28.11.2012 Views

Northern San Luis Obispo County Coastal Trail Master Plan

Northern San Luis Obispo County Coastal Trail Master Plan

Northern San Luis Obispo County Coastal Trail Master Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Northern</strong> <strong>San</strong> <strong>Luis</strong> <strong>Obispo</strong> <strong>County</strong> <strong>Coastal</strong> <strong>Trail</strong> <strong>Master</strong> <strong>Plan</strong><br />

5-6<br />

5. Widen highway shoulders to at least 4 feet (assumed to be accomplished by Caltrans as part of<br />

objectives of Highway Transportation Concept Report)<br />

6. CCT signs and wayfinding<br />

Implementation Steps:<br />

1. Negotiations – interagency/partner agreements, i.e. with Hearst Corporation<br />

2. Site survey – boundaries and topography<br />

3. Prepare preliminary design plans<br />

4. Technical studies – biological, cultural resources<br />

5. Environmental studies and document (including CEQA and NEPA)<br />

6. Permit application preparation and follow-up<br />

7. Prepare construction documents<br />

8. Project bidding and contracting<br />

9. Construction and related services<br />

Permit Requirements:<br />

1. <strong>Coastal</strong> Development Permit (CDP), SLO <strong>County</strong> – all improvements<br />

2. Grading Permit Approval from SLO <strong>County</strong><br />

3. Compliance with Caltrans Scenic Easement<br />

4. Caltrans encroachment permit<br />

5. Potentially - U.S. Army Corps of Engineers (COE) Section 404 Nationwide wetlands permit<br />

Operation and Management Requirements:<br />

Responsible Party: DPR<br />

� Facility monitoring and use management<br />

� Maintain trails, replace signs, repair fences and gates<br />

� Coordinate with user groups; potentially docents<br />

Segment 2-2: Ragged Point to Arroyo de la Cruz (2.5 miles)<br />

Improvements:<br />

1. Construct approximately 2.2 miles of native surface coastal trail<br />

2. Close and restore about 0.2 miles of existing trail parallel to Arroyo de La Cruz<br />

3. Widen highway shoulders to at least 4 feet (assumed to be accomplished by Caltrans as part of<br />

objectives of Highway Transportation Concept Report)<br />

4. Bridges, boardwalks or sidepath culvert crossings with retaining walls over drainages (69-3, 69-2, 69-<br />

1, 68-4, 68-3 and 68-2 – Arroyo de los Chinos)<br />

5. One consolidated trail bridge over drainages (68-1,67-3 and 67-2) and trail bridge over (67-1)<br />

6. <strong>Trail</strong> bridge or seasonal bridge over Arroyo de La Cruz (66-1)<br />

7. Improve and formalize existing parking as trail Staging Area just south of Arroyo de La Cruz<br />

8. Restoration and screening plantings – native<br />

9. CCT signs and wayfinding<br />

Implementation Steps:<br />

1. Negotiations – make interagency/partner agreements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!