11.07.2015 Views

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Vertical Fl<strong>at</strong> - Pl<strong>at</strong>e ScreenConfigur<strong>at</strong>ion in the Sediment ChannelApproxim<strong>at</strong>ely 1.8 miles toCalaveras Reservoir<strong>Alameda</strong> <strong>Creek</strong><strong>Diversion</strong> TunnelControl Outlet StructureNew WallSediment ChannelBypass ChannelTie-In New Wallto Existing StructureProposed CDRPNew Valve 1Sluiceway 2Existing Trash RacksProposed CDRP FlowBypass Tunnel 1Main Channel<strong>Alameda</strong> <strong>Creek</strong>Sluiceway 1<strong>Fish</strong> ScreenBypass Channel<strong>Alameda</strong> <strong>Creek</strong>UpstreamApronOgee Crest SpillwayDownstreamApronExisting Fe<strong>at</strong>ures (in black)NScreen Design Components(in red)CDRP Proposed Fe<strong>at</strong>ures(in purple)Concrete <strong>Diversion</strong><strong>Dam</strong> Structure1 Based on URS 2008 and SFPUC 2008aPlanNot to scale<strong>Alameda</strong> <strong>Creek</strong>Screen System in the Sediment Channel<strong>Feasibility</strong> <strong>of</strong> <strong>Fish</strong> <strong>Passage</strong> <strong>at</strong> <strong>Alameda</strong> <strong>Creek</strong> <strong>Diversion</strong> <strong>Dam</strong>Technical MemorandumJune 2009Figure 4-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!