10.07.2015 Views

Untitled - PRIME Gold

Untitled - PRIME Gold

Untitled - PRIME Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

58 2005 NORILSK NICKEL • ANNUAL REPORT •NORILSK NICKEL • ANNUAL REPORT •200559Metal productionIn 2005, the Group continued its efforts to reduce work-inprogressat the metallurgical plants on the Taimyr Peninsula –6,700 tonnes of nickel (6,400 tonnes in 2004) were used inprocessing. Increased volumes of extracted and processed rawores (4.4% up from 2004) facilitated the growth of internallyproduced nickel by 0.8%, including the tolling processingof high-grade matte at the refining facilities of the KolaPeninsula. The growth of copper production by 1.3% (includingtolling) in comparison to the previous year is explained byincreased supplies of raw ores with copper. The 3.3% increaseof metallic nickel production at the Kola Peninsula is due tothe growth in deliveries of high-grade matte at the TaimyrPeninsula and the production of metals from its own raw ores.The 3% decrease in copper production is explained by thereduction in processing of purchased copper scrap.Volume of metal produced by the Group (excluding Polus and Stillwater)('000 tonnes or as noted)2005 saw an increase in the production of platinum group metals(PGM) both at the Taimyr Peninsula and the Kola Peninsulain comparison to 2004, which was due to increased deliveriesof PGMs with raw ores for processing and the completionof work-in-progress.<strong>Gold</strong> production at MMC Norilsk Nickel (excluding Polus) grewby 12% due to the increase in its supply for processing andthe depletion of work-in-progress at the Taimyr Peninsula.2005 2004 2003Taimyr PeninsulaNickel 123 127 132Copper 361 353 345<strong>Gold</strong> ('000 ounces) 144 123 122Kola PeninsulaNickel (1, 2)From own ores 37 36 35From other materials 83 80 71Total nickel 120 116 107CopperFrom own ores 35 16 15From other materials 56 78 91Total copper 91 94 106<strong>Gold</strong> ('000 ounces) 8 12 14Total volume of metal produced by the Norilsk Nickel Group(excluding Polus and Stillwater)Nickel (1) 243 243 239Copper 452 447 451Palladium ('000 ounces) 3,133 – –Platinum ('000 ounces) 751 – –<strong>Gold</strong> ('000 ounces) 151 135 136Volume of metal produced by Stillwater MiningCompanyIn 2005, Stillwater Mining Company, in accordance with theproduction plan, produced an aggregate of 554,000 ouncesof palladium and platinum. In 2004, 569,000 ounces of palladiumand platinum was produced. The decrease in the aggregateproduction volumes reflects the allocation of operatingresources to improve mining conditions in 2005.Volume of metal produced by Stillwater Mining Company('000 ounces)The production of PGM at Stillwater mine in 2005 fell by 6% toapproximately 381,000 ounces as compared to 405,000 ouncesin 2004. Production of PGM at East Boulder mineincreased by 5% to approximately 173,000 ounces comparedto 2004.The volume of secondary processing of PGM grew in 2005 by27% to 209,000 ounces as compared to 165,000 ounces in2004.2005 2004 2003Stillwater minePalladium 293 311 163Platinum 88 94 49Total 381 405 212East Boulder minePalladium 135 128 63Platinum 38 36 18Total 173 164 81Total volume of metal produced byStillwater Mining CompanyPalladium 428 439 226Platinum 126 130 67Total 554 569 293MMC NORILSK NICKEL NOT INCLUDINGGOLD MINING ASSETS (POLUS)8Notes:(1) Excludes nickel produced from purchased materials.(2) Totals may differ from the sum of the components due to rounding.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!