08.06.2015 Views

ADDENDUM NO. 1 - STV Group, Inc.

ADDENDUM NO. 1 - STV Group, Inc.

ADDENDUM NO. 1 - STV Group, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PRICE PROPOSAL – ENVELOPE 1<br />

F. UNIT PRICES<br />

The Contractor shall provide the following Unit Prices which include, but are not limited to all<br />

necessary labor, material, taxes, supervision, insurance, equipment, tools, layout, freight,<br />

trucking, engineering, overhead, and profit, etc. in order to provide for a complete installation.<br />

The Unit Prices shall be used for added and deleted work in accordance with the Contract<br />

Documents. The Unit Prices shall be held for the duration of the Contract.<br />

Steel Pipe Sleeves up to 2"<br />

Firestopping<br />

Raceway<br />

Armored Cable<br />

Occupancy Sensor 9 Wall mounted<br />

_________ /Each<br />

_________/location<br />

_________/lf<br />

_________ /lf<br />

_________/Each<br />

Occupancy Sensor 9 Ceiling Mounted<br />

Power Pack for Occupancy Sensor<br />

Panel Board 9 flush mounted<br />

Thermal Magnetic Circuit Breaker<br />

GFCI Circuit Breaker<br />

Duplex Receptacle<br />

Quad Receptacles<br />

Duplex Receptacles 9 GFCI<br />

Quad Receptacles 9 GFCI<br />

Receptacle for Lab Equipment<br />

Toggle Switch<br />

Raceway 9 Wall type<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

_________/Each<br />

69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!