEC. 903.3.1 THROUGH 903.3.7<br />
OF NYC BUILDING CODE.<br />
5. WHERE THE PROVISIONS OF NYC BUILDING CODE REQUIRE THAT A BUILDING OR PORTION THERE OF BE EQUIPPED THROUGHOUT<br />
WITH AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SEC. 903.3.1.1, SPRINKLER SHALL BE INSTALLED THROUGHOUT<br />
IN ACCORDANCE WITH NFPA 13 AS MODIFIED IN APPENDIX Q EXCEPT AS PROVIDED IN SEC. 903.3.1.1.1 OF NYC BUILDING CODE.<br />
6. AUTOMATIC SPRINKLERS SHALL <strong>NO</strong>T BE REQUIRED IN THE ROOMS OF AREAS WHICH ARE LISTED IN 903.3.1.1.1 OF NYC BUILDING<br />
CODE AS LONG AS AN APPROVED AUTOMATIC FIRE DETECTION SYSTEM IN ACCORDANCE WITH SEC. 907.2 AND AN ALTERNATIVE<br />
EXTINGUISHING SYSTEM IN ACCORDANCE INSTALLED IN ACCORDANCE WITH SEC. 903.3.1 THROUGH WITH SEC. 904.<br />
7. SPRINKLERS SHALL <strong>NO</strong>T BE OMITTED FROM ANY ROOM MERELY BECAUSE IT IS DAMP, OF FIRE&RESISTANCE&RATED CONSTRUCTION<br />
OR CONTAINS ELECTRICAL EQUIPMENT AS PER SEC. 903.3.1.1.1 OF THE NYC BUILDING CODE.<br />
SPECIAL INSPECTIONS<br />
THE FOLLOWING SPECIAL INSPECTIONS REQUIRED IN ACCORDANCE<br />
WITH SECTION 28&132 AND THE APPLICABLE SECTIONS OF<br />
THE BUILDING CODE ARE LISTED IN THE FOLLOWING TABLES:<br />
& FIRE STOPPING BC 1704.25<br />
& SPRINKLER SYSTEMS BC 1704.21<br />
THE CONTRACTOR MUST <strong>NO</strong>TIFY THE ARCHITECT OR<br />
ENGINEER FOR SPECIAL INSPECTION AT LEAST<br />
72 HOURS BEFORE THE SPECIFIC WORK COMMENCES.<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 973&240&1800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
DR<br />
DRAIN<br />
UNION<br />
8. WHERE AUTOMATIC SPRINKLER SYSTEM ARE REQUIRED BY NYC BUILDING CODE, QUICK&RESPONSE OR RESIDENTIAL AUTOMATIC<br />
SPRINKLERS SHALL BE INSTALLED IN THE AREAS LISTED SEC. 903.3.2 OF NYC BUILDING CODE.<br />
t 914&686&7102<br />
C<br />
DROP<br />
DWG<br />
EL<br />
EX OR EXIST<br />
FCVA<br />
FD<br />
FHV<br />
PIPE DROPPING BETWEEN FLOORS<br />
DRAWING<br />
ELEVATION<br />
EXISTING<br />
FLOOR CONTROL VALVE ASSEMBLY<br />
FLOOR DRAIN<br />
FIRE HOSE VALVE<br />
#<br />
SPRINKLER FLOOR CONTROL VALVE ASSEMBLY; FCVA<br />
<strong>NO</strong>DE (SPRINKLER HYDRAULIC CALCULATIONS)<br />
RECESSED PENDANT SPRINKLER HEAD<br />
UPRIGHT SPRINKLER HEAD<br />
POINT OF NEW CONNECTION<br />
9. AUTOMATIC SPRINKLERS SHALL BE INSTALLED WITH DUE REGARD TO OBSTRUCTIONS THAT WILL DELAY ACTIVATION OR OBSTRUCT<br />
THE WATER DISTIBUTION PATTERN, AUTOMATIC SPRINKLERS SHALL BE INSTALLED IN OR UNDER COVERED KIOSKS, DISPLAYS,<br />
BOOTH, CONCESSION STANDS, OR EQUIPMENT THAT EXCEEDS 4 FEET IN WIDTH <strong>NO</strong>T LESS THAN 3 FOOT CLEARANCE SHALL BE<br />
MAINTAINED BETWEEN AUTOMATIC SPRINKLERS AND TOP OF FILES OF COMBUSTIBLE FIBERS SEC. 903.3.3 OF NYC BUILDING CODE.<br />
10. WATER SUPPLIES FOR AUTOMATIC SPRINKLER SYSTEM SHALL COMPLY WITH SEC. 903.3.5 OF NYC BUILDING CODE AND SEC. 903.3.1<br />
THE POTABLE WATER SUPPLY SHALL BE PROTECTED AGAINST BACK FLOW IN ACCORDANCE WITH THE REQUIREMENTS OF<br />
SEC. 903.3.5 THE NYC PLUMBING CODE, AND RULES OF THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION.<br />
11. ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER SYSTEM, PUMPS, TANKS, WATER LEVELS AND<br />
TEMPERATURES, CRITICAL AIR PRESSURES AND WATER&FLOW SWITCHES ON ALL SPRINKLER SYSTEM SHALL BE ELECTRICALLY<br />
SUPERVISED<br />
BY THE FIRE ALARM SYSTEM AS PER SEC. 903.4 OF THE NYC BUILDING CODE.<br />
SPRINKLER SYSTEM INFORMATION<br />
BUILDING OCCUPANCY CLASSIFICATION<br />
GROUP: BUSINESS (CLASSROOMS)<br />
SPRINKLER HEADS<br />
MANUFACTURER: RELIABLE AUTOMATIC SPRINKLER CO.<br />
FIN FL<br />
FP<br />
FSP<br />
FINISHED FLOOR<br />
FIRE PROTECTION<br />
FIRE STANDPIPE<br />
TS<br />
TAMPER SWITCH (OR VALVE)<br />
12. APPROVED SUPERVISED INDICATING CONTROL VALVES SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE RISER<br />
ON EACH FLOOR IN HIGH&RISE BUILDINGS AS PER SEC. 903.4.3 OF THE NYC BUILDING CODE.<br />
13. THE DOCUMENTS OR PORTIONS THERE OF LISTED IN CHAPTER 2 OF NFPA 13&2002 ARE REFERENCED WITHIN NFPA&13<br />
AND SHALL BE CONSIDERED PART OF THE REQUIREMENT OF THIS DOCUMENT.<br />
SPRINKLER MODEL: G4A (BSA 587&75&SA) CONCEALED TYPE<br />
TYPE: CONCEALED QUICK RESPONSE<br />
ORIFICE SIZE: 1/2" TEMPERATURE RATING:<br />
ORDINARY 165° F<br />
INV EL<br />
INVERT ELEVATION<br />
14. OCCUPANCY CLASSIFICATION SHALL COMPLY WITH CHAPTER 5 OF NFPA 13&2002.<br />
SPRINKLER MODEL: GFR (MEA 258&93&E)<br />
B<br />
HVAC<br />
HEATING, VENTILATION & AIR CONDITIONING<br />
MAX<br />
MAXIMUM<br />
MIN<br />
MINIMUM<br />
NTS<br />
<strong>NO</strong>T TO SCALE<br />
OS&Y<br />
OUTSIDE SCREW & YOKE<br />
PLBG<br />
PLUMBING<br />
PSI<br />
POUNDS PER SQUARE INCH<br />
RCV<br />
RISER CONTROL VALVE<br />
RISE<br />
PIPE RISING BETWEEN FLOORS<br />
RM<br />
ROOM<br />
SPEC<br />
SPECIFICATIONS<br />
SPR, SP<br />
SPDR<br />
SB<br />
TS<br />
SPRINKLER<br />
SPRINKLER DRAIN<br />
SLEEVED BEEM CUT.<br />
TAMPER SWITCH<br />
TYP<br />
TYPICAL<br />
UP<br />
PIPE RISING THROUGH FLOOR<br />
V<br />
VICTAULIC<br />
W/ WITH<br />
GENERAL <strong>NO</strong>TES<br />
1. CONTRACTOR SHALL CHECK AND VERIFY THE EXACT LOCATION OF ALL PIPE<br />
PENETRATIONS AND MAKE CERTAIN THERE ARE <strong>NO</strong> OBSTRUCTIONS AND<br />
INTERFERENCES.<br />
2. CONTRACTOR SHALL REFER TO AND COORDINATE WITH<br />
ARCHITECTURAL/STRUCTURAL DRAWINGS AND WORK FOR EXACT LOCATION OF<br />
ALL FIRE PROTECTION PIPING/FHV.<br />
3. ALL PIPES PENETRATED THROUGH WALLS AND FLOORS SHALL BE PROVIDED WITH<br />
REQUIRED OPENINGS, SLEEVES, SEALS AND PACKINGS. REFER TO STRUCTURAL<br />
DRAWINGS FOR CONCRETE PADS.<br />
4. FIRE PROTECTION: REMOVAL AND RECONNECTION OF EXISTING PIPING MUST BE<br />
DONE BY A LICENSED FIRE PROTECTION CONTRACTOR AND FILED WITH DOB<br />
AS THE FIRE PROTECTION WORK TYPE AS PER NYCPC.<br />
5. FIRE PROTECTION DEMOLITION SHALL BE COORDINATED WITH THE PROJECT<br />
MANAGER.<br />
6. CONTRACTOR SHALL COORDINATE ALL SHUTDOWNS WITH COLLEGE OPERATING STAFF<br />
AS PER SPECIFICATION SECTION 211313 (WET PIPE SPRINKLER)<br />
15. PROTECTION REQUIREMENTS FOR COMMODITIES SHALL BE IN ACCORDACNE WITH SEC. 5.6.1.2 OF NFPA 13&2002.<br />
16. REQUIREMENTS FOR CORRECT USE OF SPRINKLER SYSTEM COMPONENTS SHALL COMPLY WITH CHAPTER 6 OF NFPA 13&2002.<br />
17. THE K&FACTOR, RELATIVE DISCHARGE, AND MARKING IDENTIFICATION FOR SPRINKLERS HAVING DIFFERENT OFFICE SIZES SHALL<br />
BE IN ACCORDANCE WITH TABLE 6.2.3.1 OF NFPA 13&2002.<br />
18. LARGE DROP AND ESFR SPRINKLERS SHALL HAVE A MINIMUM <strong>NO</strong>MINAL K&FACTOR OF 11.2 WITH SEC. 6.2.3.5 OF NFPA 13&2002.<br />
19. AUTOMATIC SPRINKLERS SHALL HAVE THEIR FRAME DEFLECTOR COATING MATERIALS, OR LIQUID BULB COLORED<br />
IN ACCORDANCE WITH THE REQUIREMENTS OF TABLE 6.2.5.1 OF NFPA 13&2002.<br />
20. LISTED CORROSION RESISTANT SPRINKLER SHALL BE INSTALLED IN LOCATIONS WHERE CHEMICALS, MOISTURE, OR OTHER<br />
CORROSIVE VAPORS SUFFICIENT TO CAUSE CORROSION OF SUCH DEVICES EXIST WITH SEC. 6.2.6.1 OF NFPA 13&2002.<br />
21. ALL CONTROL, DRUM, AND TEST CONNECTION VALVES SHALL BE PROVIDED WITH PERMANENTLY MARKED WEATHERPROOF<br />
METAL OR ACID PLASTIC IDENTIFICATION SIGNS. SEC. 6.7.4.1 OF NFPA 13&2002.<br />
22. THE MAXIMUM FLOOR AREA OR ANY ONE FLOOR TO BE PROTECTED BY A SINGLE RISER FROM A CONTROL VALVE AND ALARM DEVICE SHALL<br />
COMPLY WITH SEC. 8.2.1 OF NFPA 13&2002.<br />
23. WHERE CIRCUMSTANCES REQUIRE THE USE OF OTHER THAN ORDINARY TEMPERATURE&RATED SPRINKLERS, STANDARD RESPONSE<br />
SPRINKLERS SHALL BE PERMITTED TO BE USED SEC. 8.3.3 OF NFPA 13&2002.<br />
24. WHEN EXISTING LIGHT HAZARD SYSTEMS ARE CONVERTED TO USE QUICK&RESPONSE OR RESIDENTIAL SPRINKLERS ALL SPRINKLERS IN A<br />
COMPARTMENTED SPACE SHALL BE CHANGED. SEC. 8.3.3.4 OF NFPA 13&2002.<br />
25. SPRINKLERS SHALL BE LOCATED, SPACED AND POSITIONED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 8.5 OF NFPA 13&2002.<br />
26. PROTECTION AREAS AND MAXIMUM SPACING FOR EACH HAZARD SHALL COMPLY WITH TABLE B.B.2.2.1 (A) (B) (C) (D) OF NFPA 13&2002.<br />
27. REQUIREMENTS OF STAGES AREA PROTECTION SHALL COMPLY WITH SEC. 8.14.15 OF NFPA 13&2002.<br />
28. DRAIN CONNECTIONS FOR SYSTEMS SUPPLY RISERS SHALL BE SIZED AS SHOWN IN TABLE 8.15.2.4.2 OF APPENDIX Q&NYC BUILDING<br />
CODE.<br />
29. TYPES OF HANGERS SHALL BE IN ACCORDANCE WITH THE REQUIREMENT OF SEC. 9.1 OF NFPA 13&2002.<br />
30. MAXIMUM DISTANCE BETWEEN HANGERS SHALL BE IN COMPLIANCE WITH TABLE 9.2.2.1 OF NFPA 13&2002.<br />
TYPE: UPRIGHT OR PENDENT QUICK RESPONSE<br />
ORIFICE SIZE: 1/2" TEMPERATURE RATING:<br />
ORDINARY 165° F<br />
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY CALCULATED TO<br />
MEET THE FOLLOWING CRITERIA IN ACCORDANCE WITH THE NEW YORK<br />
CITY BUILDING DEPARTMENT AND NFPA STANDARD #13:<br />
OCCUPANCY:<br />
AREA OF APPLICATION:<br />
DENSITY:<br />
COVERAGE PER SPRINKLER:<br />
# OF SPRINKLER CALCULATED:<br />
MINIMUM FLOW FOR ANY SPRINKLER HEAD:<br />
HYDRAULIC CALCULATION RESULTS: SECOND FLOOR<br />
WATER FLOW REQUIRED: 277.30 GPM<br />
REQUIRED PRESSURE: 43.80 PSI<br />
HYDRANT FLOW TEST DATA<br />
LIGHT HAZARD<br />
1,500 SQ. FT.<br />
0.10 GPM/SQ. FT.<br />
VARIES (225 SQ. FT. MAX)<br />
16<br />
15 GPM<br />
LOCATION: 1ST HYDRANT ON MELBOURNE AVENUE WEST OF 150TH STREET<br />
TEST DATE: 8/13/2012 AT 8:50 AM<br />
TEST DATA:<br />
FLOW TEST =1000 GPM<br />
STATIC PRESSURE = 55 PSI<br />
RESIDUAL PRESSURE = 52 PSI<br />
1<br />
SEALS<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
66&60 Kissena Boulevard<br />
Flushing NY. 11367<br />
31. THE WATER SUPPLY FOR SPRINKLERS SHALL BE DETERMINED BY DENSITY/AREA CURVE, FIGURE 11.2.3.1.5 OF NFPA 13&2002.<br />
32. HYDRAULIC DESIGN AREA REDUCTION FOR QUICK RESPONSE SPRINKLERS SHALL COMPLY WITH FIGURE 11.2.3.2.3.1 OF NFPA 13&2002.<br />
APPLICABLE BUILDING CODES<br />
33. TYPE OF SPRINKLER HEAD IN GENERAL STORAGE SHALL COMPLY WITH SEC. 11.2.3.8 OF NFPA 13&2002.<br />
34. MINIMUM OPERATING PRESSURE OF ANY SPRINKLER SHALL BE 7 PSI SEC. 14.4.4.6.1 OF NFPA 13&2002.<br />
35. NUMBER OF WATER SUPPLY FOR SPRINKLER SYSTEM SHALL COMPLY WITH SEC. 15.1.1 OF NFPA 13&2002 AND APPENDIX Q OF NYC BD.<br />
THE FOLLOWING <strong>NO</strong>TES SHALL APPLY THROUGHTOUT:<br />
1. WORK SHALL BE EXECUTED IN FULL COMPLIANCE WITH<br />
THE APPLICABLE PROVISIONS OF ALL LAWS, BY&LAWS, STATUTES,<br />
ORDINANCES, CODES, RULES, REGULATIONS AND LAWFUL<br />
ORDERS OF PUBLIC AUTHORITIES BEARING ON THE<br />
PERFORMANCE AND EXECUTION OF THE WORK.<br />
2. THE WORK SHALL COMPLY WITH THE REQUIREMENTS<br />
OF THE FOLLOWING CODES AND STANDARDS.<br />
A. NEW YORK UNIFORM CONSTRUCTION CODE AND ICC/ANSI 117.1<br />
B.NFPA 13&2002 AND APPENDIX Q OF NYC BD.<br />
1 9.13.12 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
No. 2115419<br />
PAUL USURIELLO<br />
K.ROBINSON<br />
L.MATLICK<br />
SANDRA BENJAMIN<br />
A<br />
C. 2008 BUILDING CODE OF THE CITY OF NEW YORK.<br />
D. FEDERAL STATE / LOCAL AUTHORITIES HAVING JURISDIICTION.<br />
1 2 3 4 5<br />
SHEET TITLE<br />
SPRINKLER<br />
<strong>NO</strong>TES<br />
SYMBOLS AND<br />
ABBREVIATIONS<br />
FP&001.00<br />
25<br />
of 65<br />
9/13/2012 9:56:14 AM
ATTACHMENT <strong>NO</strong>. 11<br />
DWG. FP101.00(091312)<br />
SECOND FLOOR PLAN FIRE PROTECTION<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
D<br />
14 13' 13 12<br />
11 10 10' 9 8 7' 7 6<br />
AREA OF APPLICATION<br />
.10GPM / 1500SQ FT.<br />
LIGHT HAZARD<br />
MOST REMOTE AREA<br />
1 2<br />
Biology Lab<br />
B237<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
20<br />
1 1/4" SPR<br />
21<br />
31<br />
5 4 3 2<br />
22<br />
23<br />
4" SPR<br />
2" SPR<br />
1<br />
4 3<br />
1 1/4" SPR<br />
1 1/2" SPR<br />
10 9<br />
1 1/4" SPR<br />
8<br />
PHYSICS<br />
B215<br />
13' # 4 3/32"<br />
1 1/4" SPR<br />
7<br />
H<br />
I<br />
<strong>STV</strong><br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
1 1/4" SPR<br />
5 6<br />
1 1/4" SPR<br />
11 12<br />
35<br />
1 1/4" SPR<br />
Biology Lab<br />
B241<br />
24<br />
4" SPR<br />
2" SPR<br />
4" SPR<br />
16 1 1/2" SPR 15<br />
34<br />
30 29<br />
33<br />
28<br />
1 1/4" SPR<br />
14<br />
32<br />
Preparation room<br />
B211<br />
1 1/4" SPR<br />
13<br />
12' # 0"<br />
J<br />
K<br />
t 973#240#1800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 914#686#7102<br />
1 1/4" SPR 1 1/4" SPR 1 1/4" SPR 1 1/4" SPR<br />
C<br />
Office<br />
B209<br />
Corridor<br />
C003<br />
L<br />
Corridor<br />
C001<br />
1 1/4" SPR 1 1/4" SPR<br />
4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
Office<br />
B207<br />
1 1/4" SPR<br />
Biology Lab<br />
B243<br />
1 1/4" SPR<br />
4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
M<br />
M'<br />
1 1/4" SPR<br />
Preparation room<br />
B203<br />
N<br />
SEALS<br />
4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
Biology Lab<br />
1 1/4" SPR<br />
O<br />
1 1/4" SPR<br />
B245<br />
1 1/4" SPR<br />
4" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
O'<br />
B<br />
24A<br />
24A<br />
4" SPR<br />
P<br />
PROJECT IDENTIFICATION<br />
4" SPR<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
4" SPR<br />
4"SPR.DN.<br />
Q<br />
QUEENS COLLEGE<br />
66#60 Kissena Boulevard<br />
Flushing NY. 11367<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
25<br />
25<br />
3" SPR<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
1 9.13.12 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
A<br />
Biology Lab<br />
D231<br />
1 1/4" SPR<br />
1 1/4" SPR<br />
3" SPR<br />
1 1/4" SPR<br />
3" SPR<br />
R<br />
S<br />
E<br />
A<br />
C<br />
B<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
SHEET TITLE<br />
No. 2115419<br />
PAUL USURIELLO<br />
K.ROBINSON<br />
L.MATLICK<br />
SANDRA BENJAMIN<br />
FIRE PROTECTION SECOND<br />
FLOOR PLAN<br />
1/8" = 1'#0"<br />
8'<br />
1 2 3 4 5<br />
1 1/4" SPR<br />
Prep. Room<br />
D231A<br />
1 1/4" SPR<br />
T<br />
D<br />
KEY PLAN<br />
SECOND FLOOR<br />
PLAN FIRE<br />
PROTECTION<br />
FP#101.00<br />
9/13/2012 9:15:42 AM
ATTACHMENT <strong>NO</strong>. 12<br />
DWG. P001.00(091312)<br />
PLUMBING <strong>NO</strong>TES, SYMBOLS AND<br />
ABBREVIATIONS<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
D<br />
<strong>STV</strong><br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ADA<br />
AFF<br />
CL OR CL<br />
CLG<br />
CO<br />
CONT<br />
LIST OF ABBREVIATIONS<br />
AMERICAN DISABILITIES ACT<br />
ABOVE FINISH FLOOR<br />
CENTER LINE<br />
CEILING<br />
CLEAN OUT<br />
CONTINUATION<br />
CW<br />
HW<br />
LG<br />
LW<br />
LWV<br />
CA<br />
LIST OF SYMBOLS<br />
COLD WATER CW<br />
HOT WATER HW<br />
LAB GAS LG<br />
LAB WASTE LW<br />
LAB WASTE VENT LWV<br />
COMPRESSED AIR CA<br />
GENERAL <strong>NO</strong>TES<br />
1. ALL GAS, VENT, HOT AND COLD WATER PIPING ARE AT CEILING OR IN<br />
HUNG CEILING, EXCEPT IN PIPE SPACES OR WHERE OTHERWISE<br />
<strong>NO</strong>TED.<br />
2. CONTRACTOR SHALL CHECK AND VERIFY THE EXACT LOCATION OF ALL<br />
PIPE PENETRATIONS AND MAKE CERTAIN THERE ARE <strong>NO</strong> OBSTRUCTIONS<br />
AND INTERFERENCES.<br />
3. CONTRACTOR SHALL REFER TO AND COORDINATE WITH ARCHITECTURAL<br />
DRAWINGS AND WORK FOR EXACT LOCATION OF ALL PLUMBING<br />
FIXTURES.<br />
4. ALL PIPES PENETRATED THROUGH WALLS AND FLOORS SHALL BE<br />
PROVIDED WITH REQUIRED OPENINGS, SLEEVES, SEALS AND PACKINGS.<br />
REFER TO STRUCTURAL DRAWINGS FOR CONCRETE PADS.<br />
BUILDING DEPARTMENT PLUMBING <strong>NO</strong>TES<br />
ALL PLUMBING WORK SHALL MEET THE REQUIREMENTS OF TITLE 28 NEW YORK CITY<br />
PLUMBING CODE (NYCPC) AND NEW YORK CITY FUEL GAS CODE (NYCFC).<br />
1. PROTECTION OF PIPING AS OUTLINED IN SECTION PC 305 SHALL BE PROVIDED<br />
AS REQUIRED.<br />
2. ALL PIPING AND MATERIALS SHALL BE AS DIRECTED IN SECTION PC 605.<br />
3. PIPING JOINTS AND CONNECTIONS SHALL BE AS APPROVED IN SECTION PC 605.<br />
4. CONSTRUCTION, QUANTITIES, DEVICES, FIXTURES, FAUCETS, VALVES AND<br />
FACILITIES FOR THE DISABLED SHALL BE AS OUTLINED IN SECTION PC 404.<br />
5. TRAPS AND CLEA<strong>NO</strong>UTS SHALL BE AS PER SECTION PC 1002 AND PC 708<br />
ACCORDINGLY.<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
C<br />
CU FT<br />
CW<br />
DIA<br />
DIM<br />
DN<br />
DROP (DR)<br />
DWG<br />
DI<br />
DW<br />
EEW<br />
EL<br />
EMS<br />
FD<br />
FIN FL<br />
GPM<br />
HW<br />
CUBIC FEET<br />
COLD WATER<br />
DIAMETER<br />
DIMENSION<br />
PIPE DOWN THRU FLOOR<br />
PIPE DROPPING BETWEEN FLOORS<br />
DRAWING<br />
DEIONIZED WATER<br />
DISH WASHER<br />
EMERGENCY EYE WASH<br />
ELEVATION<br />
EMERGENCY SHOWER<br />
FLOOR DRAIN<br />
FINISHED FLOOR<br />
GALLON PER MINUTE<br />
HOT WATER<br />
VA<br />
FD<br />
VACUUM VA<br />
PIPE UP OR RISE<br />
PIPE DN OR DROP<br />
CAP<br />
CLEA<strong>NO</strong>UT CO<br />
WALL CLEA<strong>NO</strong>UT WCO<br />
EXISTING PIPING<br />
DEMOLITION (EXISTING BE REMOVED)<br />
SHUT OFF VALVE (GATE<br />
OR BUTTERFLY)<br />
CHECK VALVE<br />
STOP SHUTOFF VALVE (BALL )<br />
FLOOR DRAIN FD<br />
POINT OF NEW CONNECTION<br />
POINT OF DISCONNECT<br />
5. PLUMBING: REMOVAL AND RECONNECTION OF SANITARY FIXTURES MUST<br />
BE DONE BY A LICENSED MASTER PLUMBER AND FILED WITH DOB AS<br />
THE PLUMBING WORK TYPE AS PER NYCPC 2008.<br />
6. PLUMBING DEMOLITION SHALL BE COORDINATED BETWEEN BUILDING<br />
FACILITIES, GENERAL CONTRACTOR AND ALL TRADES ON THIS PROJECT.<br />
7. PROVIDE DRAINS AT ALL LOW POINTS<br />
8. PROVIDE VENTS AT ALL HIGH POINTS<br />
9. ALL PLUMBING FIXTURES SHALL BE INSTALLED BY THE PLUMBING<br />
CONTRACTOR. SCIENCE SINKS ARE PROVIDED WITH THE MILL WORK<br />
REFER TO ARCHITECTURAL DRAWINGS FOR THIS FIXTURES.<br />
10. PLUMBING CONTRACTOR SHALL PROVIDE TEMPORARY SERVICE TO KEEP<br />
EQUIPMENT THAT IS <strong>NO</strong>T IN CONTRACT ON LINE. PLUMBING CONTRACTOR<br />
SHALL FIELD VERIFY THE LOCATIONS OF THESE EXISTING EQUIPMENT AND<br />
<strong>NO</strong>TIFY THE COLLEGE PRIOR TO ANY SHUTDOWN OF SYSTEM.<br />
11. IF THE COLLEGE GRANTS SHUTDOWNS ONLY IN OFF HOURS, THERE SHALL BE<br />
<strong>NO</strong> PREMIUM TIME ADDITIONS TO THE CONTRACT.<br />
12. CONTRACTOR SHALL VERIFY THAT ALL RISER CONTROL VALVE FOR DOMESTIC<br />
WATER, GAS, COMPRESSED AIR AND VACUUM PIPING ARE FULLY OPERABLE<br />
PRIOR TO ANY AND ALL RISER SHUT DOWN FOR THE PURPOSE OF DEMOLITION<br />
AND OR NEW WORK. IF RISER CONTROL VALVES CAN<strong>NO</strong>T SHUTOFF AND ISOLATE<br />
THE DESIGNATED RISERS COMPLETELY. THE CONTRACTOR MUST PROVIDE<br />
OPTIONAL PRICE FOR THE REMOVAL AND REPLACEMENT OF EACH VALVE THAT IS<br />
I<strong>NO</strong>PERABLE. THIS SHOULD BE ADDED IN THE BID COST.<br />
PLUMBING DEMOLITION <strong>NO</strong>TES<br />
1. ALL EXISTING SYSTEMS SHALL BE LEFT IN PERFECT WORKING ORDER<br />
UPON COMPLETION OF ALL NEW WORK.<br />
6. CONSTRUCTION AND SPACING OF HANGERS AND SUPPORTS SHALL BE AS<br />
DIRECTED IN SECTION PC 308.<br />
7. WATER SUPPLY SYSTEM, VALVES, TESTS SHALL BE AS DIRECTED IN<br />
CHAPTER 6. VALVES SHALL BE PROVIDED AT RISERS AND ELSEWHERE AS PER<br />
SECTION PC 606.<br />
8. SANITARY DRAINAGE PIPING, SIZING, GRADING AND OFFSETS SHALL BE AS<br />
OUTLINED IN CHAPTER 7.<br />
9. VENT SIZING, GRADING, CONNECTIONS, LOCATIONS AND OFFSETS SHALL BE<br />
AS DIRECTED IN CHAPTER 9.<br />
10. ALL PLUMBING FIXTURES SHALL COMPLY WITH LOCAL LAW 86/2005<br />
GREEN BUILDING STANDARDS OR CHAPTER 4 SECTION PC 401.3 <br />
WATER CONSERVATION.<br />
11. MATERIALS, ASSEMBLIES, FORMS AND METHODS OF CONSTRUCTION SHALL<br />
BE APPROVED BY BOARD OF STANDARDS AND APPEALS OF THE CITY OF<br />
NEW YORK AND CONTRACTOR SHALL PROVIDE OTCR NUMBER OF<br />
SAME PURCHASED AND APPROVED FOR INSTALLATION.<br />
12. CONTRACTOR SHALL RETAIN A LICENSED PROFESSIONAL ENGINEER TO<br />
PERFORM ALL REQUIRED SPECIAL INSPECTIONS. SAME SHALL BE<br />
FILED WITH THE DEPARTMENT OF BUILDING.<br />
13. ALL HOT WATER PIPING TO BE PROVIDED WITH 1 INCH INSULATION<br />
14. GAS PIPING, MATERIAL, SIZING, OFFSET AND INSTALLATION SHALL<br />
BE AS OUTLINED IN THE NYC FUEL GAS CODE<br />
SEALS<br />
B<br />
IM<br />
IW<br />
LG<br />
LV<br />
LW<br />
ICE MAKER<br />
INDIRECT WASTE<br />
LABORATORY NATURAL GAS<br />
LABORATORY VACUUM<br />
LABORATORY (ACID) WASTE<br />
P<br />
X<br />
1<br />
P<br />
PLBG RISER<br />
DETAIL NUMBER<br />
2. EXACT SIZES AND LOCATIONS OF ALL EXISTING PIPING SHALL BE<br />
VERIFIED ON THE JOB.<br />
3. <strong>NO</strong> REMOVED EXISTING PIPING SHALL BE REUSED UNLESS OTHERWISE<br />
INDICATED.<br />
4. THE CONTRACTOR SHALL SUBMIT TO THE ARCHITECT FOR APPROVAL,<br />
PRIOR TO INSTALLATION, COMPLETE LAYOUT DRAWINGS INDICATING ALL<br />
PIPING SIZING.<br />
5. ALL EXISTING PIPING <strong>NO</strong>T SPECIFICALLY INDICATED TO BE REMOVED<br />
SHALL REMAIN AS IS.<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
LWV<br />
MGCV<br />
MTD<br />
NTS<br />
PLBG<br />
PSI<br />
RISE<br />
RM<br />
S, SAN<br />
ST<br />
TMV<br />
TW<br />
LABORATORY (ACID) WASTE VENT<br />
MASTER GAS CONTROL VALVE<br />
MOUNTED<br />
<strong>NO</strong>T TO SCALE<br />
PLUMBING<br />
POUND SQUARE PER INCH<br />
PIPE RISING BETWEEN FLOORS<br />
ROOM<br />
SANITARY<br />
SEDIMENT TRAP<br />
THERMOSTATIC MIXING VALVE<br />
TEMPERED WATER<br />
6. ANY AND ALL REQUIRED DEMOLITION WORK TO BE PERFORMED ABOVE<br />
EXISTING SUSPENDED CEILINGS AND FURRED OUT WALLS SHALL BE DONE<br />
AT THE TIME WHEN THE EXISTING CEILINGS AND FURRED OUT WALLS ARE<br />
REMOVED BY THE GENERAL CONTRACTOR.<br />
7. ALL EQUIPMENT AND INSTALLATIONS MUST BE EQUAL TO THE STANDARDS<br />
OF THE BASE BUILDING. ANY DEVIATION FROM BUILDING STANDARDS WILL<br />
BE PERMITTED ONLY IF INDICATED OR SPECIFIED ON THESE PLANS AND<br />
SPECIFICATIONS, AND APPROVED.<br />
8. TO ENSURE CONTINUOUS OPERATION, MAKE ALL NECESSARY TEMPORARY<br />
CONNECTIONS BETWEEN NEW AND EXISTING WORK. ALL COSTS<br />
RESULTING FROM TEMPORARY SHUTDOWNS SHALL BE BORNE BY THIS<br />
CONTRACTOR.<br />
9. EXISTING PIPING SHALL BE CUT, REMOVED AND CAPPED AS INDICATED<br />
ON DRAWINGS, UNLESS OTHERWISE <strong>NO</strong>TED.<br />
10. DURING CONSTRUCTION. STANDPIPE SYSTEMS REQUIRED DURING<br />
CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS SHALL BE<br />
PROVIDED IN ACCORDANCE WITH BUILDING CODE OF THE CITY OF NEW<br />
YORK 2008, SECTION 3303.8<br />
11. ALL OPENINGS CREATED AS A RESULT OF THE DEMOLITION WORK SHALL BE<br />
FILLED IN TO MATCH EXISTING CONSTRUCTION BY PLUMBING CONTRACTOR.<br />
1<br />
QUEENS COLLEGE<br />
6660 Kissena Boulevard<br />
Flushing NY. 11367<br />
1 9.13.12 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
2115419<br />
PAUL USURIELLO<br />
K.Robinson<br />
L.Matlick<br />
SANDRA BENJAMIN<br />
A<br />
TYP<br />
TYPICAL<br />
UP<br />
PIPE RISING THRU FLOOR<br />
1 2 3 4 5<br />
SHEET TITLE<br />
PLUMBING<br />
<strong>NO</strong>TES,<br />
SYMBOLS AND<br />
ABBREVIATIONS<br />
P001.00<br />
37<br />
of 65<br />
9/13/2012 9:11:29 AM
ATTACHMENT <strong>NO</strong>. 13<br />
DWG. M101.00(091312)<br />
2 ND FLOOR MECHANICAL DEMOLITION<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
DEMOLITION GENERAL <strong>NO</strong>TES<br />
<strong>STV</strong><br />
D<br />
1<br />
1. COORDINATE ALL DEMOLITION WORK AND ANY NECESSARY<br />
SYSTEM SHUTDOWNS WITH THE GENERAL CONTRACTOR AND<br />
OWNER.<br />
2. ALL EQUIPMENT AND DEVICES <strong>NO</strong>T INDCATED TO BE<br />
DEMOLISHED ARE EXISTING TO REMAIN.<br />
3. ALL OPENINGS CREATED AS A RESULT OF THE DEMOLITION<br />
WORK SHALL BE FILLED&IN TO MATCH EXISTING<br />
CONSTRUCTION BY MECHANICAL CONTRACTOR.<br />
4. ALL WORK ON THIS DRAWING BY MECHANICAL CONTRACTOR,<br />
UNLESS OTHERWISE <strong>NO</strong>TED.<br />
5. DEMOLISH ALL PNEUMATIC TUBING, MECHANICAL CONTROL<br />
PANELS AND ASSOCIATED CONTROL DEVICES WITHIN B237,<br />
B241, B243, B245, B211, B203, D231, D231A.<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 973&240&1800<br />
C<br />
7 6<br />
300 CFM<br />
CORRIDOR<br />
C001<br />
20x5<br />
LAB<br />
B237<br />
LAB<br />
B241<br />
13ø<br />
14ø<br />
13ø<br />
14ø<br />
250 CFM<br />
(TYP FOR 6)<br />
250 CFM<br />
(TYP FOR 6)<br />
5<br />
24X14 UP, 24X12 DN (ETR)<br />
18X16 UP (ETR)<br />
1"ø LPC<br />
1 1/4"ø LPS<br />
12ø<br />
2&1/2" LPS UP, 3" LPS DN (ETR)<br />
3<br />
1&1/2" LPC UP, DN (ETR)<br />
1"ø LPC<br />
1 1/4"ø LPS<br />
3<br />
18X18 UP (ETR)<br />
4<br />
18ø<br />
18x24<br />
16ø<br />
16ø<br />
12ø<br />
1400 CFM<br />
40x18<br />
40x18<br />
1500 CFM<br />
3<br />
3<br />
18x24<br />
3<br />
16x10<br />
120 CFM<br />
PHYSICS<br />
B215<br />
3<br />
PREP RM.<br />
7ø<br />
125 CFM<br />
B211<br />
575 CFM<br />
14ø<br />
10ø<br />
OFFICE<br />
B209<br />
10ø<br />
16x10<br />
2<br />
CORRIDOR<br />
C003<br />
14Ø RETURN AIR DUCT (ETR)<br />
10Ø TRANSFER DUCT (ETR)<br />
1<br />
2 18X18 TRANSFER<br />
DUCT<br />
3<br />
24X36 UP, 24X20 DN (ETR)<br />
H'<br />
H<br />
SUPPLY AIR VAV AND DUCTWORK (ETR)<br />
2 18X18 TRANSFER<br />
DUCT<br />
1<br />
4<br />
20X22 UP, 20X18 DN (ETR)<br />
13Ø RETURN DUCT (ETR)<br />
13Ø TRANSFER DUCT (ETR)<br />
I<br />
J'<br />
J<br />
K<br />
D233<br />
5<br />
4<br />
BIOLOGY LAB<br />
D231<br />
300 CFM<br />
30x6<br />
3<br />
CORRIDOR<br />
C002<br />
350 CFM<br />
(TYP FOR 4)<br />
P<br />
Q<br />
1<br />
2<br />
3<br />
4<br />
DEMOLITION KEY <strong>NO</strong>TES<br />
AIRFLOWS SHOWN IN SPACES (OUTSIDE OF THE PROJECT<br />
AREA) ARE EXISTING QUANTITIES OBTAINED FROM AS&BUILT<br />
DOCUMENTS. PRIOR TO CONSTRUCTION, THE CONTRACTOR<br />
SHALL TAKE AIRFLOW MEASUREMENTS AT EACH INDICATED<br />
LOCATION AND PREPARE A REPORT FOR THE ENGINEER'S<br />
REVIEW BEFORE AND AFTER CONSTRUCTION.<br />
DEMOLISH TRANSFER DUCT AND ASSOCIATED GRILLES. FILL<br />
AND PATCH WALL TO MATCH EXISTING.<br />
PROVIDE TEMPORARY CAP FOR DUCTWORK AND/OR PIPING<br />
AT DISCONNECTION POINT TO PREVENT LEAKAGE FROM<br />
SYSTEM AND TO PROTECT DUCTWORK AND PIPING THAT IS<br />
EXISTING TO REMAIN<br />
CUT AND CAP EXISTING TRANSFER DUCT ON CORRIDOR SIDE<br />
OF LAB PREP ROOM WALL. FILL AND PATCH WALL TO<br />
MATCH EXISTING.<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 914&686&7102<br />
SEALS<br />
B<br />
A<br />
7'<br />
300 CFM<br />
20x5<br />
LAB<br />
B243<br />
LAB<br />
B245<br />
250 CFM<br />
(TYP FOR 6)<br />
14ø<br />
14ø<br />
1 1/4"ø LPS<br />
6" LPS UP, 8" LPS DN (ETR)<br />
4" LPC UP, DN (ETR)<br />
250 CFM<br />
(TYP FOR 6)<br />
13ø<br />
13ø<br />
1"ø LPC<br />
18X20 UP, 18X10 DN (ETR)<br />
3<br />
3<br />
3<br />
3<br />
1"ø LPC<br />
1 1/4"ø LPS<br />
12ø<br />
18ø<br />
18x24<br />
16ø<br />
16ø<br />
1200 CFM<br />
40x18<br />
40x18<br />
1200 CFM<br />
2ND FL. AREA B & DEMO PLAN<br />
1/8" = 1'&0"<br />
12ø<br />
8ø<br />
18x24<br />
12ø<br />
3<br />
OFFICE<br />
B207<br />
PREP RM.<br />
12ø<br />
450 CFM<br />
720 CFM<br />
B203<br />
7ø<br />
120 CFM<br />
28X36 UP, 20X36 DN (ETR)<br />
SUPPLY AIR VAV AND<br />
DUCTWORK (ETR)<br />
16ø<br />
390 CFM<br />
OFFICE<br />
B201<br />
120 CFM<br />
14X14 UP, 14X12 DN (ETR)<br />
12ø<br />
12ø<br />
16x10<br />
RETURN AIR DUCT AND REGISTER (ETR)<br />
1<br />
2 18X18 TRANSFER<br />
DUCT<br />
2<br />
L<br />
M<br />
M'<br />
N<br />
EXISTING MECHANICAL CONNECTIONS TO<br />
EXISTING FUME HOOD TO BE REMOVED<br />
BY MECHANICAL CONTRACTOR<br />
2<br />
30X6 TRANSFER<br />
DUCT<br />
30X6 TRANSFER<br />
DUCT<br />
2 18X18 TRANSFER<br />
DUCT<br />
1<br />
3<br />
4<br />
13Ø TRANSFER DUCT (ETR)<br />
O<br />
O'<br />
P'<br />
P<br />
EXISTING MECHANICAL CONNECTIONS TO<br />
EXISTING FUME HOOD TO BE REMOVED<br />
BY MECHANICAL CONTRACTOR<br />
3<br />
12ø<br />
16X18 UP, DN (ETR)<br />
30X25 UP (ETR)<br />
20ø<br />
14ø<br />
34x16<br />
40x10<br />
17ø<br />
12ø<br />
3 3<br />
D223<br />
14ø<br />
34x16<br />
PREP RM<br />
D231A<br />
1 1/4"ø LPS<br />
1"ø LPC<br />
3<br />
R<br />
S<br />
T<br />
2&1/2" LPS UP, 3" LPS DN (ETR)<br />
1&1/2" LPC UP, DN (ETR)<br />
10X32 UP, 10X22 DN (ETR)<br />
20X44 UP, 20X20 DN (ETR)<br />
2ND FL. AREA D & DEMO PLAN<br />
1 2 3 4 5<br />
1/8" = 1'&0"<br />
1<br />
E<br />
A<br />
C<br />
D<br />
KEY PLAN<br />
B<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
66&60 Kissena Boulevard<br />
Flushing NY. 11367<br />
1 9&13&12 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
JOHN NADON<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
2ND FLOOR<br />
MECHANICAL &<br />
DEMOLITION<br />
M&101.00<br />
43<br />
of 65<br />
2115419<br />
FRANK TIER<strong>NO</strong><br />
9/12/2012 11:25:03 AM
ATTACHMENT <strong>NO</strong>. 14<br />
DWG. E001.00(091312)<br />
ELECTRICAL SYMBOL LIST, ABBREVIATIONS AND<br />
<strong>NO</strong>TES<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
SYMBOL<br />
J J<br />
a<br />
D<br />
J<br />
SYMBOL LIST<br />
JUNCTION/SPLICE BOX, SIZE AS REQUIRED.<br />
DESCRIPTION<br />
LIGHTING AND POWER PANELBOARD, RECESSED MOUNTED IN WALL.<br />
SINGLE POLE TOGGLE SWITCH. SUBSCRIPT DE<strong>NO</strong>TES FIXTURES CONTROLLED/RECEPTACLES<br />
CONTROLLED SHOWN ON POWER PLANS. '3' INDICATES THREE!WAY SWITCH. 'D' INDICATES<br />
DIMMER SWITCH. 'OC' INDICATES OCCUPANCY SENSOR.<br />
LOWER CASE LETTERS INDICATE SWITCH DESIGNATION.<br />
DUPLEX THREE WIRE GROUNDED RECEPTACLE, 20A, 125V.<br />
"GFI" INDICATES GROUND FAULT INTERRUPTING TYPE.<br />
QUAD RECEPTACLE, THREE WIRE GROUNDED 20A, 125V.<br />
SIMPLEX RECEPTACLE, THREE WIRE GROUNDED 20A, 125V.<br />
SYMBOL<br />
AP<br />
W<br />
C<br />
TELECOM SYMBOL LIST<br />
DESCRIPTION<br />
WALL MOUNTED TELEPHONE OUTLET FOR STANDARD WALL INSTRUMENT, WITH SINGLE JACK<br />
INSTALLED IN METAL LOCK BOX. CAT 6 CABLES. MOUNT AT 4'!0" A.F.F., U.O.N.<br />
SURFACE MOUNTED DATA OUTLET WITH DUPLEX JACK LABELED "DATA", MOUNTED AT 18" A.F.F. IN WALL,<br />
SURFACE RACEWAY, OR ON PEDESTAL. CAT 6 CABLES.<br />
SINGLE DATA JACK FOR WIRELESS ACCESS POINT DEVICE MOUNTED ABOVE CEILING<br />
WIDE ANGLE PASSIVE INFRARED MOTION DETECTOR WITH GUARD.<br />
CLOCK, MOUNTED AT 7'!6". PROVIDE CLOCK OF SAME TYPE AS EXISTING SYSTEM, AND FULLY COMPATIBLE.<br />
GENERAL <strong>NO</strong>TES<br />
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH REQUIREMENTS OF RELEVANT<br />
SPECIFICATIONS AND CODES.<br />
2. INSTALLATION OF ELECTRICAL DEVICES INCLUDING RACEWAYS AND JUNCTION BOXES ARE<br />
SHOWN DIAGRAMMATICALLY. COORDINATE ALL WORK WITH OTHER TRADES TO AVOID<br />
INTERFERENCE.<br />
3. ALL WORK SHOWN ON ELECTRICAL DRAWINGS IS THE RESPONSIBILITY OF THE ELECTRICAL<br />
CONTRACTOR, UNLESS OTHERWISE <strong>NO</strong>TED.<br />
4. COORDINATE WITH OTHER TRADES FOR EXACT LOCATIONS OF MOTORS AND EQUIPMENT, IN<br />
ORDER TO AVOID INTERFERENCE.<br />
5. CONDUIT HOMERUNS <strong>NO</strong>T OTHERWISE MARKED SHALL BE CONSIDERED 2#12 AND 1#12 GROUND<br />
IN 3/4" MINIMUM CONDUIT.<br />
6. CONTRACTOR SHALL COORDINATE ALL RECEPTACLE MOUNTING HEIGHTS WITH APPROVED<br />
CASEWORK SHOP DRAWINGS PRIOR TO INSTALLATION OF AFFECTED RECEPTACLES.<br />
7. THIS CONTRACTOR SHALL FURNISH, INSTALL AND SIZE ALL SLEEVES, HOLES, CORES, PATCHING,<br />
SLOTS, ANCHORS, BRACKETS, SUPPORTS, JUNCTION BOXES, PULL BOXES, AND OTHER<br />
APPURTENANCES NECESSARY TO EXECUTE THE CONTRACT DOCUMENTS COMPLETELY. SOME OF<br />
THESE ITEMS MAY BE SHOWN ON THE DRAWINGS FOR CLARITY OR DESIGN PREFERENCE.<br />
HOWEVER, <strong>NO</strong>T ALL OF THE ITEMS NECESSARY FOR COMPLETE EXECUTION AND INSTALLATION<br />
ARE SHOWN.<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 973!240!1800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 914!686!7102<br />
C<br />
OS<br />
PP<br />
CR<br />
G<br />
DC<br />
DESIGNATION<br />
R<br />
SURFACE MOUNTED PEDESTAL<br />
WALL MOUNTED SURFACE RECEPTACLE/DATA DUAL RACEWAY.<br />
MANUFACTURED BY WIREMOLD CO. MODEL# WIREMOLD V!4000 OR EQUAL.<br />
RACEWAY HOUSES 10!20 AMP. DUPLEX RECEPTACLES, TWO (2) DATA<br />
JACKS<br />
LOW VOLTAGE DUAL TECH<strong>NO</strong>LOGY (PASSIVE INFRARED AND ULTRASONIC)<br />
OCCUPANCY SENSOR, CEILING MOUNTED, RECTANGULAR PATTERN COVERAGE.<br />
POWER PACK WORKING IN CONJUNCTION WITH LOW VOLTAGE OCCUPANCY SENSORS.<br />
CARD READER. MOUNT AT 3'!6" A.F.F.<br />
GAS SHUT OFF SWITCH. MOUNT AT 5'!0" A.F.F.<br />
DOOR CONTACT<br />
DESIGNATIONS FOR DEMO PLANS<br />
DESCRIPTION<br />
SYMBOL WITH SUBSCRIPT "R" INDICATES EXISTING DEVICE TO BE REMOVED.<br />
APPLICABLE CODES<br />
1. 2008 NEW YORK CITY BUILDING CODE<br />
2. 2011 NEW YORK CITY ELECTRICAL CODE<br />
3. AMERICANS WITH DISABILITIES ACT (ADA)<br />
4. NATIONAL FIRE PROTECTION ASSOCIATION (N.F.P.A. 72)<br />
5. FEDERAL STATE / LOCAL AUTHORITIES HAVING JURISDICTION<br />
ABBREVIATIONS<br />
A, AMP<br />
A.F.F.<br />
A.I.C.<br />
AWG<br />
C<br />
CB<br />
CM<br />
DWG<br />
ELEC<br />
E.C.<br />
EM<br />
FD<br />
FSD<br />
G, GND<br />
G.C.<br />
GFI<br />
J, JB<br />
LTG<br />
MIN<br />
MTD<br />
NTS<br />
P<br />
PH<br />
PNL<br />
PP<br />
TYP<br />
U.O.N.<br />
V<br />
VA<br />
AMPERES<br />
ABOVE FINISHED FLOOR<br />
AMPERE INTERRUPTING CAPACITY<br />
AMERICAN WIRE GAUGE<br />
CONDUIT<br />
CIRCUIT BREAKER<br />
CONSTRUCTION MANAGER<br />
DRAWING<br />
ELECTRICAL (EQUIPMENT OR WIRING)<br />
ELECTRICAL CONTRACTOR<br />
EMERGENCY<br />
FIRE DAMPER<br />
FIRE SMOKE DAMPER<br />
GROUND<br />
GENERAL CONTRACTOR<br />
GROUND FAULT INTERRUPTER<br />
JUNCTION BOX<br />
LIGHTING<br />
MINIMUM<br />
MOUNTED<br />
<strong>NO</strong>T TO SCALE<br />
POLE<br />
PHASE<br />
PANEL<br />
POWER PANEL<br />
TYPICAL<br />
UNLESS OTHERWISE <strong>NO</strong>TED<br />
VOLTS<br />
VOLT AMPERES<br />
8. MINIMIZE THE VISUAL IMPACT OF EXPOSED RACEWAYS AND CONDUITS BY CAREFUL SELECTION<br />
OF ROUTING. SELECT THE ROUTING IN CONCERT WITH THE ARCHITECTURAL DESIGN OF THE<br />
BUILDING.<br />
9. UNLESS OTHERWISE <strong>NO</strong>TED ON FLOOR PLANS OR IN FLOOR PLAN <strong>NO</strong>TES, SWITCHES SHALL BE<br />
INSTALLED AT 4'!0" ABOVE FINISHED FLOOR.<br />
10. APPLICABLE CODES:<br />
• AMERICANS WITH DISABILITIES ACT (ADA)<br />
• 2008 NEW YORK CITY BUILDING CODE<br />
• 2011 NEW YORK CITY ELECTRICAL CODE<br />
11. CONTRACTOR SHALL PROVIDE ANY TEMPORARY LIGHTING AND POWER REQUIRED DURING THE<br />
COURSE OF CONSTRUCTION. ALL 15, 20 AND 30 AMP RECEPTACLES USED FOR CONSTRUCTION<br />
SHALL HAVE GFCI PROTECTION. ALL TEMPORARY WIRING SHALL COMPLY WITH NEC ARTICLE 590.<br />
12. UNLESS OTHERWISE INDICATED, ALL MOUNTING ELEVATIONS ARE CENTERLINE ELEVATIONS.<br />
REMOVAL <strong>NO</strong>TES<br />
1. EXISTING CONDITIONS INDICATED ON THE CONTRACT DRAWINGS ARE BASED ON FIELD<br />
OBSERVATIONS AND EXISTING RECORD DRAWINGS. VERIFY EXISTING CONDITIONS IN THE FIELD.<br />
2. <strong>NO</strong>TES AND GRAPHICAL REPRESENTATIONS ON THE CONTRACT DRAWINGS SHALL <strong>NO</strong>T LIMIT THE<br />
EXTENT OF REMOVALS REQUIRED. PERFORM REMOVALS NECESSARY TO ACHIEVE THE DESIGN<br />
INTENT. COORDINATE THE EXTENT OF REMOVALS WITH THE OTHER TRADES.<br />
3. FOR EQUIPMENT AND WIRING DEVICES THAT WILL BE REMOVED, DEENERGIZE AND DISCONNECT.<br />
REMOVE CONDUITS AND WIRING BACK TO THE SOURCE, U.O.N.<br />
4. UNLESS OTHERWISE INDICATED, EXISTING SERVICES, SYSTEMS, AND WIRING SERVING EXISTING<br />
AREAS OUTSIDE OF THE AREA OF CONSTRUCTION SHALL REMAIN OR SHALL BE RELOCATED AS<br />
REQUIRED TO MAINTAIN OPERATION OF EXISTING SYSTEMS AND AVOID CONFLICT WITH<br />
CONSTRUCTION.<br />
5. WHERE EQUIPMENT AND WIRING ARE REQUIRED TO REMAIN IN SERVICE, BUT INTERFERE WITH<br />
THE ALTERATIONS, RELOCATE AND RECONNECT USING MATERIALS AND STANDARDS OF THIS<br />
CONTRACT.<br />
SEALS<br />
ETR<br />
SYMBOL WITH SUBSCRIPT 'ETR' INDICATES EXISTING DEVICE TO REMAIN.<br />
6. USE CAUTION TO PREVENT DAMAGE TO ARCHITECTURAL SURFACES AND MATERIALS THAT ARE<br />
TO REMAIN. REPAIR OR REPLACE DAMAGED ITEMS.<br />
B<br />
RL<br />
SYMBOL WITH SUBSCRIPT 'RL' INDICATES EXISTING DEVICE TO BE RELOCATED.<br />
7. UNLESS OTHERWISE INDICATED, TAKE REMOVED MATERIALS FROM THE SITE AND DISPOSE OF IN<br />
ACCORDANCE WITH APPLICABLE LAWS AND ENVIRONMENTAL REGULATIONS.<br />
8. ALL OPENINGS CREATED AS A RESULT OF THE DEMOLITION WORK SHALL BE FILLED IN TO MATCH<br />
EXISTING CONSTRUCTION BY ELECTRICAL CONTRACTOR.<br />
1<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
65!30 Kissena Boulevard<br />
Flushing NY. 11367<br />
LIGHTING FIXTURE SCHEDULE<br />
TYPE DESCRIPTION MANUFACTURER CATALOG NUMBER VOLTAGE VOLT!AMPS<br />
A<br />
B<br />
C<br />
1'x4' LED RECESSED EPOC FULL<br />
DISTRUBITION LUMINAIRE<br />
SUSPENDED 96" T8 FLUORESCENT<br />
LUMINAIRE WITH LINEAR PRISMATIC LENS<br />
LED EXIT SIGN WITH EMERGENCY<br />
BATTERY<br />
COLUMBIA<br />
LIGHTING<br />
LIGHTOLIER<br />
LIGHTING<br />
LEPC14!35!22!G!LL!ED!U PROVIDE EMERGENCY<br />
BATTERY PACK FOR EM FIXTURES<br />
EYS8LFX232120H4 PROVIDE EMERGENCY<br />
BATTERY PACK FOR EM FIXTURES<br />
120 V 43 VA<br />
120 V 128 VA<br />
ENCORE LIGHTING LPE!R1!DG 120 V 3 VA<br />
1 9!13!12 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
ISSUE BLOCK<br />
COLOR TEMPERATURE OF NEW FLUORESCENT LIGHT FIXTURES SHALL MATCH COLOR TEMPERATURE OF EXISTING FIXTURES.<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
2115419<br />
PAUL USURIELLO<br />
STEPHANIE AMOH<br />
JOHN HANNAH<br />
SANDRA BENJAMIN<br />
A<br />
1 2 3 4 5<br />
SHEET TITLE<br />
ELECTRICAL<br />
SYMBOL LIST,<br />
ABBREVIATIONS,<br />
AND <strong>NO</strong>TES<br />
E!001.00<br />
54<br />
of 65<br />
9/13/2012 12:40:15 PM
ATTACHMENT <strong>NO</strong>. 15<br />
DWG. E100.00(091312)<br />
2 ND FLOOR LIGHTING PART PLANS DEMO<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
3<br />
1<br />
2 3 4 5<br />
D<br />
GENERAL <strong>NO</strong>TES<br />
1. FOR GENERAL <strong>NO</strong>TES, REMOVAL <strong>NO</strong>TES, SYMBOL LIST, AND ABBREVIATIONS, SEE DRAWING<br />
E+001.<br />
2. REMOVE AND PROPERLY DISPOSE OF SWITCHES SCHEDULED TO BE REMOVED. REMOVE ALL<br />
EXISTING LIGHTING FIXTURES AND FLUORESCENT BULBS SCHEDULED TO BE REMOVED, AND<br />
COORDINATE FOR GENERAL CONTRACTOR TO DISPOSE AS UNIVERSAL WASTE.<br />
3. REMOVE ASSOCIATED CONDUIT AND BRANCH CIRCUIT WIRING BACK TO THE SUPPLYING<br />
PANEL(S), U.O.N.<br />
4. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH<br />
RE<strong>NO</strong>VATED AREAS SERVICING UNDISTURBED AREAS.<br />
5. ALL WORK SHOWN ON THIS DRAWING IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR,<br />
U.O.N.<br />
<strong>STV</strong><br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 973+240+1800<br />
6<br />
5<br />
4<br />
3<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 914+686+7102<br />
EXISTING PENDANT<br />
MOUNTED FLUORESCENT<br />
TO BE REMOVED.<br />
(TYPICAL)<br />
H'<br />
C<br />
H<br />
R<br />
R<br />
G<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
LAB<br />
B237<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
PREP RM.<br />
B211<br />
I<br />
J'<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
LAB<br />
B241<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
1<br />
R<br />
J<br />
K<br />
5<br />
4<br />
3<br />
SEALS<br />
B<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
LAB<br />
B243<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
1<br />
PREP RM.<br />
B203<br />
L<br />
M<br />
M'<br />
N<br />
OC<br />
1<br />
R<br />
R<br />
R<br />
R<br />
Lab<br />
D231<br />
R<br />
R<br />
R<br />
R<br />
R<br />
EXISTING PENDANT<br />
MOUNTED FLUORESCENT<br />
TO BE REMOVED.<br />
(TYPICAL)<br />
Q<br />
R<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
65+30 Kissena Boulevard<br />
Flushing NY. 11367<br />
A<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
LAB<br />
R<br />
B245<br />
2ND FLOOR + AREA B LIGHTING<br />
DEMO PLAN<br />
1/8" = 1'+0"<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
1<br />
R<br />
R<br />
R<br />
O<br />
O'<br />
P'<br />
P<br />
1 2 3 4 5<br />
1/8" = 1'+0"<br />
OC<br />
R<br />
R<br />
R<br />
R<br />
R<br />
1<br />
R<br />
R<br />
R<br />
R<br />
Prep Room<br />
D231A<br />
2ND FLOOR + AREA D LIGHTING<br />
DEMO PLAN<br />
S<br />
E<br />
A<br />
C<br />
D<br />
KEY PLAN<br />
B<br />
1 9+13+12 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
STEPHANIE AMOH<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
2ND FLOOR<br />
LIGHTING PART<br />
PLANS + DEMO<br />
E+100.00<br />
55<br />
of 65<br />
2115419<br />
JOHN HANNAH<br />
9/13/2012 12:40:16 PM
ATTACHMENT <strong>NO</strong>. 16<br />
DWG. E110.00(091312)<br />
2 ND FLOOR POWER & LOW VOLTAGE<br />
PART PLANS DEMO<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
6<br />
5<br />
4<br />
3<br />
GENERAL <strong>NO</strong>TES<br />
1. FOR GENERAL <strong>NO</strong>TES, REMOVAL <strong>NO</strong>TES, SYMBOL LIST, AND ABBREVIATIONS, SEE DRAWING<br />
E001.<br />
2. FOR RISER DIAGRAM, SEE DRAWING E600.<br />
3. REMOVE ASSOCIATED CONDUIT AND BRANCH CIRCUIT WIRING BACK TO THE SUPPLYING<br />
PANEL(S), U.O.N.<br />
1<br />
4. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH<br />
RE<strong>NO</strong>VATED AREAS SERVICING UNDISTURBED AREAS.<br />
5. EXISTING FUME HOOD TO BE REMOVED BY GC. EXISTING ELECTRICAL CONNECTION TO BE<br />
REMOVED BY EC.<br />
6. ALL WORK SHOWN ON THIS DRAWING IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR,<br />
U.O.N.<br />
7. DISCONNECT AND REMOVE AIR VALVE CONTROLS AND ASSOCIATED ELECTRICAL DEVICES. TURN<br />
OVER TO QUEENS COLLEGE FOR REUSE.<br />
8. EXISTING MECHANICAL EQUIPMENT TO REMAIN SHALL BE DISCONNECTED FROM EXISTING<br />
POWER PANELS AND RECONNECTED TO NEW PANELS. REUSE EXISTING WIRING TO CIRCUIT TO<br />
NEW PANELS.<br />
9. REMOVE EXISTING WALL MOUNTED IDF RACKS AND WIRELESS ACCESS POINTS IN LABS AND PREP<br />
ROOMS. TURN OVER TO QUEENS COLLEGE FOR REUSE.<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
C<br />
B<br />
A<br />
?<br />
RELOCATE CONDUIT<br />
TO ACCOMMODATE<br />
NEW CASEWORK.<br />
1<br />
1/8" = 1'0"<br />
W<br />
G<br />
W<br />
W<br />
R<br />
1<br />
W<br />
RL<br />
RL<br />
RL<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
RL R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
1<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
1<br />
R<br />
C<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R R<br />
LAB<br />
R<br />
R<br />
R<br />
B237<br />
R<br />
R<br />
ETR<br />
R<br />
ETR<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
1 1 LAB 1<br />
R<br />
1<br />
R<br />
B241<br />
LAB<br />
B243<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
RL<br />
1 1 LAB 1<br />
B245<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
ETR<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
SEE <strong>NO</strong>TE 12<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
ETR R R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
R<br />
J<br />
J<br />
R<br />
AP2N<br />
R<br />
ETR<br />
AP2P<br />
2ND FLOOR AREA B POWER<br />
AND LOW VOLTAGE DEMO PLAN<br />
1<br />
1<br />
ETR<br />
R<br />
AP2R<br />
R<br />
R<br />
R<br />
AP2Q<br />
R<br />
ETR<br />
ETR<br />
ETR<br />
R R R R<br />
R<br />
PROJECTOR<br />
ETR<br />
J<br />
220V<br />
RECEPTACLE<br />
R<br />
1<br />
R R R<br />
PREP RM.<br />
ETR<br />
B211<br />
J<br />
R<br />
SEE <strong>NO</strong>TE 5<br />
R<br />
SEE <strong>NO</strong>TE 10<br />
PREP RM.<br />
ETR<br />
1<br />
B203<br />
R R R R R<br />
ETR<br />
ETR<br />
ETR<br />
ETR<br />
ETR<br />
ETR<br />
ETR<br />
H'<br />
H<br />
I<br />
J'<br />
J<br />
K<br />
L<br />
M<br />
M'<br />
N<br />
O<br />
O'<br />
P'<br />
P<br />
5 4 3<br />
ETR<br />
ETR<br />
ETR<br />
ETR<br />
ETR<br />
J<br />
R<br />
R<br />
R<br />
R<br />
R<br />
C<br />
ETR<br />
ETR<br />
SEE <strong>NO</strong>TE 5<br />
R<br />
AP2S R R<br />
1<br />
R<br />
Prep Room<br />
ETR<br />
ETR<br />
R R R R R<br />
R<br />
R R R R R R R R R R R R<br />
Lab<br />
D231<br />
R<br />
R R R R R R R R R R R R<br />
R R R R R R R R R R R R<br />
1 2 3 4 5<br />
D231A<br />
ETR<br />
R<br />
R<br />
ETR<br />
REMOVE ALL<br />
ASSOCIATED<br />
DEVICES AND<br />
WIRING.<br />
2ND FLOOR AREA D POWER<br />
AND LOW VOLTAGE DEMO PLAN<br />
1/8" = 1'0"<br />
1<br />
1<br />
1<br />
1<br />
Q<br />
R<br />
S<br />
10. ALL EXISTING EQUIPMENT FOR PROJECTOR (I.E. PROJECTOR, AV OUTLETS, SPEAKERS,<br />
CONDUITS, ETC.) SHALL BE REMOVED.<br />
11. REMOVE ALL DATA DEVICES AND ASSOCIATED WIRING AND CONDUITS, U.O.N.<br />
12. DISCONNECT AND REMOVE EMERGENCY GAS SHUTOFF EQUIPMENT AND ASSOCIATED<br />
ELECTRICAL DEVICES. TURN OVER TO QUEENS COLLEGE FOR REUSE.<br />
E<br />
A<br />
C<br />
D<br />
KEY PLAN<br />
1<br />
B<br />
PROJECT IDENTIFICATION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
SEALS<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6530 Kissena Boulevard<br />
Flushing NY. 11367<br />
1 91312 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
STEPHANIE AMOH<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
2ND FLOOR<br />
POWER & LOW<br />
VOLTAGE PART<br />
PLANS DEMO<br />
E110.00<br />
56<br />
of 65<br />
2115419<br />
JOHN HANNAH<br />
9/13/2012 12:53:04 PM
ATTACHMENT <strong>NO</strong>. 17<br />
DWG. E130.00(091312)<br />
2 ND FLOOR POWER & LOW VOLTAGE<br />
PART PLANS<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
<strong>STV</strong><br />
D<br />
5<br />
4<br />
3<br />
GENERAL <strong>NO</strong>TES<br />
1. FOR GENERAL <strong>NO</strong>TES, REMOVAL <strong>NO</strong>TES, SYMBOL LIST, AND ABBREVIATIONS, SEE DRAWING<br />
E001.<br />
2. FOR RISER DIAGRAM, SEE DRAWING E600.<br />
3. FOR PANEL SCHEDULES, SEE DRAWINGS E601 AND E602.<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
C<br />
B<br />
SEE <strong>NO</strong>TE 12<br />
SEE <strong>NO</strong>TE 12<br />
CR<br />
CR<br />
CR<br />
J<br />
C<br />
G<br />
W<br />
1 10<br />
J<br />
23<br />
C<br />
G<br />
POWER SUPPLY FOR<br />
DOOR CONTROLLERS.<br />
RL<br />
CONNECT 2 DOORS<br />
PER SUPPLY. J 22<br />
POWER SUPPLY FOR<br />
DOOR CONTROLLERS.<br />
CONNECT 2 DOORS<br />
PER SUPPLY.<br />
SEE <strong>NO</strong>TE 12<br />
W<br />
C<br />
W<br />
1<br />
RL AP<br />
C<br />
23<br />
J<br />
AP<br />
15<br />
W<br />
CR<br />
17<br />
16<br />
Biology Lab<br />
B241<br />
Biology Lab<br />
B245<br />
19<br />
18<br />
21<br />
48"<br />
15 5 9<br />
4<br />
ETR<br />
20<br />
EV4<br />
J<br />
ETR FSD<br />
J 6<br />
FSD<br />
7 J<br />
J<br />
PPB237<br />
J<br />
FSD<br />
10<br />
10 10 10<br />
J 7<br />
42" 42" 42" 42"<br />
EV6<br />
12 15 13 17<br />
1<br />
16 14 11 8 J 9<br />
AP 10<br />
19<br />
42"<br />
J 15 12 17 13 14 16 8 11<br />
SEE <strong>NO</strong>TE 10<br />
1<br />
RHC6 SV6<br />
J SV6B<br />
SEE <strong>NO</strong>TE 10 (TYP)<br />
9<br />
J<br />
9 J<br />
9<br />
12 15 13 17 16 14 11 8<br />
3<br />
SEE <strong>NO</strong>TE 12<br />
FSD<br />
SV5 13<br />
7<br />
SEE <strong>NO</strong>TE 10<br />
J 11 J RHC5 25 J<br />
RL<br />
SV6A SEE <strong>NO</strong>TE 7 (TYP)<br />
11<br />
Biology Lab<br />
9 J<br />
SEE <strong>NO</strong>TE 10<br />
7<br />
B237<br />
J<br />
Preparation room<br />
AP<br />
1<br />
SEE <strong>NO</strong>TE 11<br />
FSD<br />
B211 ETR<br />
42"<br />
5<br />
10<br />
8 8<br />
48"<br />
9<br />
4 2<br />
ETR<br />
FSD<br />
J 12<br />
7 4 7 4<br />
24 J<br />
6 J<br />
SV5A<br />
9<br />
4 J<br />
42" 42" 42" 42"<br />
PPB241<br />
11<br />
ETR<br />
ETR<br />
10 15 1 17 16 19 18 21 20<br />
ETR<br />
3<br />
RHC4<br />
J<br />
AP<br />
J<br />
8 8<br />
9<br />
11 SV4 11<br />
SEE <strong>NO</strong>TE 10<br />
ETR<br />
15 10 16 17 18 19 20<br />
21<br />
EV5 J 11<br />
4<br />
42"<br />
15<br />
42"<br />
GFI GFI GFI GFI GFI<br />
JGFI<br />
4 48" 5<br />
7<br />
7<br />
PPB243<br />
FSD<br />
48"<br />
48"<br />
SEE <strong>NO</strong>TE 11<br />
3<br />
4<br />
4 4 4 ETR J<br />
J<br />
42" 42" 42" 42" 4<br />
AP<br />
11 10 13 12 15 14 6<br />
18<br />
J<br />
1<br />
5<br />
EV3 4<br />
7 42"<br />
17<br />
10 11 12 13 14 15 5 6<br />
J<br />
SV3B<br />
J 7<br />
11<br />
RHC3 J<br />
SV3<br />
7 J<br />
7<br />
SEE <strong>NO</strong>TE 10 SEE <strong>NO</strong>TE 12<br />
1 10 13 12 15 14 6 5<br />
10<br />
FSD J 3<br />
SV2<br />
SEE <strong>NO</strong>TE 12<br />
J 11 RHC2 25 J<br />
J<br />
Biology Lab<br />
11<br />
RL<br />
SV3A J<br />
FD<br />
B243<br />
7<br />
SEE <strong>NO</strong>TE 10<br />
3<br />
J<br />
J<br />
Preparation room 7<br />
J 16 AP<br />
1<br />
2<br />
SEE <strong>NO</strong>TE 11 FSD 42" B203 ETR<br />
8 ETR 2 8<br />
PPB245<br />
48"<br />
12 10 10<br />
48"<br />
ETR<br />
FSD J 6<br />
12<br />
9 15<br />
9 15<br />
J<br />
J 7 3<br />
44"<br />
42" 42" 42" 42"<br />
20 16 14 17 21 19 18 22 24 ETR 8 SV2A<br />
1 1<br />
J 11<br />
J<br />
AP<br />
12<br />
11<br />
RHC1 SV1<br />
J<br />
HEV1 J 11 10 10 44"<br />
11<br />
16 20 17 14 19 21 22 18<br />
SEE <strong>NO</strong>TE 10<br />
12<br />
ETR EV2<br />
ETR<br />
J 12 12<br />
9 11<br />
20 16 14 17 21 19 18 22<br />
ETR<br />
ETR<br />
G<br />
RL<br />
G<br />
SEE <strong>NO</strong>TE 11<br />
18<br />
EV1<br />
11<br />
11<br />
9<br />
ETR<br />
9<br />
ETR<br />
G<br />
G<br />
H<br />
I<br />
J'<br />
J<br />
K<br />
L<br />
M<br />
M'<br />
N<br />
O<br />
O'<br />
P'<br />
P<br />
5<br />
POWER SUPPLY FOR<br />
DOOR CONTROLLER<br />
ETR<br />
5<br />
48" 14<br />
6<br />
14<br />
ETR<br />
6<br />
ETR<br />
ETR<br />
5<br />
FD CR<br />
4 J G<br />
J<br />
C<br />
J<br />
ETR<br />
23<br />
22 ETR 20<br />
13<br />
AP<br />
15<br />
ETR<br />
21 18<br />
J<br />
21<br />
6 EV7<br />
SV7A<br />
9<br />
7 9 J SEE <strong>NO</strong>TE 10 AP<br />
J HEV2<br />
ETR<br />
SEE <strong>NO</strong>TE 10 5<br />
J 9<br />
FSD<br />
J 24<br />
4 J<br />
1<br />
ETR<br />
SEE <strong>NO</strong>TE 11<br />
3 10 1 Prep. Room<br />
12<br />
PPD231 SV7<br />
11 D231A<br />
J 9 J 9<br />
RHC7<br />
J FSD<br />
SEE <strong>NO</strong>TE 10 ETR 12<br />
4<br />
4<br />
19<br />
Biology Lab<br />
D231<br />
17<br />
16<br />
18<br />
SEE <strong>NO</strong>TE 12<br />
ETR<br />
5<br />
17<br />
20<br />
19<br />
16<br />
21<br />
J<br />
FD<br />
4<br />
3<br />
20<br />
42"<br />
17<br />
6<br />
16<br />
42"<br />
15<br />
19<br />
18<br />
42"<br />
1<br />
1<br />
Q<br />
R<br />
S<br />
NEW 4" CONDUIT<br />
6<br />
TELECOM ROOM<br />
B343A<br />
4. LOCATIONS OF ALL EQUIPMENT AND DEVICES ARE APPROXIMATE. CONTRACTOR TO VERIFY<br />
ACTUAL SITE CONDITIONS.<br />
5. RACEWAYS SHALL BE INSTALLED CONCEALED WHERE POSSIBLE. IF EXPOSED RUN IS REQUIRED,<br />
RACEWAYS SHALL BE PAINTED TO MATCH EXISTING FINISH. COORDINATE WITH CM FOR EXPOSED<br />
RUNS.<br />
6. CONNECT NEW DATA OUTLETS TO PATCH PANEL LOCATED IN TELECOM ROOM SBB343A.<br />
7. FIRE DAMPERS AND FIRE SMOKE DAMPERS FURNISHED AND INSTALLED BY MECHANICAL<br />
CONTRACTOR. ELECTRICAL CONTRACTOR SHALL PROVIDE POWER CONNECTION.<br />
8. ALL WORK SHOWN ON THIS DRAWING IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR,<br />
U.O.N.<br />
9. CIRCUIT ROOMS TO PANELBOARDS AS LISTED BELOW:<br />
PP237: LAB B237<br />
PP241: LAB B241, PREP ROOM B211<br />
PP243: LAB B243<br />
PP245: LAB B245, PREP ROOM B203<br />
PP231: LAB D231, PREP ROOM D231A<br />
10. AIR VALVES AND REHEAT COILS ARE PROVIDED BY MECHANICAL CONTRACTOR.<br />
11. SOLE<strong>NO</strong>ID VALVE CONTROLS FURNISHED AND INSTALLED BY PLUMBING CONTRACTOR.<br />
12. LAB CONTROL PANEL AND TRANSFORMER ARE FURNISHED AND INSTALLED BY MECHANICAL<br />
CONTRACTOR. ELECTRICAL CONTRACTOR SHALL PROVIDE POWER CONNECTION. COORDINATE<br />
WITH MECHANICAL CONTRACTOR FOR LOCATIONS.<br />
13. ELECTRICAL CONTRACTOR SHALL PROVIDE WIRING AND CONDUIT FOR POWER CONNECTIONS TO<br />
ALL CONTROL DEVICES INSTALLED BY EITHER PLUMBING OR MECHANICAL CONTRACTOR.<br />
EXISTING IDF RACK<br />
NEW WALL MOUNTED<br />
IDF RACK<br />
NEW CABLE TRAY<br />
EXISTING CABLE TRAY<br />
EXISTING 4" CONDUIT<br />
K<br />
L<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 9732401800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
SEALS<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6530 Kissena Boulevard<br />
Flushing NY. 11367<br />
2ND FLOOR AREA B POWER<br />
AND LOW VOLTAGE PLAN<br />
2ND FLOOR AREA D POWER<br />
AND LOW VOLTAGE PLAN<br />
3RD FLOOR AREA B TELECOM<br />
ROOM PLAN<br />
1 91312 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
ISSUE BLOCK<br />
A<br />
1/8" = 1'0"<br />
1/8" = 1'0"<br />
1 2 3 4 5<br />
1/8" = 1'0"<br />
E<br />
A<br />
C<br />
D<br />
KEY PLAN<br />
B<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
PAUL USURIELLO<br />
STEPHANIE AMOH<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
2ND FLOOR<br />
POWER & LOW<br />
VOLTAGE PART<br />
PLANS<br />
E130.00<br />
58<br />
of 65<br />
2115419<br />
JOHN HANNAH<br />
9/13/2012 12:40:18 PM
ATTACHMENT <strong>NO</strong>. 18<br />
DWG. E500.00(091312)<br />
DETAILS<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
D<br />
<strong>STV</strong><br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
t 973#240#1800<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 914#686#7102<br />
1<br />
C<br />
6" X 6" X 4" DEEP SURFACE<br />
ENCLOSURE WITH SCREW<br />
COVER TO TERMINATE (3) 1"<br />
CONDUITS FROM A / V<br />
FACEPLATE BACKBOX<br />
STRUCTURAL CEILING<br />
TO CAMPUS<br />
NETWORK<br />
TO DEDICATED<br />
120VAC, 20A<br />
A<br />
SA3032 MASTER CONTROLLER<br />
UNIT WITH POWER SUPPLY AND<br />
ENCLOSURE. (1) UNIT CONTROLS<br />
ALL 5 DOORS.<br />
(2) SA3000 DOOR CONTROLLER<br />
BOARDS WITH POWER SUPPLY AND<br />
ENCLOSURE. (ONE CONTROLLER<br />
BOARD PER DOOR)<br />
4" X 4" SURFACE PULLBOX<br />
WITH SCREW COVER<br />
STRUCTURAL CEILING<br />
TELCOM ROOM (B343A)<br />
2" FLEXIBLE CONDUIT<br />
DOUBLE GANG FLUSH<br />
CEILING MOUNTED OUTLET<br />
BOX<br />
(3) 1" EMT CONDUITS FROM<br />
A / V FACEPLATE BACKBOX<br />
HANGER WIRE RIGIDLY ATTACHED TO<br />
STRUCTURAL CEILING. WIRE TO MATCH<br />
CEILING GRID WIRE. (2) WIRES<br />
REQUIRED PER EACH INSTALLATION<br />
LOCATION TYPICAL<br />
HANGER BAR ASSEMBLY<br />
WITH OUTLET BOX RIGIDLY<br />
ATTACHED<br />
A<br />
REX<br />
REQUEST#TO#EXIT<br />
A<br />
ELECTRIC<br />
STRIKE<br />
ELECTRIFIED<br />
HINGE<br />
A<br />
DC<br />
A<br />
B<br />
1" FLEXIBLE<br />
CONDUIT<br />
SINGLE GANG FLUSH<br />
CEILING MOUNTED OUTLET<br />
BOX<br />
(SEE <strong>NO</strong>TES)<br />
1" EMT CONDUIT TO CORRIDOR<br />
CABLE TRAY SYSTEM<br />
HANGER WIRE RIGIDLY ATTACHED TO<br />
STRUCTURAL CEILING. WIRE TO MATCH<br />
CEILING GRID WIRE. (2) WIRES<br />
REQUIRED PER EACH INSTALLATION<br />
LOCATION TYPICAL<br />
HANGER BAR ASSEMBLY WITH OUTLET<br />
BOX RIGIDLY ATTACHED<br />
SEALS<br />
CARD<br />
READER<br />
LAY#IN CEILING<br />
ELECTRIFIED<br />
LOCKSET<br />
LAY#IN CEILING<br />
B<br />
DOUBLE GANG STAINLESS STEEL<br />
COVERPLATE WITH 2" GROMMETED<br />
OPENING<br />
SPACES WITH CEILINGS<br />
WIRELESS ACCESS POINT<br />
(PROVIDED BY COLLEGE)<br />
3<br />
FLUSH CEILING MOUNTED JUNCTION BOX INSTALLATION DETAIL<br />
SCALE: <strong>NO</strong>NE<br />
2<br />
ACCESS CONTROL SYSTEM<br />
EQUIPMENT LAYOUT # TYPICAL<br />
SCALE: NTS<br />
CABLE SCHEDULE FOR ACCESS CONTROL<br />
A # 18/2, TWISTED PAIR, SHIELDED, 3/4"C<br />
B # 18/6. TWISTED PAIR, SHIELDED, 3/4"C<br />
EACH CABLE GROUP SHALL BE RUN IN SEPARATE CONDUIT<br />
MAKE ALL FINAL TERMINATIONS PER MANUFACTURER RECOMMENDATIONS<br />
1<br />
<strong>NO</strong>TES:<br />
WIRELESS ACCESS POINT INSTALLATION DETAIL<br />
SCALE: <strong>NO</strong>NE<br />
1. DO <strong>NO</strong>T INSTALL FACEPLATE ON SINGLE GANG SURFACE/FLUSH OUTLET BOX FOR WIRELESS ACCESS POINT.<br />
PROVIDE MOUNTING SCREWS AND LABELS.<br />
2. TERMINATE WIRELESS ACCESS POINT CAT 6 CABLE ON CAT 6 RJ#45 MODULAR PLUG (MALE 8#PIN CONNECTOR) USING<br />
T568 WIRING CONFIGURATION. PROVIDE 2 FT. OF SLACK CAT 6 CABLE IN THE BOX.<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
65#30 Kissena Boulevard<br />
Flushing NY. 11367<br />
1 9#13#12 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
ISSUE BLOCK<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
2115419<br />
PAUL USURIELLO<br />
STEPHANIE AMOH<br />
JOHN HANNAH<br />
SANDRA BENJAMIN<br />
A<br />
SHEET TITLE<br />
DETAILS<br />
1 2 3 4 5<br />
E#500.00<br />
59<br />
of 65<br />
9/13/2012 12:40:19 PM
ATTACHMENT <strong>NO</strong>. 19<br />
DWG. E600.00(091312)<br />
ELECTRICAL RISER DIAGRAMS<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
D<br />
GENERAL <strong>NO</strong>TES<br />
1. FOR GENERAL <strong>NO</strong>TES, REMOVAL <strong>NO</strong>TES, SYMBOL LIST, AND ABBREVIATIONS, SEE DRAWING<br />
E001.<br />
2. FOR PANEL SCHEDULES, SEE DRAWINGS E601 AND E602.<br />
3. ALL WORK SHOWN ON THIS DRAWING IS THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR,<br />
U.O.N.<br />
<strong>STV</strong><br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
BIOLOGY LAB<br />
ROOM B237<br />
BIOLOGY LAB<br />
ROOM B241<br />
BIOLOGY LAB<br />
ROOM B243<br />
BIOLOGY LAB<br />
ROOM B245<br />
BIOLOGY LAB<br />
ROOM D231<br />
BIOLOGY LAB<br />
ROOM B237<br />
BIOLOGY LAB<br />
ROOM B241<br />
BIOLOGY LAB<br />
ROOM B243<br />
BIOLOGY LAB<br />
ROOM B245<br />
BIOLOGY LAB<br />
ROOM D231<br />
t 9732401800<br />
3RD FLOOR<br />
REMOVE EXISTING<br />
PANEL AND BRANCH<br />
CIRCUITS (TYPICAL)<br />
EXISTING<br />
PANEL<br />
AP2N<br />
EXISTING<br />
PANEL<br />
AP2P<br />
EXISTING<br />
PANEL<br />
AP2Q<br />
EXISTING<br />
PANEL<br />
AP2R<br />
EXISTING<br />
PANEL<br />
AP2S<br />
1<br />
3RD FLOOR<br />
REPLACE EXISTNG<br />
PANEL WITH NEW<br />
208/120V, 225A<br />
M.L.O., 3PH, 4W, 42P<br />
PANEL (TYPICAL)<br />
NEW<br />
PANEL<br />
PPB237<br />
NEW<br />
PANEL<br />
PPB241<br />
NEW<br />
PANEL<br />
PPB243<br />
NEW<br />
PANEL<br />
PPB245<br />
NEW<br />
PANEL<br />
PPD231<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
2ND FLOOR<br />
2ND FLOOR<br />
J<br />
J<br />
J<br />
J<br />
J<br />
C<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL TO REMAIN<br />
120/208V, 3PH, 4W<br />
(TYPICAL)<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL<br />
DPH<br />
800A<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL<br />
DPI<br />
800A<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL<br />
DPJ<br />
600A<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL<br />
DPK<br />
800A<br />
EXISTING DISTRIBUTION PANEL TO<br />
REMAIN. 120/208V, 3PH, 4W<br />
REPLACE EXISTING<br />
OVERCURRENT DEVICE(S)<br />
PREVIOUSLY SERVING REMOVED<br />
PANEL(S) WITH NEW COMPATIBLE<br />
200A, 3P +N OVERCURRENT<br />
DEVICE (VERIFY IN FIELD).<br />
(TYPICAL)<br />
1<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL<br />
DPH<br />
800A<br />
(ROOM B115A)<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL<br />
DPI<br />
800A<br />
(ROOM B105)<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL<br />
DPJ<br />
600A<br />
(ROOM B101)<br />
EXISTING<br />
DISTRIBUTION<br />
PANEL<br />
DPK<br />
800A<br />
(ROOM D119)<br />
4#3/0 +1#6G IN EXISTING 2"C<br />
(TYPICAL)<br />
1ST FLOOR<br />
1ST FLOOR<br />
EXISTING MAIN<br />
DISTRIBUTION<br />
SWITCHBOARD 2500A,<br />
120/208V, 3PH, 4W<br />
EXISTING MAIN<br />
DISTRIBUTION<br />
SWITCHBOARD 2500A,<br />
120/208V, 3PH, 4W<br />
SEALS<br />
CELLAR<br />
CELLAR<br />
SWITCHBOARD ROOM<br />
SWITCHBOARD ROOM<br />
PART POWER RISER DIAGRAM EXISTING<br />
<strong>NO</strong> SCALE<br />
PART POWER RISER DIAGRAM NEW<br />
<strong>NO</strong> SCALE<br />
B<br />
PROJECT IDENTIFICATION<br />
TELECOM ROOM B343A<br />
NEW WALL<br />
MOUNT<br />
IDF<br />
MOUNT AT 6'0" A.F.F.<br />
FROM BOTTOM OF RACK<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6530 Kissena Boulevard<br />
Flushing NY. 11367<br />
3RD FLOOR<br />
CAT6<br />
PROVIDE NEW 4" CONDUIT FOR<br />
WIRING OF NEW DEVICES. RUN<br />
NEXT TO EXISTING 4" CONDUIT.<br />
A<br />
2ND FLOOR<br />
AP<br />
AP<br />
BIOLOGY<br />
LAB B237<br />
AP<br />
AP<br />
BIOLOGY<br />
LAB B241<br />
AP<br />
AP<br />
BIOLOGY<br />
LAB B243<br />
AP<br />
AP<br />
BIOLOGY<br />
LAB B245<br />
AP<br />
AP<br />
BIOLOGY<br />
LAB D231<br />
EXISTING<br />
MDF IN<br />
ROOM A135E<br />
BACKBONE CABLING<br />
24 STRAND, 50 MICRON<br />
MULTIMODE FIBER OPTIC<br />
CABLE IN 2" CONDUIT.<br />
1 91312 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
STEPHANIE AMOH<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
2115419<br />
JOHN HANNAH<br />
1ST FLOOR<br />
TELECOMMUNICATIONS RISER DIAGRAM<br />
<strong>NO</strong> SCALE<br />
1 2 3 4 5<br />
ELECTRICAL<br />
RISER<br />
DIAGRAMS<br />
E600.00<br />
60<br />
of 65<br />
9/13/2012 12:40:19 PM
ATTACHMENT <strong>NO</strong>. 20<br />
DWG. FA001.00 (091312)<br />
SYMBOL LIST, GENERAL <strong>NO</strong>TES & RISER<br />
DIAGRAM<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
1<br />
2 3 4 5<br />
SCOPE OF WORK<br />
GENERAL <strong>NO</strong>TES<br />
<strong>STV</strong><br />
D<br />
SYMBOL<br />
FSD<br />
R<br />
CM<br />
FIRE ALARM SYMBOL LIST<br />
DESCRIPTION<br />
WALL MOUNTED STROBE. MOUNT AT 8'0" A.F.F. OR 6" BELOW CEILING, WHICHEVER IS LOWER.<br />
FIRE SMOKE DAMPER (FURNISHED BY MECHANICAL CONTRACTOR, INSTALLED BY ELECTRICAL CONTRACTOR)<br />
FIRE ALARM RELAY<br />
CONTROL MODULE<br />
FIRE ALARM SYSTEM CONDUIT<br />
SIZING CHART<br />
CONDUIT MAX # OF CABLES<br />
SIZE PER CONDUIT<br />
3/4" 4<br />
1" 6<br />
1 1/4" 8<br />
1 1/2" 10<br />
2" 12<br />
1. PROVIDE A NEW FIRE ALARM SYSTEM FOR THE AREA B AND D LABS.<br />
2. THE WORK SHALL INCLUDE ALL LABOR, MATERIALS AND NECESSARY SERVICES TO PROVIDE A<br />
COMPLETE ADDRESSABLE FIRE ALARM SYSTEM.<br />
3. NEW FIRE ALARM SYSTEM SHALL BE INTERFACED WITH THE MAIN FIRE ALARM CONTROL PANEL<br />
(FACP) TO PROVIDE THE FOLLOWING FUNCTIONS:<br />
a. AN ALARM CONDITION INITIATED AT THE MAIN FACP SHALL ALSO ACTIVATE<br />
AN ALARM CONDITION AT THE AREA “B” AND “D” FACP.<br />
b. AN ALARM CONDITION INITIATED AT THE AREA “B” AND “D” FACP SHALL<br />
ALSO ACTIVATE AN ALARM CONDITION AT THE MAIN FACP.<br />
4. THE SYSTEM SHALL INCLUDE ALL PERIPHERAL DEVICES, MONITORING AND CONTROL MODULES<br />
AND RELAYS, AND VISUAL <strong>NO</strong>TIFICATION DEVICES REQUIRED TO PROVIDE A FULLY FUNCTIONING<br />
SYSTEM.<br />
1. THE FIRE ALARM CONTRACTOR SHALL RETAIN THE SERVICES OF AN AUTHORIZED<br />
REPRESENTATIVE OF THE MANUFACTURER OF THE EXISTING FIRE ALARM SYSTEM (SIMPLEX<br />
GRINNELL PHONE # 2123724209, CONTACT PERSON IS ROBERT LAURIE) TO FURNISH AND<br />
INSTALL THE INTERFACE CONNECTION AND MAINTAIN THE INTEGRITY OF THE EXISTING FIRE<br />
ALARM SYSTEM AND WARRANTIES.<br />
2. EXISTING FIRE ALARM SYSTEM SHALL REMAIN FULLY OPERATIONAL AT ALL TIMES.<br />
3. COMPONENTS AND DEVICES ASSOCIATED WITH THE NEW FIRE ALARM SYSTEM SHALL BE OFFICE<br />
OF TECHNICAL CERTIFICATION AND RESEARCH (OTCR) APPROVED AND COMPATIBLE WITH<br />
EXISTING FACP.<br />
4. THE FIRE ALARM RISER IN THIS CONTRACT IS FOR DESIGN PURPOSE ONLY. FIRE ALARM<br />
CONTRACTOR SHALL PROVIDE A COMPLETE FIRE ALARM RISER DIAGRAM, SHOP DRAWING<br />
SHOWING ACTUAL FIELD WIRING REQUIRED.<br />
5. PROVIDE FIRESTOPS FOR RACEWAYS PENETRATING WALLS AND CEILINGS TO MAINTAIN ORIGINAL<br />
FIRE RATING.<br />
<strong>STV</strong> INC.<br />
225 PARK AVE. SOUTH<br />
NEW YORK, NY 10003<br />
www.stvinc.com<br />
CONSULTANTS<br />
ENVIRONMENTAL<br />
MATRIX NEW WORLD<br />
120 EAGLE ROCK AVENUE SUITE 207<br />
EAST HA<strong>NO</strong>VER, NJ. 07936<br />
TS<br />
TAMPER SWITCH<br />
6. INCLUDE ALL WORK FOR INTERCONNECTING CIRCUITRY BETWEEN NEW FIRE ALARM CONTROL<br />
PANEL AND EXISTING FIRE ALARM CONTROL PANEL.<br />
t 9732401800<br />
FS<br />
WATER FLOW SWITCH<br />
7. FILE A433 (APPLICATION FOR ELECTRICAL INSPECTION AND SUMMARY OF CONTRACT EQUIPMENT<br />
TO BE INSTALLED) WITH THE DIVISION OF FIRE PREVENTION OF THE FIRE DEPARTMENT.<br />
COST ESTIMATING<br />
DACK CONSULTING SOLUTIONS<br />
MM<br />
D<br />
MONITORING MODULE<br />
DUCT SMOKE DETECTOR<br />
8. FILE APPLICATION WITH THE FIRE DEPARTMENT FOR A CERTIFICATE OF APPROVAL ON THE<br />
ADDITION OF A SUBSYSTEM TO THE EXISTING FACP WHICH HAS FDNY APPROVAL NUMBER.<br />
9. AS REQUIRED BY THE FIRE DEPARTMENT, ARRANGE FOR INSPECTION OF NEW FIRE ALARM<br />
SYSTEM.<br />
2 WILLIAM STREET SUITE 202<br />
WHITE PLAINS, NY. 10601<br />
t 9146867102<br />
10. FIRE ALARM WIRING SHALL <strong>NO</strong>T BE SPLICED. FIRE ALARM WIRING SHALL BE CONTINUOUS FROM<br />
TERMINAL CABINETS OR FROM EQUIPMENT TO EACH DEVICE. SPLICES ARE <strong>NO</strong>T PERMITTED<br />
BETWEEN DEVICES AND/OR CABINETS AT APPROVED JUNCTION AND PULL BOXES. WIRING<br />
SHOULD BE TERMINATED AT TERMINAL BLOCKS OR DEVICES ONLY.<br />
C<br />
11. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH FA VENDOR, MAINTENANCE<br />
CONTRACTOR AND FDNY TO OBTAIN AND/OR MAINTAIN APPROVED SYSTEM STATUS.<br />
1<br />
12. FIRE ALARM CONTRACTOR SHALL VERIFY OPERATION OF EXISTING FIRE ALARM PULL STATIONS<br />
THROUGHOUT THE BUILDING FOR POSSIBLE REPLACEMENT.<br />
13. INSTALLATION SHALL BE IN STRICT CONFORMANCE WITH NFPA 72, NATIONAL ELECTRICAL CODE,<br />
LOCAL CODE(S), AND/OR AUTHORITY HAVING JURISDICTION.<br />
14. ALL WIRING SHALL BE INSTALLED IN RIGID GALVANIZED CONDUIT. ALL CONDUITS SHALL BE<br />
CONCEALED AND 3/4" MINIMUM.<br />
15. COORDINATE MOUNTING LOCATION OF ALL FIRE ALARM DEVICES WITH HVAC EQUIPMENT,<br />
DUCTWORK, AND PIPING IN THE ROOM.<br />
TO 120VAC<br />
SEE ELECTRICAL<br />
DRAWINGS<br />
FSD FSD FSD FSD FSD FSD<br />
FSD FSD FSD<br />
R<br />
R<br />
R<br />
FSD<br />
TO 120VAC<br />
SEE ELECTRICAL<br />
DRAWINGS<br />
16. UNLESS OTHERWISE INDICATED, ALL MOUNTING ELEVATIONS ARE CENTERLINE ELEVATIONS.<br />
17. ARRANGE WIRING FOR <strong>NO</strong>TIFICATION DEVICES SO THAT LOSS OF PORTION OF THE WIRING TO AN<br />
AREA WILL <strong>NO</strong>T RENDER MORE THAN 60% OF THE DEVICES OF EACH TYPE I<strong>NO</strong>PERATIVE. THE<br />
DEVICES SHALL BE CONNECTED TO THE CIRCUITRY BY MEANS OF ALTERNATE CIRCUITS AS TO<br />
MAINTAIN AT LEAST PARTIAL AUDIBILITY/VISIBILITY THROUGHOUT THE ENTIRE AREA.<br />
CM<br />
D<br />
D<br />
D<br />
D<br />
CM<br />
D<br />
D<br />
D<br />
D<br />
CM<br />
D<br />
D<br />
BUILDING DEPARTMENT <strong>NO</strong>TES<br />
SEALS<br />
2ND FLOOR<br />
BIOLOGY<br />
LAB B237<br />
BIOLOGY<br />
LAB B241<br />
BIOLOGY<br />
LAB B243<br />
BIOLOGY<br />
LAB B245<br />
BIOLOGY<br />
LAB D231<br />
120 VAC<br />
POWER<br />
SOURCE<br />
FIRE ALARM<br />
SHUTDOWN<br />
CONTACT<br />
C<br />
CM<br />
NC<br />
FSD<br />
DAMPER<br />
ACTUATOR<br />
FIRE/SMOKE<br />
DAMPER USED IN<br />
<strong>NO</strong>RMAL OPERATION<br />
(TYPICAL)<br />
1. WORK SHALL BE EXECUTED IN FULL COMPLIANCE WITH THE APPLICABLE PROVISIONS OF ALL<br />
LAWS, BYLAWS, STATUTES, ORDINANCES, CODES, RULES, REGULATIONS AND LAWFUL ORDERS<br />
OF PUBLIC AUTHORITIES. THE CONTRACTOR SHALL PROMPTLY <strong>NO</strong>TIFY THE AUTHORITY'S<br />
REPRESENTATIVE OF ANY PORTIONS OF THE WORK IN THE CONTRACT DOCUMENTS THAT ARE AT<br />
VARIANCE WITH THE ABOVE.<br />
2. COMMENCEMENT OF OPERATIONS: AT LEAST 24 HOURS WRITTEN <strong>NO</strong>TICE SHALL BE GIVEN TO<br />
THE COMMISSIONER OF BUILDINGS BEFORE COMMENCING OF WORK. SPECIAL INSPECTION<br />
ITEMS REQUIRE 72 HOURS PRIOR WRITTEN <strong>NO</strong>TICE TO PERSONS RESPONSIBLE FOR INSPECTION<br />
PER SECTION28116.2.3, NEW YORK CITY BUILDING CODE.<br />
3. ALL MATERIALS, ASSEMBLIES, FORMS METHODS OF CONSTRUCTION AND SERVICE EQUIPMENT<br />
SHALL MEET THE FOLLOWING REQUIREMENTS:<br />
A) THEY SHALL HAVE BEEN ACCEPTABLE PRIOR TO THE EFFECTIVE DATE OF THE CODE<br />
BY THE BOARD OF STANDARDS AND APPEALS AND MEA.<br />
B<br />
1ST FLOOR<br />
TS<br />
MM<br />
TS<br />
MM<br />
FS<br />
MM<br />
NEW FIRE<br />
ALARM<br />
CONTROL<br />
PANEL<br />
(ROOM D023)<br />
TIE INTO EXISTING<br />
FIRE ALARM PANEL<br />
EXISTING FIRE<br />
ALARM<br />
CONTROL<br />
PANEL<br />
(ROOM D023)<br />
TO NEXT FIRE/SMOKE<br />
DAMPER<br />
FSD<br />
DAMPER<br />
ACTUATOR<br />
B) THEY SHALL HAVE BEEN ACCEPTED FOR THE USE UNDER THE PRESCRIBED TEST<br />
METHODS BY THE COMMISSIONER (OR)<br />
C) APPROVED BY THE BOARD OF STANDARDS AND APPEALS (106.2).<br />
4. MATERIALS OR ASSEMBLIES REQUIRED TO HAVE A FIRE RESISTANCE RATING SHALL COMPLY<br />
WITH ONE OF THE FOLLOWING:<br />
A) THEY SHALL CONFORM WITH A.I.S.G. "FIRE RESISTANCE RATING", DATED 1985 (OR)<br />
B) THEY SHALL HAVE BEEN TESTED IN ACCORDANCE WITH ASTM E119, STANDARD<br />
METHODS OF FIRE TESTS OF BUILDING CONSTRUCTION AND MATERIALS AND<br />
ACCEPTED BY THE COMMISSIONER (OR)<br />
PROJECT IDENTIFICATION<br />
CONVERSION OF LABORATORIES<br />
SCIENCE BUILDING<br />
QUEENS COLLEGE<br />
6530 Kissena Boulevard<br />
Flushing NY. 11367<br />
CELLAR<br />
C) THEY SHALL HAVE BEEN ACCEPTABLE PRIOR TO THE EFFECTIVE DATE OF THE CODE.<br />
SEE <strong>NO</strong>TE 1<br />
A<br />
FIRE ALARM RISER DIAGRAM<br />
<strong>NO</strong> SCALE<br />
1<br />
TYPICAL FIRE/SMOKE<br />
DAMPER (FSD) SHUTDOWN<br />
1 2 3 4 5<br />
SCALE: NTS<br />
SEQUENCE OF OPERATION:<br />
1. ACTIVATION OF A NEW SPRINKLER WATER FLOW DEVICE OR DUCT SMOKE DETECTOR SHALL:<br />
A. ACTIVATE THE NEW STROBE LIGHTS IN THE 2ND FLOOR LABS TO FLASH CONTINUOUSLY UNTIL<br />
MANUALLY RESET OR AUTOMATICALLY STOP AFTER FIVE MINUTES OF ACTIVATION<br />
B. SHUT DOWN ALL FANS VIA THE EXISTING FACP<br />
C. RECALL ELEVATORS TO RETURN <strong>NO</strong>NSTOP TO THE MAIN LOBBY VIA THE EXISTING FACP.<br />
D. CLOSE ALL FIRE SMOKE DAMPERS<br />
E. ACTIVATE AN ALARM SIGNAL AT THE NEW FACP<br />
2. ACTIVATION OF A TAMPER SWITCH SHALL:<br />
A. ACTIVATE A SUPERVISORY SIGNAL AT THE NEW FACP<br />
3. TROUBLE SIGNAL FROM OPEN CIRCUIT, GROUNDED WIRES, BATTERY FAULT OR WIRE TO WIRE<br />
FAULT SHALL:<br />
A. ACTIVATE A TROUBLE SIGNAL AT THE NEW FACP<br />
4. THE NEW FACP SHALL BE CAPABLE OF ACTIVATING:<br />
A. AN ALARM SIGNAL AT THE EXISTING FACP<br />
B. A TROUBLE SIGNAL AT THE EXISTING FACP<br />
C. A SUPERVISORY SIGNAL AT THE EXISTING FACP<br />
5. ACTIVATION OF A N ALARM CONDITION IN THE EXISTING FACP SHALL:<br />
A. ACTIVATE THE STROBE LIGHTS TO FLASH CONTINUOUSLY UNTIL MANUALLY RESET OR<br />
AUTOMATICALLY STOP AFTER FIVE MINUTES OF ACTIVATION IN THE NEW FACP<br />
B. CLOSE ALL FIRE SMOKE DAMPER IN THE NEW FACP<br />
1 91312 <strong>ADDENDUM</strong> #1<br />
MARK DATE DESCRIPTION<br />
PROJECT <strong>NO</strong>.:<br />
PROJ. MGR:<br />
DRAWN BY:<br />
CHECKED BY:<br />
DESIGN MGR:<br />
ISSUE BLOCK<br />
PAUL USURIELLO<br />
STEPHANIE AMOH<br />
SANDRA BENJAMIN<br />
SHEET TITLE<br />
SYMBOL LIST,<br />
GENERAL<br />
<strong>NO</strong>TES, & RISER<br />
DIAGRAM<br />
FA001.00<br />
63<br />
of 65<br />
2115419<br />
JOHN HANNAH<br />
9/13/2012 12:40:20 PM
ATTACHMENT <strong>NO</strong>. 21<br />
FIRE ALARM SYSTEM PULL STATION CODE CARD<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
ATTACHMENT <strong>NO</strong>. 22<br />
NAMEPLATE DATA FOR EXISTING DISTRIBUTION<br />
PANELS<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
ATTACHMENT <strong>NO</strong>. 23<br />
NAMEPLATE DATA FOR EXISTING PANELBOARD<br />
UNITS<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
ATTACHMENT <strong>NO</strong>. 24<br />
CUNY QUEENS COLLEGE – SCIENCE BUILDING<br />
1 ST FLOOR DIRECTORY<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
ATTACHMENT <strong>NO</strong>. 25<br />
CUNY QUEENS COLLEGE – SCIENCE BUILDING<br />
2 ND FLOOR DIRECTORY<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL
ATTACHMENT <strong>NO</strong>. 26<br />
CUNY QUEENS COLLEGE – SCIENCE BUILDING<br />
3 RD FLOOR DIRECTORY<br />
<strong>STV</strong> Construction, <strong>Inc</strong>.<br />
Addendum No. 1 (092012)<br />
CITYWCUCF010904GC/MECH/EL/PL