11.07.2015 Views

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

Feasibility of Fish Passage at Alameda Creek Diversion Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Feasibility</strong> <strong>of</strong> <strong>Fish</strong> <strong>Passage</strong> <strong>at</strong> <strong>Alameda</strong> <strong>Creek</strong> <strong>Diversion</strong> <strong>Dam</strong>Camp Ohlone Haul Route 1Table A-2ACDD <strong>Passage</strong> AssessmentPreliminary Opinion <strong>of</strong> Probable Annual O&M Costs (Continued)Item Quantity Unit Cost Amount TotalM<strong>at</strong>erial Costs $32,700Estim<strong>at</strong>ed <strong>at</strong> 0.5% <strong>of</strong> total capital cost (see Table 5-1) 0.005 6,540,000 32,700Total Annual O&M Costs $32,700<strong>Fish</strong> ScreensLabor $58,398Maintenance person labor cost (average 3.0 hrs/day) 0.38 FTE 133,500 50,730Seasonal fisheries technician direct labor cost (average 3.0 hrs/day for120-day peak emigr<strong>at</strong>ion period) 0.12 FTE 63,900 7,668M<strong>at</strong>erial Costs $66,100Estim<strong>at</strong>ed <strong>at</strong> 0.5% <strong>of</strong> total capital cost (see Table 5-1) 0.005 13,220,000 66,100Fuel costs (backup gener<strong>at</strong>ors to solar power supply)Daily fuel costs 2 1 10,816 10,816 $10,816Total Annual O&M Costs $135,314Notes:Labor costs include fringe and overhead (3.0 multiplier assumed).FTE = Full time equivalent1All labor for trap and haul included in Confluence <strong>Fish</strong> Facility O&M cost estim<strong>at</strong>e.2Back up power unit fuel cost estim<strong>at</strong>e:Item Work Dur<strong>at</strong>ion Quantity (GAL) Unit Cost ($/GAL) AmountGener<strong>at</strong>or 1 2 hr/wk – 10 gal/hr – 52 wk/yr 1,040 5.00 5,200Gener<strong>at</strong>or 2 2 hr/wk – 6 gal/hr – 52 wk/yr 624 5.00 3,120Fuel use subtotal: 8,320Contingency (30%): 2496Fuel use total with contingency: $10,816ACDD <strong>Passage</strong> June 2009 Page A-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!