11.07.2015 Views

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix A Minimum Viable Popul<strong>at</strong>ion Size Technical Inform<strong>at</strong>ionTable A-1Summary <strong>of</strong> Capital Costs for <strong>Passage</strong> Design Components (Continued)ID Description Quantity Unit Unit Cost ($) Amount ($) Assumptions<strong>Fish</strong> Screen1.0 <strong>Fish</strong> ScreenFl<strong>at</strong>-Pl<strong>at</strong>e Screen Panes 1,400 SF 1,000.00 1,400,000 Approx. 15' x 90' – HydroscreenDew<strong>at</strong>ering 1 LS 65,000.00 65,000Install<strong>at</strong>ion 1 LS 700,000.00 700,000 Assume 50% screen costBrush Cleaning Mechanism 1 LS 250,000.00 250,000Debris Rack 1 LS 1,000,000.00 1,000,000Solar Panel (Electricity Allowance) 1 LS 300,000.00 300,0002.0 Bypass TunnelDemolition 1 LS 100,000.00 100,000Excav<strong>at</strong>ion 560 CY 80.00 44,800 300' L x 10' W x 5' HConcrete Control Structure 60 CY 1,000.00 60,000 30' L x 5' W x 10' HG<strong>at</strong>es 1 LS 1,000,000.00 1,000,000Channel Wall 120 CY 1,200.00 144,000 100' L x 1' W x 30' HHole through Gravity Structure 30 LF 500.00 15,000Tunnel 30 LF 300.00 9,0003.0 Mobiliz<strong>at</strong>ion, Overhead, and Pr<strong>of</strong>itAllowanceContractor Mobiliz<strong>at</strong>ion and O&PAllowance (30%) 1 LS 1,526,340.00 1,526,340Total Raw Cost (March 2009 Dollars) $6,614,140ACDD <strong>Passage</strong> June 2009 Page A-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!