10.07.2015 Views

Distillieries - Environmental Clearance

Distillieries - Environmental Clearance

Distillieries - Environmental Clearance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ii.Details of selected siteStatus of land availability, current and post project land usevariationLand details Land requirement and availability Land ownership details such as Government, private, tribal,non-tribal, etc. Total area of the project/site Prevailing land cost detailsLocation Geographical details - Longitude & latitude, village, taluka,district, state Approach to site – roads, railways and airports Distance from nearest residential and industrial areas Distance from nearest water bodies such as river, canal, dam,etc Distance from ecologically sensitive areas In case of flood prone areas, HFL of the site In case of seismic areas, seismic zone, active faults, occurrenceon earthquakes, etc. Proximity from infrastructural facilitiesPhysical characteristics Demography Meteorological data Landuse pattern such as agricultural, barren, forest, etc. anddetails thereof Topography of the area Drainage patterns Soil condition and soil investigation results Ground profile and levelsIV. Anticipated impacts Populationbased on project Flora and faunaoperations on receiving Waterenvironment Soil Air Climate Landscape, etc.V. Proposed broad Preventive measuresmitigation measures Source control measureswhich could effectively Mitigation measures at the receiving environment, etc.be internalized asproject components tohave environmental andsocial acceptance of theproposed siteVI.An indication of any difficulties (technical deficiencies or lack of know-how) encountered bythe developer in compiling the required information.The above listing is not exhaustive. Thus the proponent may provide additional necessaryinformation, felt appropriate, to include in the pre-feasibility study report in support of selectingthe site for the proposed developmental activities. The Concerned EAC/SEAC during scrutiny,may specifically ask for any additional information/data required to substantiate the requirementto prescribe the ToR for EIA studies. However, it is to make clear that all the required furtherinformation by EAC/SEAC may be mentioned in one single letter, within the prescribed time.iv

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!