11.07.2015 Views

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Feasibility</strong> <strong>of</strong> <strong>Fish</strong> <strong>Passage</strong> <strong>at</strong> <strong>Alameda</strong> <strong>Creek</strong> <strong>Diversion</strong> <strong>Dam</strong>Table A-1Summary <strong>of</strong> Capital Costs for <strong>Passage</strong> Design Components (Continued)ID Description Quantity Unit Unit Cost ($) Amount ($) AssumptionsLong <strong>Fish</strong>way1.0 <strong>Fish</strong> Ladder Structure LF = 800 LF<strong>Fish</strong> Ladder Entrance 1 LS 150,000.00 150,000Dew<strong>at</strong>ering 1 LS 65,000.00 65,000Excav<strong>at</strong>ion 950 CY 80.00 76,000 8' W x 4' H x 800 LFBarrier 1 LS 50,000.00 50,000Base <strong>of</strong> <strong>Fish</strong> Ladder Box 360 CY 800.00 288,000 8' W x 1.5' H x 800 LFSide Forms <strong>of</strong> <strong>Fish</strong> Ladder Box 16,000 SF 50.00 800,000 5' x 4 sides x 800 LFWall Concrete 600 CY 1,000.00 600,000 1' W x 10' H x 2 sides x 800 LFCross Walls 300 CY 1,200.00 360,000 6' L x 10' H x 1' W <strong>at</strong> 6' O.C.G<strong>at</strong>es 1 LS 1,000,000.00 1,000,000Miscellaneous Metals 1 LS 300,000.00 300,000<strong>Dam</strong> Connection 1 LS 200,000.00 200,000<strong>Fish</strong> Ladder Exit 1 LS 150,000.00 150,0002.0 Mobiliz<strong>at</strong>ion, Overhead and Fee (O&F)AllowanceContractor Mobiliz<strong>at</strong>ion and O&FAllowance (30%)1 LS 1,211,700.00 1,211,700Total Raw Cost (March 2009 Dollars) $5,250,700ACDD <strong>Passage</strong> June 2009 Page A-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!