2 Renmark to border LAP area assessment - EPA - Sa.gov.au
2 Renmark to border LAP area assessment - EPA - Sa.gov.au
2 Renmark to border LAP area assessment - EPA - Sa.gov.au
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 6.7 Current and potential future options for management of risks, MW <strong>LAP</strong> <strong>area</strong><br />
EV= environmental value, ECO=aquatic ecosystem EV, RAW=raw water supply EV, REC=recreational EV;<br />
River Murray and Lower Lakes catchment risk <strong>assessment</strong> for water quality: Results and management options<br />
risk management options which are already being implemented are in italics<br />
Current and potential future options<br />
Lead<br />
stakeholder(s)<br />
Research and<br />
development<br />
Policy<br />
planning<br />
Moni<strong>to</strong>ring Compliance<br />
Capacity<br />
building<br />
Activity Stressor EV Capital on-ground<br />
works<br />
VERY HIGH RISKS<br />
DWLBC, <strong>EPA</strong>,<br />
flood-irriga<strong>to</strong>rs<br />
<strong>EPA</strong> compliance<br />
regime in place<br />
Current moni<strong>to</strong>ring<br />
program underway<br />
EIMPs have been<br />
implemented on<br />
every farm<br />
$30 million <strong>gov</strong>ernment<br />
and irrigated funded<br />
rehabilitation program<br />
currently being<br />
implemented, with<br />
targets of metering<br />
water use by June<br />
2007, no discharge of<br />
irrigation runoff by<br />
June 2008<br />
ECO<br />
REC<br />
RAW<br />
NU<br />
PA<br />
OR<br />
SA<br />
Flood irrigated dairy farm<br />
<strong>area</strong>s<br />
Possible signage<br />
at discharge<br />
points in<br />
recreational<br />
<strong>area</strong>s warning<br />
people not <strong>to</strong><br />
swim in the<br />
vicinity<br />
General (<strong>area</strong>s being<br />
rehabilitated)<br />
*<br />
HIGH RISKS<br />
SA Water, <strong>EPA</strong>,<br />
DWLBC<br />
Investigate possible<br />
treatment plants<br />
<strong>EPA</strong> compliance<br />
regime in place<br />
Moni<strong>to</strong>r pathogen<br />
and other pollutant<br />
levels at off-takes<br />
PA<br />
OR<br />
NU<br />
Flood irrigated dairy farm<br />
<strong>area</strong>s with <strong>to</strong>wnship raw<br />
Research whether it<br />
is possible <strong>to</strong> shut<br />
off off-takes during<br />
rainfall events<br />
RAW Further separate where<br />
possible discharge<br />
points from off-takes or<br />
ensure routing of<br />
pollutants <strong>to</strong> off-take is<br />
not likely<br />
water supplies<br />
Wall Flat<br />
Cowirra<br />
LMRIA: current<br />
rehabilitation<br />
program <strong>to</strong> be<br />
completed as<br />
planned by 2008.<br />
Will result in<br />
limited discharge<br />
Current pipeline<br />
construction <strong>to</strong> direct<br />
Tailem Bend water <strong>to</strong><br />
Jervois <strong>to</strong>wnship thus<br />
separating water supply<br />
inlets further from<br />
drainage discharge<br />
points<br />
Mypolonga<br />
Pompoota<br />
Jervois<br />
*<br />
*<br />
*<br />
*<br />
*<br />
185