Feasibility of Fish Passage at Alameda Creek Diversion Dam
Feasibility of Fish Passage at Alameda Creek Diversion Dam
Feasibility of Fish Passage at Alameda Creek Diversion Dam
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix ACost Estim<strong>at</strong>e Backup Calcul<strong>at</strong>ionsAppendix ACost Estim<strong>at</strong>e Backup Calcul<strong>at</strong>ionsEach fish passage design component carried forward through the preliminary analysis was analyzedfurther based on its cost. This appendix describes the development <strong>of</strong> raw capital costs (Table A-1)and oper<strong>at</strong>ing and maintenance costs (Table A-2) for each design component. Raw capital cost andoper<strong>at</strong>ing and maintenance cost assumptions are outlined on the following pages.Table A-1Summary <strong>of</strong> Capital Costs for <strong>Passage</strong> DesignComponentsDescriptionCostLong <strong>Fish</strong>way $5,251,000Confluence <strong>Fish</strong> Facility $803,000Camp Ohlone Haul Route $3,270,000<strong>Fish</strong> Screen $6,610,000ACDD <strong>Passage</strong> June 2009 Page A-1