Otter (Lutrinae) Care Manual - Association of Zoos and Aquariums
Otter (Lutrinae) Care Manual - Association of Zoos and Aquariums
Otter (Lutrinae) Care Manual - Association of Zoos and Aquariums
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Association</strong> <strong>of</strong> <strong>Zoos</strong> <strong>and</strong> <strong>Aquariums</strong> 143<br />
<strong>Otter</strong> (<strong>Lutrinae</strong>) <strong>Care</strong> <strong>Manual</strong><br />
1) The contractor shall install all piping, valves, <strong>and</strong> equipment in a manner<br />
<strong>and</strong> in locations to avoid obstructions <strong>and</strong> keep openings clear. Pipe <strong>and</strong>/or<br />
equipment shall not be installed where it will present a potential tripping<br />
hazard or below 7’-0” above finished floor, where it would be a potential<br />
head knocking hazard. Installation shall permit direct access to all valves<br />
<strong>and</strong> pieces <strong>of</strong> equipment that will require maintenance. The contractor shall<br />
make any changes as directed by the owner, at no additional expense,<br />
which may be necessary in order to accomplish this purpose.<br />
2) Before being placed in position, all pipe, pipe fittings <strong>and</strong> accessories shall<br />
be cleaned, <strong>and</strong> shall be maintained in a clean condition. Piping shall be<br />
installed <strong>and</strong> aligned in accordance with the Drawings with a tolerance <strong>of</strong> +<br />
1/8-inch in the horizontal <strong>and</strong> vertical directions.<br />
3) All work specified <strong>and</strong> not clearly defined by the Drawings shall be installed<br />
<strong>and</strong> arranged as directed <strong>and</strong> in a manner satisfactory to the owner.<br />
b. Installation <strong>of</strong> Pressure Filter Gravel <strong>and</strong> S<strong>and</strong><br />
1) Preparation <strong>of</strong> Filters: Before placing the media, the contractor shall<br />
determine that all holes in the underdrain system are open.<br />
2) Placing <strong>of</strong> Gravel: The gravel shall be deposited in such a manner as to<br />
avoid endangering the header laterals. Each layer shall be brought up to the<br />
required elevation <strong>and</strong> made level over the entire filter bed area, <strong>and</strong> shall<br />
be smoothed down to a true surface. <strong>Care</strong> shall be taken not to injure<br />
equipment piping <strong>and</strong> coatings in the filter units by walking on or dropping<br />
gravel upon them.<br />
3) Placing <strong>of</strong> S<strong>and</strong>: In placing <strong>of</strong> the s<strong>and</strong> in the filters, extreme care shall be<br />
taken to avoid disturbing the internal piping. Extreme care shall be taken to<br />
protect the internal filter coating. S<strong>and</strong> shall be placed to the appropriate<br />
depth specified <strong>and</strong> shall be level.<br />
c. Installation <strong>of</strong> Piping<br />
1) All PVC Pipe will be transported, stored <strong>and</strong> installed with regard to<br />
manufacturer's recommendations. Bolting <strong>of</strong> PVC flanges shall be in<br />
accordance with manufacturer's recommendations <strong>and</strong> shall not be unduly<br />
stressed through the use <strong>of</strong> excessive torque while tightening bolts. Use <strong>of</strong><br />
torque wrench will be required.<br />
2) All life support piping shall be flushed clean prior to connection to equipment<br />
or tanks.<br />
d. Installation <strong>of</strong> Pumps <strong>and</strong> Motors<br />
1) Pumps <strong>and</strong> motors shall be installed in accordance with the Manufacturer's<br />
Recommendations.<br />
2) Pumps shall be installed with an isolation valve on the suction side <strong>of</strong> the<br />
pump. This valve shall be a true-union ball valve unless it is 4” or greater, in<br />
which case it will be a gate valve. A compound gauge shall be installed<br />
between the pump <strong>and</strong> the isolation valve.<br />
3) Pump shall be installed with an isolation valve on the discharge side <strong>of</strong> the<br />
pump. This valve shall be a butterfly valve. Between the pump <strong>and</strong> the<br />
isolation valve, a swing check valve is required. A pressure gauge shall be<br />
installed between the check valve <strong>and</strong> the isolation valve.<br />
4) Unless otherwise noted, all pumps shall be installed on concrete<br />
housekeeping pads.<br />
e. System Startup<br />
1) The contractor shall provide one full-time mechanical technician who is<br />
familiar with the system for a period <strong>of</strong> 3 days to aid the owner in starting<br />
<strong>and</strong> operating the system.