- Page 2 and 3: FUSION FOR ENERGYAnnual ActivityRep
- Page 6 and 7: Fact SheetName:Location:Established
- Page 8 and 9: I am pleased to note that F4E’s I
- Page 10: An important activity of F4E during
- Page 13 and 14: CHAPTER 1Fusion for EnergyThe Europ
- Page 16: FUSION FOR ENERGYChapter 2Fusion En
- Page 19 and 20: Broader ApproachIn February 2007 Eu
- Page 22 and 23: FUSION FOR ENERGYChapter 3MainAchie
- Page 24 and 25: Site, Buildings and Power Supplies
- Page 26 and 27: PA value total vs signed803.74081kI
- Page 28 and 29: Fig. 6: Portal Machine (courtesy of
- Page 30 and 31: • The overall progress has been i
- Page 32 and 33: issues for GRT-051. These delays im
- Page 34 and 35: The WP 2010 and Project Plan have b
- Page 36 and 37: • pre-conceptual design integrati
- Page 38 and 39: Fig. 21: PF coil building progress
- Page 40 and 41: Fig. 23: European Test Blanket Modu
- Page 42 and 43: Materials and FabricationDuring 201
- Page 44 and 45: Fig. 27: The dedicated test loop HE
- Page 46 and 47: Fig. 28: Ion source and RF chain on
- Page 48: Fig. 30: High pressure rinsing of t
- Page 51 and 52: CHAPTER 4Contracts and ProcurementP
- Page 53 and 54: Legal MattersOptimisation of F4E’
- Page 55 and 56:
In the case of the administrative b
- Page 57 and 58:
Social DialogueThis year, social di
- Page 59 and 60:
Establishment and Continual Improve
- Page 61 and 62:
Data ProtectionF4E is committed to
- Page 63 and 64:
CHAPTER 4Information and Communicat
- Page 65 and 66:
CHAPTER 4External Relations with In
- Page 71 and 72:
• Took note of the 2009 Annual Re
- Page 73 and 74:
Ad-Hoc or Working GroupsDuring 2010
- Page 75 and 76:
• Providing comments on the draft
- Page 77 and 78:
FUSION FOR ENERGYAnnex IList of Acr
- Page 79 and 80:
HIPHNBHVIAEAICICHIFERCIFMIFIN-DAITE
- Page 81 and 82:
FUSION FOR ENERGYAnnex IIImplementa
- Page 83 and 84:
CONTRACTS AND GRANTSOperational Pro
- Page 85 and 86:
Contract Reference Contract Title C
- Page 87 and 88:
Awarded ContractsContract Reference
- Page 89 and 90:
AgreementReferenceF4E-GRT-254 (PNS-
- Page 91 and 92:
ReferenceTitleCreditedAmount(in kEU
- Page 93 and 94:
F4E Ref.No.ITER Ref. No. Title Dead
- Page 95 and 96:
FUSION FOR ENERGYAnnex IIIRiskManag
- Page 97 and 98:
ConsequenceCategoryCrisisCriticalCo
- Page 99 and 100:
FUSION FOR ENERGYAnnex IVCompositio
- Page 101 and 102:
composition of ad-hoc groupsF4E Imp
- Page 103 and 104:
FUSION FOR ENERGYAnnex VOrganisatio
- Page 105 and 106:
FUSION FOR ENERGYAnnex VIImplementa
- Page 107 and 108:
FUSION FOR ENERGYAnnex VIIITER Cred
- Page 109 and 110:
FUSION FOR ENERGYAnnex VIIIStaffing
- Page 111 and 112:
nationality - officials and tempora
- Page 113 and 114:
FUSION FOR ENERGYAnnex IXDeclaratio
- Page 115 and 116:
FUSION FOR ENERGYAnnex XAnalysis an
- Page 117:
Europe Direct is a service to help