19.11.2012 Views

Otter (Lutrinae) Care Manual - Association of Zoos and Aquariums

Otter (Lutrinae) Care Manual - Association of Zoos and Aquariums

Otter (Lutrinae) Care Manual - Association of Zoos and Aquariums

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Association</strong> <strong>of</strong> <strong>Zoos</strong> <strong>and</strong> <strong>Aquariums</strong> 143<br />

<strong>Otter</strong> (<strong>Lutrinae</strong>) <strong>Care</strong> <strong>Manual</strong><br />

1) The contractor shall install all piping, valves, <strong>and</strong> equipment in a manner<br />

<strong>and</strong> in locations to avoid obstructions <strong>and</strong> keep openings clear. Pipe <strong>and</strong>/or<br />

equipment shall not be installed where it will present a potential tripping<br />

hazard or below 7’-0” above finished floor, where it would be a potential<br />

head knocking hazard. Installation shall permit direct access to all valves<br />

<strong>and</strong> pieces <strong>of</strong> equipment that will require maintenance. The contractor shall<br />

make any changes as directed by the owner, at no additional expense,<br />

which may be necessary in order to accomplish this purpose.<br />

2) Before being placed in position, all pipe, pipe fittings <strong>and</strong> accessories shall<br />

be cleaned, <strong>and</strong> shall be maintained in a clean condition. Piping shall be<br />

installed <strong>and</strong> aligned in accordance with the Drawings with a tolerance <strong>of</strong> +<br />

1/8-inch in the horizontal <strong>and</strong> vertical directions.<br />

3) All work specified <strong>and</strong> not clearly defined by the Drawings shall be installed<br />

<strong>and</strong> arranged as directed <strong>and</strong> in a manner satisfactory to the owner.<br />

b. Installation <strong>of</strong> Pressure Filter Gravel <strong>and</strong> S<strong>and</strong><br />

1) Preparation <strong>of</strong> Filters: Before placing the media, the contractor shall<br />

determine that all holes in the underdrain system are open.<br />

2) Placing <strong>of</strong> Gravel: The gravel shall be deposited in such a manner as to<br />

avoid endangering the header laterals. Each layer shall be brought up to the<br />

required elevation <strong>and</strong> made level over the entire filter bed area, <strong>and</strong> shall<br />

be smoothed down to a true surface. <strong>Care</strong> shall be taken not to injure<br />

equipment piping <strong>and</strong> coatings in the filter units by walking on or dropping<br />

gravel upon them.<br />

3) Placing <strong>of</strong> S<strong>and</strong>: In placing <strong>of</strong> the s<strong>and</strong> in the filters, extreme care shall be<br />

taken to avoid disturbing the internal piping. Extreme care shall be taken to<br />

protect the internal filter coating. S<strong>and</strong> shall be placed to the appropriate<br />

depth specified <strong>and</strong> shall be level.<br />

c. Installation <strong>of</strong> Piping<br />

1) All PVC Pipe will be transported, stored <strong>and</strong> installed with regard to<br />

manufacturer's recommendations. Bolting <strong>of</strong> PVC flanges shall be in<br />

accordance with manufacturer's recommendations <strong>and</strong> shall not be unduly<br />

stressed through the use <strong>of</strong> excessive torque while tightening bolts. Use <strong>of</strong><br />

torque wrench will be required.<br />

2) All life support piping shall be flushed clean prior to connection to equipment<br />

or tanks.<br />

d. Installation <strong>of</strong> Pumps <strong>and</strong> Motors<br />

1) Pumps <strong>and</strong> motors shall be installed in accordance with the Manufacturer's<br />

Recommendations.<br />

2) Pumps shall be installed with an isolation valve on the suction side <strong>of</strong> the<br />

pump. This valve shall be a true-union ball valve unless it is 4” or greater, in<br />

which case it will be a gate valve. A compound gauge shall be installed<br />

between the pump <strong>and</strong> the isolation valve.<br />

3) Pump shall be installed with an isolation valve on the discharge side <strong>of</strong> the<br />

pump. This valve shall be a butterfly valve. Between the pump <strong>and</strong> the<br />

isolation valve, a swing check valve is required. A pressure gauge shall be<br />

installed between the check valve <strong>and</strong> the isolation valve.<br />

4) Unless otherwise noted, all pumps shall be installed on concrete<br />

housekeeping pads.<br />

e. System Startup<br />

1) The contractor shall provide one full-time mechanical technician who is<br />

familiar with the system for a period <strong>of</strong> 3 days to aid the owner in starting<br />

<strong>and</strong> operating the system.