10.07.2015 Views

2003 Annual Report - Enerflex

2003 Annual Report - Enerflex

2003 Annual Report - Enerflex

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Centurion Petroleum ProjectCenturion Petroleum Corporation, EgyptDesigned and quarterbacked by the Pressondivision, the Centurion Petroleum project inEgypt’s Nile delta region just south of theMediterranean Sea, brought together theservices of <strong>Enerflex</strong> divisions Presson, EFXCompression, Syntech and Pamco, to build agas processing plant in two phases over aperiod of just 22 weeks. The plant wasdesigned to manifold 40 million standardcubic feet per day of natural gas, atapproximately 1200 psig (pounds per squareinch gauge) from the wells to separationunits. Compression, dehydration and sitemetering were also required before sendingthe gas offsite to the pipeline.<strong>Enerflex</strong> <strong>2003</strong> <strong>Annual</strong> <strong>Report</strong>28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!