29.11.2012 Views

Essential Skills - National Adult Literacy Database

Essential Skills - National Adult Literacy Database

Essential Skills - National Adult Literacy Database

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

W W<br />

<strong>Essential</strong> <strong>Skills</strong> and the Northern Oil and Gas Workforce Final Report and Resource Guide<br />

ConocoPhillips Canada<br />

(North) Limited<br />

www.conocophillips.ca<br />

ConocoPhillips Canada (North) Limited holds a 75% interest in, and operates, the Parsons Lake<br />

natural gas field. ConocoPhillips Canada (North) Limited is a wholly owned subsidiary of<br />

ConocoPhillips Canada Limited, one of Canada’s largest oil and natural gas<br />

exploration and production companies and a leading marketer and distributor of crude oil,<br />

natural gas and natural gas liquids.<br />

Shell Canada Limited<br />

www.shell.ca<br />

Shell Canada Limited holds a 100% interest in, and operates, the Niglintgak<br />

natural gas field. Shell Canada Limited is one of the largest integrated petroleum companies in<br />

Canada. It is the country’s largest producer of sulphur, a major producer<br />

of natural gas, natural gas liquids and bitumen, and a leading manufacturer, distributor and<br />

marketer of refined petroleum products.<br />

ExxonMobil Canada Properties<br />

www.exxonmobil.com<br />

ExxonMobil Canada Properties holds a 25% interest in the Parsons Lake natural<br />

gas field. ExxonMobil Canada Properties is a partnership of ExxonMobil Canada Ltd.<br />

and its wholly owned subsidiary, ExxonMobil Resources Ltd. It is one of Canada’s leading<br />

producers of conventional crude oil, heavy oil, natural gas and natural gas liquids.<br />

Did You Know?<br />

The proposed Mackenzie Gas Project would become one of the most complex undertakings in<br />

the NWT to date:<br />

• to assist with community consultation, the project has staff in three regional offices.<br />

• during the peak construction season, up to 7000 people will work on pipeline construction<br />

• the pipeline system will be built in sections "or spreads" ranging in length from 120 to 160<br />

kilometres<br />

• more than 40 self-sufficient camps will be needed to house the thousands of construction<br />

workers and support personnel<br />

• the project will make use of four to five million cubic metres of natural construction<br />

material such as gravel and sand<br />

• about 19 barge landing sites will be required to land materials transported by barge down<br />

the Mackenzie River – eight of these sites already exist<br />

• initially, four compressor stations could be built but as new natural gas discoveries are<br />

developed, more compressor stations may be added<br />

• compressor stations will be monitored 24/7 from a central operations control center<br />

• total length of the gathering system, natural gas liquids pipeline and natural gas pipeline is<br />

about 1900 kilometres<br />

• the natural gas pipeline will take gas from a processing facility near Inuvik to an<br />

interconnect facility in northwestern Alberta – a distance of about 1,200 kilometres.<br />

• 1200 kilometres is about the same distance as driving the round trip from Edmonton to<br />

Calgary and back twice.<br />

124