Local Planning Policy Framework - Moreland City Council
Local Planning Policy Framework - Moreland City Council
Local Planning Policy Framework - Moreland City Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Kevin Dowsey (Coburg resident and business operator)<br />
Elsa Sturma (Coburg resident)<br />
Allan Testa (Coburg resident)<br />
Technical Reference Group<br />
Central Coburg 2020 Background Report [ Introduction ]<br />
A Technical Reference Group (TRG) of key <strong>Council</strong> officers ensured that the<br />
development of Central Coburg 2020 was reviewed by relevant technical staff, eg<br />
traffic, open space, community planning, economic aspects. This helped to ensure an<br />
integrated approach to the development of the plan<br />
The role of the TRG was to review the technical detail of the plan as it developed and<br />
to identify any potential inconsistencies with other <strong>Council</strong> policies and strategies.<br />
Members of the TRG included managers and key <strong>Council</strong> officers from <strong>City</strong><br />
Development, <strong>City</strong> Infrastructure and Social Development.<br />
Discussion Papers<br />
Phase 1 Research and Analysis involved the preparation of a series of Discussion<br />
Papers to gain a comprehensive understanding of the existing conditions and<br />
opportunities in the area. The content of the Discussion Papers is summarised in<br />
chapter 2 (relevant section numbers are shown in brackets).<br />
Demographic Analysis (2.1)<br />
<strong>Planning</strong> and Land Use Analysis (2.2)<br />
Economic Analysis (2.3)<br />
Urban Design and Open Space Analysis (2.4)<br />
Transport Analysis (2.5)<br />
Community Facilities Analysis (2.6)<br />
Consultation<br />
? The consultation program has been designed to ensure that the community and<br />
key stakeholders played a meaningful role in the development and implementation<br />
of Central Coburg 2020.<br />
The consultation program consisted of the following key stages:<br />
? Project Initiation, Steering Committee and Mailing List<br />
? Needs and Issues identification<br />
? Opportunities Analysis Design Workshop<br />
? Discussion and Feedback on Vision and key outcomes<br />
Consultation stages yet to be undertaken include:<br />
? Discussion and Feedback on Draft Plan<br />
These key stages consisted of the following consultation methods:<br />
? Newsletters<br />
? Press Releases<br />
? Mailing List<br />
? Visioning Workshops<br />
? Meetings with targeted interest groups<br />
? Community Surveys<br />
? Postcards<br />
? Sausage Sizzle<br />
? Street and library displays<br />
3