10.07.2015 Views

Distillieries - Environmental Clearance

Distillieries - Environmental Clearance

Distillieries - Environmental Clearance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Operational Aspects of an EIAproject authorities to plan additional programmes to deal with the situation, after dulyintimating the concerned local regulatory bodies.4.9 ReportingStructure of the EIA report (Appendix III of the EIA Notification), applicable forDistillery is given in the following Table 4-6. Each task prescribed in ToR shall beincorporated appropriately in the contents in addition to the contents described in thefollowing table.Table 4-6: Generic Structure of EIA DocumentS.NO EIA STRUCTURE CONTENTS1. Introduction Purpose of the report Identification of project & project proponent Brief description of nature, size, location of the project andits importance to the country, region Scope of the study – details of regulatory scoping carriedout (As per the ToR for EIA Studies)2. Project Description Condensed description of those aspects of the project (based onproject feasibility study), likely to cause environmental effects.Details should be provided to give clear picture of the following: Type of project Need for the project Location (maps showing general location, specific location,project boundary & project site layout) Size or magnitude of operation (incl. Associated activitiesrequired by or for the project) Proposed schedule for approval and implementation Technology and process description Project description including drawings showing projectlayout, components of project etc. Schematicrepresentations of the feasibility drawings which giveinformation important for EIA purpose Description of mitigation measures incorporated into theproject to meet environmental standards, environmentaloperating conditions, or other EIA requirements (asrequired by the scope) Assessment of New & untested technology for the risk oftechnological failure3. Description of theEnvironment4. Anticipated<strong>Environmental</strong>Impacts &Mitigation Measures Study area, period, components & methodology Establishment of baseline for VECs, as identified in thescope Base maps of all environmental components Details of investigated environmental impacts due toproject location, possible accidents, project design, projectconstruction, regular operations, final decommissioning orrehabilitation of a completed project Measures for minimizing and / or offsetting adverseimpacts identified Irreversible and irretrievable commitments ofenvironmental components Assessment of significance of impacts (Criteria fordetermining significance, assigning significance)TGM for Distillery Industry August 20104-42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!