ATTACHMENT <strong>NO</strong>. 12 DWG. P001.00(091312) PLUMBING <strong>NO</strong>TES, SYMBOLS AND ABBREVIATIONS <strong>STV</strong> Construction, <strong>Inc</strong>. Addendum No. 1 (092012) CITYWCUCF010904GC/MECH/EL/PL
1 2 3 4 5 D <strong>STV</strong> <strong>STV</strong> INC. 225 PARK AVE. SOUTH NEW YORK, NY 10003 www.stvinc.com CONSULTANTS ADA AFF CL OR CL CLG CO CONT LIST OF ABBREVIATIONS AMERICAN DISABILITIES ACT ABOVE FINISH FLOOR CENTER LINE CEILING CLEAN OUT CONTINUATION CW HW LG LW LWV CA LIST OF SYMBOLS COLD WATER CW HOT WATER HW LAB GAS LG LAB WASTE LW LAB WASTE VENT LWV COMPRESSED AIR CA GENERAL <strong>NO</strong>TES 1. ALL GAS, VENT, HOT AND COLD WATER PIPING ARE AT CEILING OR IN HUNG CEILING, EXCEPT IN PIPE SPACES OR WHERE OTHERWISE <strong>NO</strong>TED. 2. CONTRACTOR SHALL CHECK AND VERIFY THE EXACT LOCATION OF ALL PIPE PENETRATIONS AND MAKE CERTAIN THERE ARE <strong>NO</strong> OBSTRUCTIONS AND INTERFERENCES. 3. CONTRACTOR SHALL REFER TO AND COORDINATE WITH ARCHITECTURAL DRAWINGS AND WORK FOR EXACT LOCATION OF ALL PLUMBING FIXTURES. 4. ALL PIPES PENETRATED THROUGH WALLS AND FLOORS SHALL BE PROVIDED WITH REQUIRED OPENINGS, SLEEVES, SEALS AND PACKINGS. REFER TO STRUCTURAL DRAWINGS FOR CONCRETE PADS. BUILDING DEPARTMENT PLUMBING <strong>NO</strong>TES ALL PLUMBING WORK SHALL MEET THE REQUIREMENTS OF TITLE 28 NEW YORK CITY PLUMBING CODE (NYCPC) AND NEW YORK CITY FUEL GAS CODE (NYCFC). 1. PROTECTION OF PIPING AS OUTLINED IN SECTION PC 305 SHALL BE PROVIDED AS REQUIRED. 2. ALL PIPING AND MATERIALS SHALL BE AS DIRECTED IN SECTION PC 605. 3. PIPING JOINTS AND CONNECTIONS SHALL BE AS APPROVED IN SECTION PC 605. 4. CONSTRUCTION, QUANTITIES, DEVICES, FIXTURES, FAUCETS, VALVES AND FACILITIES FOR THE DISABLED SHALL BE AS OUTLINED IN SECTION PC 404. 5. TRAPS AND CLEA<strong>NO</strong>UTS SHALL BE AS PER SECTION PC 1002 AND PC 708 ACCORDINGLY. ENVIRONMENTAL MATRIX NEW WORLD 120 EAGLE ROCK AVENUE SUITE 207 EAST HA<strong>NO</strong>VER, NJ. 07936 t 9732401800 COST ESTIMATING DACK CONSULTING SOLUTIONS 2 WILLIAM STREET SUITE 202 WHITE PLAINS, NY. 10601 t 9146867102 C CU FT CW DIA DIM DN DROP (DR) DWG DI DW EEW EL EMS FD FIN FL GPM HW CUBIC FEET COLD WATER DIAMETER DIMENSION PIPE DOWN THRU FLOOR PIPE DROPPING BETWEEN FLOORS DRAWING DEIONIZED WATER DISH WASHER EMERGENCY EYE WASH ELEVATION EMERGENCY SHOWER FLOOR DRAIN FINISHED FLOOR GALLON PER MINUTE HOT WATER VA FD VACUUM VA PIPE UP OR RISE PIPE DN OR DROP CAP CLEA<strong>NO</strong>UT CO WALL CLEA<strong>NO</strong>UT WCO EXISTING PIPING DEMOLITION (EXISTING BE REMOVED) SHUT OFF VALVE (GATE OR BUTTERFLY) CHECK VALVE STOP SHUTOFF VALVE (BALL ) FLOOR DRAIN FD POINT OF NEW CONNECTION POINT OF DISCONNECT 5. PLUMBING: REMOVAL AND RECONNECTION OF SANITARY FIXTURES MUST BE DONE BY A LICENSED MASTER PLUMBER AND FILED WITH DOB AS THE PLUMBING WORK TYPE AS PER NYCPC 2008. 6. PLUMBING DEMOLITION SHALL BE COORDINATED BETWEEN BUILDING FACILITIES, GENERAL CONTRACTOR AND ALL TRADES ON THIS PROJECT. 7. PROVIDE DRAINS AT ALL LOW POINTS 8. PROVIDE VENTS AT ALL HIGH POINTS 9. ALL PLUMBING FIXTURES SHALL BE INSTALLED BY THE PLUMBING CONTRACTOR. SCIENCE SINKS ARE PROVIDED WITH THE MILL WORK REFER TO ARCHITECTURAL DRAWINGS FOR THIS FIXTURES. 10. PLUMBING CONTRACTOR SHALL PROVIDE TEMPORARY SERVICE TO KEEP EQUIPMENT THAT IS <strong>NO</strong>T IN CONTRACT ON LINE. PLUMBING CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF THESE EXISTING EQUIPMENT AND <strong>NO</strong>TIFY THE COLLEGE PRIOR TO ANY SHUTDOWN OF SYSTEM. 11. IF THE COLLEGE GRANTS SHUTDOWNS ONLY IN OFF HOURS, THERE SHALL BE <strong>NO</strong> PREMIUM TIME ADDITIONS TO THE CONTRACT. 12. CONTRACTOR SHALL VERIFY THAT ALL RISER CONTROL VALVE FOR DOMESTIC WATER, GAS, COMPRESSED AIR AND VACUUM PIPING ARE FULLY OPERABLE PRIOR TO ANY AND ALL RISER SHUT DOWN FOR THE PURPOSE OF DEMOLITION AND OR NEW WORK. IF RISER CONTROL VALVES CAN<strong>NO</strong>T SHUTOFF AND ISOLATE THE DESIGNATED RISERS COMPLETELY. THE CONTRACTOR MUST PROVIDE OPTIONAL PRICE FOR THE REMOVAL AND REPLACEMENT OF EACH VALVE THAT IS I<strong>NO</strong>PERABLE. THIS SHOULD BE ADDED IN THE BID COST. PLUMBING DEMOLITION <strong>NO</strong>TES 1. ALL EXISTING SYSTEMS SHALL BE LEFT IN PERFECT WORKING ORDER UPON COMPLETION OF ALL NEW WORK. 6. CONSTRUCTION AND SPACING OF HANGERS AND SUPPORTS SHALL BE AS DIRECTED IN SECTION PC 308. 7. WATER SUPPLY SYSTEM, VALVES, TESTS SHALL BE AS DIRECTED IN CHAPTER 6. VALVES SHALL BE PROVIDED AT RISERS AND ELSEWHERE AS PER SECTION PC 606. 8. SANITARY DRAINAGE PIPING, SIZING, GRADING AND OFFSETS SHALL BE AS OUTLINED IN CHAPTER 7. 9. VENT SIZING, GRADING, CONNECTIONS, LOCATIONS AND OFFSETS SHALL BE AS DIRECTED IN CHAPTER 9. 10. ALL PLUMBING FIXTURES SHALL COMPLY WITH LOCAL LAW 86/2005 GREEN BUILDING STANDARDS OR CHAPTER 4 SECTION PC 401.3 WATER CONSERVATION. 11. MATERIALS, ASSEMBLIES, FORMS AND METHODS OF CONSTRUCTION SHALL BE APPROVED BY BOARD OF STANDARDS AND APPEALS OF THE CITY OF NEW YORK AND CONTRACTOR SHALL PROVIDE OTCR NUMBER OF SAME PURCHASED AND APPROVED FOR INSTALLATION. 12. CONTRACTOR SHALL RETAIN A LICENSED PROFESSIONAL ENGINEER TO PERFORM ALL REQUIRED SPECIAL INSPECTIONS. SAME SHALL BE FILED WITH THE DEPARTMENT OF BUILDING. 13. ALL HOT WATER PIPING TO BE PROVIDED WITH 1 INCH INSULATION 14. GAS PIPING, MATERIAL, SIZING, OFFSET AND INSTALLATION SHALL BE AS OUTLINED IN THE NYC FUEL GAS CODE SEALS B IM IW LG LV LW ICE MAKER INDIRECT WASTE LABORATORY NATURAL GAS LABORATORY VACUUM LABORATORY (ACID) WASTE P X 1 P PLBG RISER DETAIL NUMBER 2. EXACT SIZES AND LOCATIONS OF ALL EXISTING PIPING SHALL BE VERIFIED ON THE JOB. 3. <strong>NO</strong> REMOVED EXISTING PIPING SHALL BE REUSED UNLESS OTHERWISE INDICATED. 4. THE CONTRACTOR SHALL SUBMIT TO THE ARCHITECT FOR APPROVAL, PRIOR TO INSTALLATION, COMPLETE LAYOUT DRAWINGS INDICATING ALL PIPING SIZING. 5. ALL EXISTING PIPING <strong>NO</strong>T SPECIFICALLY INDICATED TO BE REMOVED SHALL REMAIN AS IS. PROJECT IDENTIFICATION CONVERSION OF LABORATORIES SCIENCE BUILDING LWV MGCV MTD NTS PLBG PSI RISE RM S, SAN ST TMV TW LABORATORY (ACID) WASTE VENT MASTER GAS CONTROL VALVE MOUNTED <strong>NO</strong>T TO SCALE PLUMBING POUND SQUARE PER INCH PIPE RISING BETWEEN FLOORS ROOM SANITARY SEDIMENT TRAP THERMOSTATIC MIXING VALVE TEMPERED WATER 6. ANY AND ALL REQUIRED DEMOLITION WORK TO BE PERFORMED ABOVE EXISTING SUSPENDED CEILINGS AND FURRED OUT WALLS SHALL BE DONE AT THE TIME WHEN THE EXISTING CEILINGS AND FURRED OUT WALLS ARE REMOVED BY THE GENERAL CONTRACTOR. 7. ALL EQUIPMENT AND INSTALLATIONS MUST BE EQUAL TO THE STANDARDS OF THE BASE BUILDING. ANY DEVIATION FROM BUILDING STANDARDS WILL BE PERMITTED ONLY IF INDICATED OR SPECIFIED ON THESE PLANS AND SPECIFICATIONS, AND APPROVED. 8. TO ENSURE CONTINUOUS OPERATION, MAKE ALL NECESSARY TEMPORARY CONNECTIONS BETWEEN NEW AND EXISTING WORK. ALL COSTS RESULTING FROM TEMPORARY SHUTDOWNS SHALL BE BORNE BY THIS CONTRACTOR. 9. EXISTING PIPING SHALL BE CUT, REMOVED AND CAPPED AS INDICATED ON DRAWINGS, UNLESS OTHERWISE <strong>NO</strong>TED. 10. DURING CONSTRUCTION. STANDPIPE SYSTEMS REQUIRED DURING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS SHALL BE PROVIDED IN ACCORDANCE WITH BUILDING CODE OF THE CITY OF NEW YORK 2008, SECTION 3303.8 11. ALL OPENINGS CREATED AS A RESULT OF THE DEMOLITION WORK SHALL BE FILLED IN TO MATCH EXISTING CONSTRUCTION BY PLUMBING CONTRACTOR. 1 QUEENS COLLEGE 6660 Kissena Boulevard Flushing NY. 11367 1 9.13.12 <strong>ADDENDUM</strong> #1 MARK DATE DESCRIPTION PROJECT <strong>NO</strong>.: PROJ. MGR: DRAWN BY: CHECKED BY: DESIGN MGR: ISSUE BLOCK 2115419 PAUL USURIELLO K.Robinson L.Matlick SANDRA BENJAMIN A TYP TYPICAL UP PIPE RISING THRU FLOOR 1 2 3 4 5 SHEET TITLE PLUMBING <strong>NO</strong>TES, SYMBOLS AND ABBREVIATIONS P001.00 37 of 65 9/13/2012 9:11:29 AM