10.07.2015 Views

Untitled - PRIME Gold

Untitled - PRIME Gold

Untitled - PRIME Gold

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

882005NORILSK NICKEL • ANNUAL REPORT •NORILSK NICKEL • ANNUAL REPORT •200589Slope angles of the pit walls vary from 20 to 55 degrees andthe mining and stripping benches are 5 meters high. The nonoperatingbenches are 30 meters high in the extreme positionwith a slope angle of 65 degrees. The safety berms are8 meters wide.Mined rock is loaded on to trucks by excavators, with wasterock being transported to external dumps and ore to the sortingyard of the gold extraction plant. Ingersol Rand CM-695Drock drills with a drilling diameter of 160 mm are used fordrilling operations; excavators EKG-5A are used to excavateand load the rock, together with the Caterpillar D-9R bulldozer;BelAZ-7540 dump trucks with a carrying capacity of30 tonnes are used to transport ore and overburden. The annualdesign pit output of mined rock is 2 million m 3 and of minedore 800 thousand tonnes.Enrichment process technologyMore than 92% of the gold ore in the Zapadny deposit is inmineral form and only a very small portion is in the shape ofthe thinnest clots found in pyrite and pyrrhotite. The goldextracting plant uses gravitation technology with subsequentcyanidation of the concentrate.OJSC Yuzhno-Verkhoyanskaya MiningCompanyNezhdaninsky depositFrom April 2005, selective mining of the most enriched oresin the Nezhdaninsky deposit by the Yuzhno-VerkhoyanskayaMining Company was suspended. Preparatory works are to beconducted and additional surveys performed on the depositin 2006–2007 to evaluate the various options for the effectivemining of the deposit (open-pit, underground or combinedmethod).OJSC Matrosov MineMatrosov mineIn mid-2004, the mining and extraction of gold by Matrosovmine at the Natalka deposit were suspended and large-scalegeological exploration on the flanks and deep horizons of theNatalka deposit began. Geological exploration is scheduledfor completion in 2006. Based on the results of the exploration,the Group plans to assess the feasibility of developing thedeposit using open pit mining and processing large volumesof ore. Matrosov Mine receives electrical power generatedby the Kolymskaya hydro power plant through OJSCMagadanenergo transmission lines.••• Mineral resourcesand ore reserves9.3In 2005, Polus contracted SRK Consulting (SRK), one of theleading consultants in the mining industry, to perform an auditand classification/estimation of the gold bearing deposits inthe Krasnoyarsk, Irkutsk and Magadan regions in accordancewith internationally accepted standards. The results of theaudit and classification are presented below.As part of its assessment, SRK reviewed all key informationused in the preparation of the latest reports on Polus's orereserves and mineral resources. In particular, SRK reviewedthe following information:• geological setting and nature of the deposits especially withregard to the resource estimation methodologies used;• nature of the gold mineralization;• historical and current sampling and assaying methodologyand coverage;• resource estimation methodology and classification;• results of any reconciliation studies completed to date todemonstrate that the reported resource has been accuratelyestimated; and• pit designs and other technical and financial data to demonstratethat the resource can be technically and economicallyexploited.In undertaking the above work, SRK visited Polus regionaloffices in Krasnoyarsk, Bodaibo and Magadan to review theavailable documentation and supporting geological data andalso undertook site visits to the operations and principal geological-explorationprojects. SRK also observed the mining operationsfirst hand, held discussions with production personnel,reviewed the assaying procedures and, where possible, examinedsamples of recently drilled core. SRK also undertook certaincheck calculations to verify the resource estimation workdone at each operation and, where appropriate, developedeconomic models for each asset so as to restrict the reportedmineral resources to material that has the potential to be economicallyextracted and the ore reserve to material that is justifiableto be mined at the time of reporting.Ore reserves of Polus at 1 September 2005 (1)Deposit Proved reserves Probable reservesMineral resources of Polus at 1 September 2005 (1)Note:(1) Polus, directly or via its subsidiaries, holds licenses for geological exploration and development of these deposits. The reported reserves and resources estimatesfor each deposit are given for the whole deposit and include interests attributable to minority shareholders in the Polus subsidiaries. The company holdingthe license for the development of the Verninskoye deposit was acquired in February 2005. Ore reserves and mineral resources are classified in accordancewith the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code).The audit performed by SRK in early 2005 does not take intoaccount the data on the resources of the deposits acquiredby Polus in the second half of 2005 – deposits at the Kuranakhore field, Nezhdaninskoye and Kyuchus in the Republic ofSakha (Yakutia).During 2005, geological exploration designs were prepared forthese deposits and at the beginning of 2006 SRK started aJORC audit and classification/estimation of the deposits ofthe Kuranakh ore field, as well as at Nezhdaninskoye andKyuchus deposits.Ore Grade <strong>Gold</strong> Ore Grade <strong>Gold</strong>(mln. (g/tonne) (mln. (mln. (g/tonne) (mln.tonne) ounces) tonne) ounces)Olimpiada 20.6 4.6 3.1 71.3 3.8 8.7Oxidized 1.3 15.9 0.7 2.6 8.7 0.7Sulfide 19.3 3.8 2.4 68.7 3.6 8.0Zapadnoye – – – 4.2 2.8 0.4Verninskoye – – – 10.2 3.3 1.1Total 20.6 4.6 3.1 85.7 3.7 10.2Deposit Measured resources Indicated resources Inferred resourcesOre Grade <strong>Gold</strong> Ore Grade <strong>Gold</strong> Ore Grade <strong>Gold</strong>(mln. (g/tonne) (mln. (mln. (g/tonne) (mln. (mln. (g/tonne) (mln.tonne) ounces) tonne) ounces) tonne) ounces)Olimpiada 20.2 4.7 3.1 87.7 3.9 10.9 33.1 3.2 3.4Zapadnoye – – – 5.1 3.2 0.5 1.8 3.3 0.1Verninskoye – – – 26.6 2.0 1.7 10.4 2.9 1.0Natalka – – – 339.6 1.5 16.8 294.0 1.4 13.5Blagodatnoye – – – 55.2 2.5 4.4 83.5 2.2 6.0Chertovo Koryto – – – 13.3 2.4 1.0 14.2 2.2 1.0Titimukhta – – – – – – 9.4 4.3 1.3Total 20.2 4.7 3.1 527.5 2.4 35.3 446.4 1.8 26.3In 2006, a review is planned of the results of the audits conductedin 2005–2006 and an analysis of the requirementsand approaches used in international estimation/classificationpractice. Based on the results of these, a list of the measuresnecessary to obtain the maximum result from the internationalaudit will be developed.GOLD MINING ASSETS OF MMC NORILSK NICKEL(Polus)9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!