11.07.2015 Views

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Feasibility</strong> <strong>of</strong> <strong>Fish</strong> <strong>Passage</strong> <strong>at</strong> <strong>Alameda</strong> <strong>Creek</strong> <strong>Diversion</strong> <strong>Dam</strong>Table A-1Summary <strong>of</strong> Capital Costs for <strong>Passage</strong> Design Components (Continued)ID Description Quantity Unit Unit Cost ($) Amount ($) AssumptionsCamp Ohlone Haul Route1.0 Roadway Total Length = 3.1 milesExcav<strong>at</strong>ion 2,750 CY 50.00 137,500 .13 milesPrepare Subgrade 21,850 SY 3.00 65,550 3.1 miles long x 12' wideAsphalt Surfacing Plus Base 21,850 SY 65.00 1,420,250 3.1 miles long x 12' wideSafety 2,600 LF 15.00 39,000 Assume 0.5 mile <strong>of</strong> guardrailDrainage 1 LS 150,000.00 150,0002.0 TransportModified Full Size Pickup Truck 1 EA 60,000.00 60,000Transport Tank 1 EA 4,100.00 4,1003.0<strong>Creek</strong> Access Ramp 1 LS 50,000.00 50,000Mobiliz<strong>at</strong>ion, Overhead and Fee (O&F)AllowanceContractor Mobiliz<strong>at</strong>ion and O&FAllowance (30%) 1 LS 792,705.00 792,705Total Raw Cost (March 2009 Dollars) $3,271,255ACDD <strong>Passage</strong> June 2009 Page A-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!